Proposal:H.010673.6-R1
Parish:Jefferson
Routes:US 90-Z
Description:US90Z: HARVEY CANAL TUNNEL REHABILITATION
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TUNNEL REHABILITATION, AND RELATED WORK.
Estimated Construction Cost:$39,718,966.58
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 26435 | C.E.C., Inc. | $53,718,699.10 | 9490.00 | $58,463,699.10 |
| 2 | 58134 | Johnson Bros. Corp. A Southland Co. | $64,965,913.80 | 1388.00 | $65,659,913.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - Johnson Bros. Corp. A Southland Co. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of CONCRETE COATING SYSTEM FROM RETAINING WALLS, CURBS AND STAIRS | 2,834 | SQYD | 40.00 | 113,360.00 | 20.00 | 56,680.00 | | 0002 | 202-02-00030 | Removal of REMOVAL OF RAILING | 385 | LNFT | 104.00 | 40,040.00 | 80.00 | 30,800.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 696 | LNFT | 62.00 | 43,152.00 | 50.00 | 34,800.00 | | 0004 | 202-02-26300 | Removal of Median / Island | 170 | SQYD | 204.00 | 34,680.00 | 69.00 | 11,730.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,732 | SQYD | 46.00 | 79,672.00 | 57.00 | 98,724.00 | | 0006 | 203-01-00100 | General Excavation | 637 | CUYD | 56.00 | 35,672.00 | 135.00 | 85,995.00 | | 0007 | 203-03-00100 | Embankment | 20 | CUYD | 500.00 | 10,000.00 | 200.00 | 4,000.00 | | 0008 | 302-02-06000 | Class II Base Course (6" Thick) | 148 | SQYD | 98.00 | 14,504.00 | 55.00 | 8,140.00 | | 0009 | 302-02-12000 | Class II Base Course (12" Thick) | 1,671 | SQYD | 69.00 | 115,299.00 | 75.00 | 125,325.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 523 | TON | 420.00 | 219,660.00 | 500.00 | 261,500.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 3,588 | SQYD | 11.40 | 40,903.20 | 12.00 | 43,056.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -199 | CUYD | 1.00 | -199.00 | 0.10 | -19.90 | | 0013 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 1,452 | SQYD | 248.00 | 360,096.00 | 325.00 | 471,900.00 | | 0014 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 2 | EACH | 10,440.00 | 20,880.00 | 4,000.00 | 8,000.00 | | 0015 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 167 | LNFT | 72.00 | 12,024.00 | 200.00 | 33,400.00 | | 0016 | 705-07-02060 | 4-Foot Single Gates for Chain Link Fence (7-Foot Height) | 2 | EACH | 3,000.00 | 6,000.00 | 5,000.00 | 10,000.00 | | 0017 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 148 | SQYD | 285.00 | 42,180.00 | 150.00 | 22,200.00 | | 0018 | 707-01-00100 | Concrete Curb | 1,124 | LNFT | 49.00 | 55,076.00 | 22.00 | 24,728.00 | | 0019 | 707-03-00100 | Combination Concrete Curb and Gutter | 696 | LNFT | 100.00 | 69,600.00 | 65.00 | 45,240.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 300,000.00 | 300,000.00 | 4,500,000.00 | 4,500,000.00 | | 0021 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 30,000.00 | 120,000.00 | 35,000.00 | 140,000.00 | | 0022 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 125 | SQYD | 60.00 | 7,500.00 | 12.00 | 1,500.