Bid Tabulations for the Letting of 4/12/2023 LA DOTD Headquarters

Proposal:H.015241.6-R1
Parish:Statewide
Description:BARGE 305-041 5 YR. DRYDOCK (2023)
Type Construction:DRYDOCKING, INSPECTION, MISCELLANEOUS STEEL REPAIRS, PAINTING, AND RELATED WORK.
Estimated Construction Cost:$283,000.00
Rank License BidderConstruction Bid
133678Sealevel Construction Inc.$328,700.00
204852Conrad Shipyard, LLC.$498,728.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Sealevel Construction Inc.
- 2 -
Conrad Shipyard, LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001NS-FBT-00100Anodes 1     LUMP3,700.003,700.003,270.003,270.00
0002NS-FBT-00160Bulwark and Deck Painting 1     LUMP39,500.0039,500.00110,000.00110,000.00
0003NS-FBT-00340Dry Docking 1     LUMP42,800.0042,800.0014,529.0014,529.00
0004NS-FBT-00360Dry Docking Inspection 1     LUMP37,100.0037,100.0017,100.0017,100.00
0006NS-FBT-00540Hull Painting 1     LUMP16,750.0016,750.0065,000.0065,000.00
0007NS-FBT-00645Landing Barge Electrical System 1     LUMP12,100.0012,100.008,430.008,430.00
0008NS-FBT-00720Manholes 1     LUMP7,900.007,900.008,256.008,256.00
0009NS-FBT-00741Miscellaneous Steel Repairs 3,000     LB18.2554,750.0035.00105,000.00
0010NS-FBT-01040Repair and Replace Piping 1     LUMP47,250.0047,250.0068,357.0068,357.00
0011NS-FBT-01190Replace Air Conditioning Unit1     LUMP2,250.002,250.006,750.006,750.00
0012NS-FBT-01320Sea Chest and Bilge Suction Valves 1     LUMP22,000.0022,000.0025,836.0025,836.00
0013NS-FBT-01440Sonic Gauging 1     LUMP4,700.004,700.004,200.004,200.00
0014NS-FBT-01480Void and Ballast Compartment Treatment and Painting 1     LUMP37,900.0037,900.0062,000.0062,000.00
         
  CONTRACTOR TOTAL   328,700.00 498,728.00