Proposal:H.011909.6-R1
Parish:Vernon
Routes:US 171
Description:ROUNDABOUT: US 171 AT BOONE ST.
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$9,267,176.70
| Rank | License | Bidder | Construction Bid |
| 1 | 27239 | Apeck Construction, LLC | $9,770,606.43 |
| 2 | 30774 | Progressive Construction Co., LLC | $10,530,070.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Apeck Construction, LLC | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 5,542.99 | 5,542.99 | 150,000.00 | 150,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 12,020.5 | SQYD | 24.17 | 290,535.49 | 15.00 | 180,307.50 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 15,365.4 | SQYD | 13.50 | 207,432.90 | 12.00 | 184,384.80 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 15 | EACH | 606.25 | 9,093.75 | 2,000.00 | 30,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,711 | SQYD | 15.47 | 57,409.17 | 13.00 | 48,243.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 430.7 | LNFT | 22.22 | 9,570.15 | 12.00 | 5,168.40 | | 0007 | 202-02-26000 | Removal of Manholes | 3 | EACH | 1,159.91 | 3,479.73 | 2,800.00 | 8,400.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 105 | SQYD | 36.19 | 3,799.95 | 15.00 | 1,575.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) All Sizes | 251 | LNFT | 48.34 | 12,133.34 | 90.00 | 22,590.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) All Sizes | 1,351 | LNFT | 48.33 | 65,293.83 | 78.00 | 105,378.00 | | 0011 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,455.01 | 1,455.01 | 1,500.00 | 1,500.00 | | 0012 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,176 | SQYD | 24.74 | 177,534.24 | 15.00 | 107,640.00 | | 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 16,647.71 | 16,647.71 | 20,000.00 | 20,000.00 | | 0014 | 203-01-00100 | General Excavation | 9,033 | CUYD | 25.92 | 234,135.36 | 20.00 | 180,660.00 | | 0015 | 203-03-00100 | Embankment | 10,199 | CUYD | 33.07 | 337,280.93 | 25.00 | 254,975.00 | | 0016 | 203-04-00100 | Nonplastic Embankment | 5 | CUYD | 1,031.17 | 5,155.85 | 140.00 | 700.00 | | 0017 | 203-08-00100 | Geotextile Fabric | 33 | SQYD | 22.91 | 756.03 | 12.00 | 396.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 363 | EACH | 42.44 | 15,405.72 | 35.00 | 12,705.00 | | 0019 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 15 | EACH | 821.45 | 12,321.75 | 1,200.00 | 18,000.00 | | 0020 | 204-06-00100 | Temporary Silt Fencing | 8,202 | LNFT | 2.55 | 20,915.10 | 4.00 | 32,808.00 | | 0021 | 302-02-10020 | Class II Base Course (10" Thick) (Crushed Stone) | 11,685.7 | SQYD | 61.27 | 715,982.84 | 55.00 | 642,713.50 | | 0022 | 302-02-10030 | Class II Base Course (10" Thick) (Asphalt Concrete Base on Embankment Layer) | 5,418 | SQYD | 112.67 | 610,446.06 | 60.00 | 325,080.00 | | 0023 | 304-01-00100 | Lime | 82.82 | TON | 351.84 | 29,139.39 | 520.00 | 43,066.40 | | 0024 | 304-05-00100 | Lime Treatment (Type E) | 5,842 | SQYD | 11.10 | 64,846.20 | 20.00 | 116,840.00 | | 0025 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 193.13 | 38,626.00 | 200.00 | 40,000.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 1,900.4 | TON | 191.73 | 364,363.69 | 235.00 | 446,594.00 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 308.8 | TON | 207.49 | 64,072.91 | 250.00 | 77,200.00 | | 0028 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 313.3 | SQYD | 150.25 | 47,073.33 | 160.00 | 50,128.00 | | 0029 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 11,781.1 | SQYD | 150.95 | 1,778,357.05 | 160.00 | 1,884,976.00 | | 0030 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) (Brick Red-Broom Finish)(13 Inch Thick) | 559.2 | SQYD | 251.22 | 140,482.22 | 260.00 | 145,392.00 | | 0031 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,859 | LNFT | 140.24 | 260,706.16 | 135.00 | 250,965.00 | | 0032 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 120 | LNFT | 146.27 | 17,552.40 | 145.00 | 17,400.00 | | 0033 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 208 | LNFT | 149.14 | 31,021.12 | 165.00 | 34,320.00 | | 0034 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 178 | LNFT | 378.30 | 67,337.40 | 245.00 | 43,610.00 | | 