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 3,000,000.00 | 3,000,000.00 | 6,500,000.00 | 6,500,000.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 372 | EACH | 60.00 | 22,320.00 | 30.00 | 11,160.00 | | 0025 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 3.38 | MILE | 24,000.00 | 81,120.00 | 17,000.00 | 57,460.00 | | 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.07 | MILE | 36,000.00 | 2,520.00 | 18,500.00 | 1,295.00 | | 0027 | 736-04-01220 | Signal Pole (22 foot Steel Strain Pole) | 4 | EACH | 21,000.00 | 84,000.00 | 25,000.00 | 100,000.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | | 0029 | 805-01-00900 | Class A1 Concrete Class A1 Concrete | 11 | CUYD | 5,400.00 | 59,400.00 | 2,500.00 | 27,500.00 | | 0030 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 25,504 | SQFT | 11.00 | 280,544.00 | 10.00 | 255,040.00 | | 0031 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 25,504 | SQFT | 2.65 | 67,585.60 | 4.50 | 114,768.00 | | 0032 | 806-01-00100 | Deformed Reinforcing Steel | 1,283 | LB | 9.00 | 11,547.00 | 10.00 | 12,830.00 | | 0033 | 810-02-00100 | Metal Bridge Railing | 173 | LNFT | 605.00 | 104,665.00 | 400.00 | 69,200.00 | | 0034 | 810-04-00100 | Hand Railing Hand Railing | 288 | LNFT | 390.00 | 112,320.00 | 225.00 | 64,800.00 | | 0035 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,980 | SQFT | 528.00 | 1,045,440.00 | 175.00 | 346,500.00 | | 0036 | 815-03-00300 | Joint Seal (Poured) | 1,303 | LNFT | 41.00 | 53,423.00 | 40.00 | 52,120.00 | | 0037 | 830-07-00100 | Structural Concrete Patching | 40.7 | SQFT | 1,260.00 | 51,282.00 | 285.00 | 11,599.50 | | 0038 | 830-10-00100 | Epoxy Injection | 3,186 | LNFT | 187.00 | 595,782.00 | 200.00 | 637,200.00 | | 0039 | NS-602-00010 | Cleaning and Sealing Vertical Concrete Joints | 560 | LNFT | 396.00 | 221,760.00 | 70.00 | 39,200.00 | | 0040 | NS-700-00100 | Trench Drains | 12 | EACH | 113,000.00 | 1,356,000.00 | 25,000.00 | 300,000.00 | | 0041 | TS-202-00822 | Removal of Existing Electrical Equipment, Wiring and Conduits | 1 | LUMP | 175,000.00 | 175,000.00 | 68,000.00 | 68,000.00 | | 0042 | TS-203-08010 | Geotextile Fabric for Unbonded Overlay | 4,290 | SQYD | 26.00 | 111,540.00 | 20.00 | 85,800.00 | | 0043 | TS-602-00002 | Milling Concrete Pavement for Bonded/Unbonded Overlays (4” to 5”) | 9,642 | SQYD | 93.00 | 896,706.00 | 40.00 | 385,680.00 | | 0044 | TS-602-00003 | Unbonded Overlay Resurfacing | 4,290 | SQYD | 236.00 | 1,012,440.00 | 200.00 | 858,000.00 | | 0045 | TS-602-00004 | Bonded Overlay Resurfacing | 5,352 | SQYD | 233.00 | 1,247,016.00 | 150.00 | 802,800.00 | | 0046 | TS-805-00904 | Shallow Spall Repair | 1,465 | SQFT | 288.00 | 421,920.00 | 245.00 | 358,925.00 | | 0047 | TS-805-00905 | Deep Spall Repair | 400 | SQFT | 326.00 | 130,400.00 | 275.00 | 110,000.00 | | 0048 | TS-805-00906 | 1 MVA Utility Transformers Pad (WVB & EVB) | 1.05 | CUYD | 28,000.00 | 29,400.00 | 5,000.00 | 5,250.00 | | 0049 | TS-805-00907 | Foundation for New 1350 kW Generator and Docking Station | 15.3 | CUYD | 6,900.00 | 105,570.00 | 2,500.00 | 38,250.00 | | 0050 | TS-805-00908 | Concrete Cutout for Slab Penetration | 4 | EACH | 44,000.00 | 176,000.00 | 2,250,000.00 | 9,000,000.00 | | 0051 | TS-805-00909 | Construction Joint Repair | 776 | LNFT | 720.00 | 558,720.00 | 125.00 | 97,000.00 | | 0052 | TS-805-00910 | General Expansion Joint Repair | 4 | EACH | 336,000.00 | 1,344,000.00 | 25,000.00 | 100,000.00 | | 0053 | TS-805-00911 | Concrete Slab Reinforcement at Penetration | 4 | EACH | 107,000.00 | 428,000.00 | 150,000.00 | 600,000.00 | | 0054 | TS-811-00001 | Painting | 1 | LUMP | 243,000.00 | 243,000.00 | 375,000.00 | 375,000.00 | | 0055 | TS-821-00500 | Wet Standpipe System Demolition and Removal | 1 | LUMP | 299,000.00 | 299,000.00 | 25,000.00 | 25,000.00 | | 0056 | TS-821-00501 | Wet Standpipe System Installation | 1 | LUMP | 3,360,000.00 | 3,360,000.00 | 25,000.00 | 25,000.00 | | 0057 | TS-821-00502 | Clean Agent System Installation | 1 | LUMP | 83,000.00 | 83,000.00 | 10,000.00 | 10,000.00 | | 0058 | TS-821-00503 | Miscellaneous Fire Suppression Installation | 1 | LUMP | 466,600.00 | 466,600.00 | 246,000.00 | 246,000.00 | | 0059 | TS-821-00504 | Fire Suppression Testing, Training and Commissioning | 1 | LUMP | 39,000.00 | 39,000.00 | 50,000.00 | 50,000.00 | | 0060 | TS-821-00505 | Air Compression System Demolition and Removal | 1 | LUMP | 14,400.00 | 14,400.00 | 13,000.00 | 13,000.00 | | 0061 | TS-821-00506 | Sewage Pump System Demolition and Removal | 1 | LUMP | 13,200.00 | 13,200.00 | 12,000.00 | 12,000.00 | | 0062 | TS-821-00507 | Plumbing Installation and Inspection | 1 | LUMP | 9,600.00 | 9,600.00 | 9,000.00 | 9,000.00 | | 0063 | TS-821-00508 | Existing Tunnel Ventilation System Demolition and Removal | 1 | LUMP | 223,000.00 | 223,000.00 | 50,000.00 | 50,000.00 | | 0064 | TS-821-00509 | Tunnel Ventilation System Installation | 1 | LUMP | 4,952,400.00 | 4,952,400.00 | 3,700,000.00 | 3,700,000.00 | | 0065 | TS-821-00510 | Tunnel Ventilation System Testing, Training and Commissioning | 1 | LUMP | 96,000.00 | 96,000.00 | 82,000.00 | 82,000.00 | | 0066 | TS-821-00511 | West Ventilation Building HVAC Demolition | 1 | LUMP | 86,000.00 | 86,000.00 | 100.00 | 100.00 | | 0067 | TS-821-00512 | West Ventilation Building & Maintenance Building HVAC Installation | 1 | LUMP | 274,800.00 | 274,800.00 | 157,000.00 | 157,000.00 | | 0068 | TS-821-00513 | East Ventilation Building HVAC Demolition | 1 | LUMP | 86,000.00 | 86,000.00 | 100.00 | 100.00 | | 0069 | TS-821-00514 | East Ventilation Building HVAC Installation | 1 | LUMP | 212,400.00 | 212,400.00 | 104,000.00 | 104,000.00 | | 0070 | TS-821-00515 | West Portal Pump Station HVAC Installation | 1 | LUMP | 20,400.00 | 20,400.00 | 12,000.00 | 12,000.00 | | 0071 | TS-821-00516 | East Portal Pump Station HVAC Installation | 1 | LUMP | 20,400.00 | 20,400.00 | 12,000.00 | 12,000.00 | | 0072 | TS-821-00517 | Westbound Mid-Channel