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 164 | LNFT | 189.15 | 31,020.60 | 235.00 | 38,540.00 | | 0036 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 16 | LNFT | 318.89 | 5,102.24 | 285.00 | 4,560.00 | | 0037 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,031.27 | 6,062.54 | 3,000.00 | 6,000.00 | | 0038 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 700 | LNFT | 15.76 | 11,032.00 | 7.00 | 4,900.00 | | 0039 | 702-02-00100 | Manholes (MH-06) | 9 | EACH | 9,275.67 | 83,481.03 | 6,000.00 | 54,000.00 | | 0040 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 5,638.15 | 73,295.95 | 5,500.00 | 71,500.00 | | 0041 | 702-03-00500 | Catch Basins (CB-06) | 3 | EACH | 7,881.29 | 23,643.87 | 8,000.00 | 24,000.00 | | 0042 | 702-03-00600 | Catch Basins (CB-07) | 6 | EACH | 9,700.05 | 58,200.30 | 9,500.00 | 57,000.00 | | 0043 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 18,793.84 | 18,793.84 | 16,000.00 | 16,000.00 | | 0044 | 702-03-00800 | Catch Basins (CB-09) | 8 | EACH | 6,668.78 | 53,350.24 | 7,500.00 | 60,000.00 | | 0045 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 5,972.24 | 5,972.24 | 5,800.00 | 5,800.00 | | 0046 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 6,668.79 | 13,337.58 | 7,500.00 | 15,000.00 | | 0047 | 703-01-00100 | Shoulder Underdrain Systems | 2,863 | LNFT | 43.97 | 125,886.11 | 28.00 | 80,164.00 | | 0048 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 393.9 | LNFT | 40.62 | 16,000.22 | 40.00 | 15,756.00 | | 0049 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.80 | 13,580.00 | 130.00 | 13,000.00 | | 0050 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,365.02 | 17,460.08 | 4,200.00 | 16,800.00 | | 0051 | 706-01-00100 | Concrete Walk (4" Thick) | 1,433.1 | SQYD | 131.88 | 188,997.23 | 90.00 | 128,979.00 | | 0052 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) 4" | 415.1 | SQYD | 206.69 | 85,797.02 | 145.00 | 60,189.50 | | 0053 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) 4" | 130.5 | SQYD | 207.78 | 27,115.29 | 145.00 | 18,922.50 | | 0054 | 706-02-00200 | Concrete Drive (6" Thick) | 1,095.2 | SQYD | 120.77 | 132,267.30 | 125.00 | 136,900.00 | | 0055 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 231.1 | SQYD | 105.13 | 24,295.54 | 110.00 | 25,421.00 | | 0056 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Brick Red - Broom Finished)(5") | 1,516.4 | SQYD | 129.02 | 195,645.93 | 130.00 | 197,132.00 | | 0057 | 706-04-00110 | Curb Ramps (Type 4) | 107.4 | SQYD | 189.94 | 20,399.56 | 350.00 | 37,590.00 | | 0058 | 706-04-00110 | Curb Ramps (Type 7) | 53.2 | SQYD | 241.09 | 12,825.99 | 375.00 | 19,950.00 | | 0059 | 707-01-00100 | Concrete Curb | 7,392.8 | LNFT | 45.76 | 338,294.53 | 22.00 | 162,641.60 | | 0060 | 707-03-00100 | Combination Concrete Curb and Gutter | 272.5 | LNFT | 71.50 | 19,483.75 | 65.00 | 17,712.50 | | 0061 | 708-01-00100 | Right-of-Way Monument | 17 | EACH | 1,212.51 | 20,612.67 | 415.00 | 7,055.00 | | 0062 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 86,035.55 | 86,035.55 | 450,000.00 | 450,000.00 | | 0063 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 109 | LNFT | 1.82 | 198.38 | 1.70 | 185.30 | | 0064 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.103 | MILE | 9,906.02 | 1,020.32 | 23,900.00 | 2,461.70 | | 0065 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 1.69 | MILE | 9,275.67 | 15,675.88 | 11,000.00 | 18,590.00 | | 0066 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 10.771 | MILE | 16,412.90 | 176,783.35 | 17,300.00 | 186,338.30 | | 0067 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 546 | EACH | 9.70 | 5,296.20 | 10.00 | 5,460.00 | | 0068 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 3,031.26 | 1,515.63 | 150.00 | 75.00 | | 0069 | 717-01-00100 | Seeding | 75 | LB | 30.31 | 2,273.25 | 18.00 | 1,350.00 | | 0070 | 718-01-00100 | Fertilizer | 2,512 | LB | 1.03 | 2,587.36 | 0.80 | 2,009.60 | | 0071 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,300 | SQYD | 2.43 | 3,159.00 | 2.00 | 2,600.00 | | 0072 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 230 | SQYD | 3.46 | 795.80 | 2.00 | 460.00 | | 0073 | 725-01-00100 | Temporary Detour Roads | 2,470.7 | SQYD | 192.49 | 475,585.04 | 100.00 | 247,070.00 | | 0074 | 726-01-00100 | Bedding Material | 969.2 | CUYD | 162.48 | 157,475.62 | 110.00 | 106,612.00 | | 0075 | 727-01-00100 | Mobilization | 1 | LUMP | 378,774.76 | 378,774.76 | 1,000,000.00 | 1,000,000.00 | | 0076 | 729-01-00100 | Sign (Type A) | 516.7 | SQFT | 46.68 | 24,119.56 | 45.00 | 23,251.50 | | 0077 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 121.25 | 485.00 | 120.00 | 480.00 | | 0078 | 731-02-00100 | Reflectorized Raised Pavement Markers | 648 | EACH | 10.91 | 7,069.68 | 11.00 | 7,128.00 | | 0079 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 365 | LNFT | 24.25 | 8,851.25 | 23.00 | 8,395.00 | | 0080 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.383 | MILE | 13,987.85 | 75,296.60 | 8,500.00 | 45,755.50 | | 0081 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.001 | MILE | 242,500.00 | 242.50 | 23,500.00 | 23.50 | | 0082 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.339 | MILE | 3,640.23 | 4,874.27 | 3,500.00 | 4,686.50 | | 0083 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.054 | MILE | 5,119.44 | 276.45 | 4,500.00 | 243.00 | | 0084 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.187 | MILE | 20,327.33 | 3,801.21 | 19,400.00 | 3,627.80 | | 0085 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.02 | MILE | 23,352.50 | 467.05 | 22,650.00 | 453.00 | | 0086 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.04 | MILE | 66,687.75 | 2,667.51 | 64,700.00 | 2,588.00 | | 0087 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 1.279 | MILE | 11,800.37 | 15,092.67 | 11,000.00 | 14,069.00 | | 0088 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 606.25 | 2,425.00 | 600.00 | 2,400.00 | | 0089 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 1,212.51 | 4,850.04 | 1,200.00 | 4,800.00 | | 0090 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 606.25 | 2,425.00 | 600.00 | 2,400.00 | | 0091 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 606.25 | 3,031.25 | 600.00 | 3,000.00 | | 0092 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 788.13 | 1,576.26 | 750.00 | 1,500.00 | | 0093 | 732-04-01130 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTRC) | 3 | EACH | 2,425.01 | 7,275.03 | 2,300.00 | 6,900.00 | | 0094 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 2 | EACH | 2,243.14 | 4,486.28 | 2,200.00 | 4,400.00 | | 0095 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 2 | EACH | 2,576.58 | 5,153.16 | 2,500.00 | 5,000.00 | | 0096 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 606.25 | 1,818.75 | 575.00 | 1,725.00 | | 0097 | 732-05-00100 | Removal of Existing Markings | 2.002 | MILE | 15,216.89 | 30,464.21 | 14,700.00 | 29,429.40 | | 0098 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 2 | EACH | 225,526.11 | 451,052.22 | 285,000.00 | 570,000.00 | | 0099 | 740-01-00100 | Construction Layout | 1 | LUMP | 88,088.85 | 88,088.85 | 300,000.00 | 300,000.00 | | 0100 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 641.44 | 641.44 | 250,000.00 | 250,000.00 | | 0101 | 805-01-00900 | Class A1 Concrete (Structural) | 5 | CUYD | 769.82 | 3,849.10 | 3,000.00 | 15,000.00 | | 0102 | 806-01-00100 | Deformed Reinforcing Steel | 289 | LB | 28.94 | 8,363.66 | 6.00 | 1,734.00 | | 0103 | 822-02-00900 | Conduit w Conductors (PVC/HDPE) (4") (4 Inch) | 258 | LNFT | 78.81 | 20,332.98 | 75.00 | 19,350.00 | | 0104 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 424 | TON | 173.29 | 73,474.96 | 230.00 | 97,520.00 | | 0105 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 77,984 | INLF | 1.49 | 116,196.16 | 1.50 | 116,976.00 | | 0106 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 567 | INLF | 1.49 | 844.83 | 1.00 | 567.00 | | 0107 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 25,464 | INLF | 1.49 | 37,941.36 | 2.00 | 50,928.00 | | 0108 | NS-702-00100 | Paved Gutter Drain | 15 | EACH | 6,476.76 | 97,151.40 | 5,000.00 | 75,000.00 | | 0109 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 53 | EACH | 394.06 | 20,885.18 | 1,100.00 | 58,300.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,770,606.43 | | 10,530,070.80 |
|