Pump Station HVAC Installation | 1 | LUMP | 13,200.00 | 13,200.00 | 12,000.00 | 12,000.00 | | 0073 | TS-821-00518 | Eastbound Mid-Channel Pump Station HVAC Installation | 1 | LUMP | 13,200.00 | 13,200.00 | 12,000.00 | 12,000.00 | | 0074 | TS-821-00519 | HVAC Testing, Training and Commissioning | 1 | LUMP | 48,720.00 | 48,720.00 | 39,000.00 | 39,000.00 | | 0075 | TS-821-00520 | Portal Pump Demolition | 1 | LUMP | 39,600.00 | 39,600.00 | 34,000.00 | 34,000.00 | | 0076 | TS-821-00521 | Mid-Channel Pump Demolition | 1 | LUMP | 10,800.00 | 10,800.00 | 10,000.00 | 10,000.00 | | 0077 | TS-821-00522 | Portal Pumps Installation | 1 | LUMP | 480,000.00 | 480,000.00 | 407,000.00 | 407,000.00 | | 0078 | TS-821-00523 | Mid-Channel Pumps Installation | 1 | LUMP | 275,000.00 | 275,000.00 | 214,000.00 | 214,000.00 | | 0079 | TS-821-00524 | Portal Pump Room Pipe and Valve Demolition | 1 | LUMP | 33,600.00 | 33,600.00 | 29,000.00 | 29,000.00 | | 0080 | TS-821-00525 | Mid-Channel Pump Room Pipe and Valve Demolition | 1 | LUMP | 27,600.00 | 27,600.00 | 24,000.00 | 24,000.00 | | 0081 | TS-821-00526 | Air Duct Drainage Discharge Pipe Demolition | 1 | LUMP | 58,800.00 | 58,800.00 | 50,000.00 | 50,000.00 | | 0082 | TS-821-00527 | Portal Pump Room Discharge Pipe and Valves Installation | 1 | LUMP | 244,800.00 | 244,800.00 | 208,000.00 | 208,000.00 | | 0083 | TS-821-00528 | Mid-Channel Pump Room Discharge Pipe and Valves Installation | 1 | LUMP | 75,600.00 | 75,600.00 | 64,000.00 | 64,000.00 | | 0084 | TS-821-00529 | Air Duct Drainage Discharge Pipe Installation | 1 | LUMP | 181,200.00 | 181,200.00 | 154,000.00 | 154,000.00 | | 0085 | TS-821-00530 | Pump and Pipe Testing | 1 | LUMP | 20,400.00 | 20,400.00 | 17,500.00 | 17,500.00 | | 0086 | TS-821-00531 | Lift Trolley and Hoist | 1 | LUMP | 23,520.00 | 23,520.00 | 50,000.00 | 50,000.00 | | 0087 | TS-821-00532 | Natural Gas Piping and Valving | 1 | LUMP | 38,400.00 | 38,400.00 | 32,500.00 | 32,500.00 | | 0088 | TS-822-00909 | Stainless Steel Channel for Mounting Electrical Equipment | 1,800 | LF | 162.00 | 291,600.00 | 105.00 | 189,000.00 | | 0089 | TS-822-00920 | Testing, Calibration, and Commissioning | 1 | LUMP | 140,407.00 | 140,407.00 | 81,000.00 | 81,000.00 | | 0090 | TS-822-00924 | Panelboard - 3 Phase - 277/480V 125A Frame - 42 Circuits | 2 | EACH | 9,990.00 | 19,980.00 | 12,000.00 | 24,000.00 | | 0091 | TS-822-00934 | Fiber Optic 12 Fibers | 2,600 | LF | 17.00 | 44,200.00 | 3.00 | 7,800.00 | | 0092 | TS-822-00935 | Fiber Optic 48 Fibers | 3,900 | LF | 29.50 | 115,050.00 | 4.00 | 15,600.00 | | 0093 | TS-822-00951 | Conductor LSZH / MC (2HR) – 4/C 500 KCMIL | 6,800 | LNFT | 697.00 | 4,739,600.00 | 344.00 | 2,339,200.00 | | 0094 | TS-822-00953 | Conductor LSZH / MC (2HR) - 3/C#10AWG | 4,390 | LNFT | 62.00 | 272,180.00 | 47.00 | 206,330.00 | | 0095 | TS-822-00954 | Conductor LSZH / MC (2HR) - 3/C#4AWG | 20 | LNFT | 545.00 | 10,900.00 | 2,800.00 | 56,000.00 | | 0096 | TS-822-00955 | Conductor LSZH / MC (2HR) - 3/C#3/0AWG | 200 | LNFT | 2,522.00 | 504,400.00 | 770.00 | 154,000.00 | | 0097 | TS-822-00956 | Conductor LSZH / MC (2HR) - 2/C#12AWG | 4,170 | LNFT | 115.00 | 479,550.00 | 43.00 | 179,310.00 | | 0098 | TS-822-00957 | Conductor LSZH / MC (2HR) - 2/C#8AWG | 35 | LNFT | 372.50 | 13,037.50 | 1,250.00 | 43,750.00 | | 0099 | TS-822-00958 | Conductor LSZH / MC (2HR) - 2/C#4AWG | 550 | LNFT | 96.00 | 52,800.00 | 140.00 | 77,000.00 | | 0100 | TS-822-00959 | Conductor LSZH / MC (2HR) - 2/C#3AWG | 1,100 | LNFT | 117.00 | 128,700.00 | 82.00 | 90,200.00 | | 0101 | TS-822-00960 | Conductor LSZH / XHHW-2 - #12AWG | 11,381 | LNFT | 2.50 | 28,452.50 | 2.00 | 22,762.00 | | 0102 | TS-822-00961 | Conductor LSZH / XHHW-2 - #10AWG | 5,325 | LNFT | 15.00 | 79,875.00 | 2.00 | 10,650.00 | | 0103 | TS-822-00962 | Conductor LSZH / XHHW-2 - #8AWG | 14,085 | LNFT | 4.00 | 56,340.00 | 3.00 | 42,255.00 | | 0104 | TS-822-00963 | Conductor LSZH / XHHW-2 - #6AWG | 120 | LNFT | 13.00 | 1,560.00 | 3.50 | 420.00 | | 0105 | TS-822-00964 | Conductor LSZH / XHHW-2 - #4AWG | 700 | LNFT | 6.00 | 4,200.00 | 5.00 | 3,500.00 | | 0106 | TS-822-00965 | Conductor LSZH / XHHW-2 - #3AWG | 12 | LNFT | 841.00 | 10,092.00 | 6.00 | 72.00 | | 0107 | TS-822-00966 | Conductor LSZH / XHHW-2 - #2AWG | 300 | LNFT | 30.00 | 9,000.00 | 7.00 | 2,100.00 | | 0108 | TS-822-00967 | Conductor LSZH / XHHW-2 - #1/0AWG | 2.4 | LNFT | 1,372.00 | 3,292.80 | 13.00 | 31.20 | | 0109 | TS-822-00968 | Conductor LSZH / XHHW-2 - #250 KCMIL | 252 | LNFT | 79.00 | 19,908.00 | 22.00 | 5,544.00 | | 0110 | TS-822-00969 | Heat Trace Cable - 16 AWG nickel-plated copper | 2,590 | LNFT | 46.00 | 119,140.00 | 50.00 | 129,500.00 | | 0111 | TS-822-00970 | MC Cable Entry and Wire Terminations #10 - #1 | 102 | EACH | 4,800.00 | 489,600.00 | 520.00 | 53,040.00 | | 0112 | TS-822-00971 | MC Cable Entry and Wire Terminations #1/0 - #4/0 | 156 | EACH | 3,027.00 | 472,212.00 | 1,150.00 | 179,400.00 | | 0113 | TS-822-00972 | Copper Clad Ground Rod - 3/4" 10'-0" | 29 | EACH | 1,816.00 | 52,664.00 | 936.00 | 27,144.00 | | 0114 | TS-822-00973 | #4/0 AWG Bare Copper Conductor | 2,725 | LNFT | 95.00 | 258,875.00 | 14.00 | 38,150.00 | | 0115 | TS-822-00974 | Copper Ground Bus Bar, 1/4" x 2" x 24" | 12 | EACH | 2,303.00 | 27,636.00 | 1,200.00 | 14,400.00 | | 0116 | TS-822-00975 | Conduit Rigid Galv. Steel (RGS) - 3/4" | 4,780 | LNFT | 73.00 | 348,940.00 | 17.00 | 81,260.00 | | 0117 | TS-822-00976 | Conduit Rigid Galv. Steel (RGS) - 1" | 5,190 | LNFT | 26.00 | 134,940.00 | 21.00 | 108,990.00 | | 0118 | TS-822-00977 | Conduit Rigid Galv. Steel (RGS) – 1-1/4" | 1,450 | LNFT | 26.00 | 37,700.00 | 23.00 | 33,350.00 | | 0119 | TS-822-00978 | Conduit Rigid Galv. Steel (RGS) - 2" | 200 | LNFT | 305.00 | 61,000.00 | 36.00 | 7,200.00 | | 0120 | TS-822-00979 | Conduit Rigid Galv. Steel (RGS) - 2-1/2" | 60 | LNFT | 125.00 | 7,500.00 | 55.00 | 3,300.00 | | 0121 | TS-822-00981 | NEMA 4X - Stainless Steel Junction Box - 18"x18"x8" | 6 | EACH | 3,615.00 | 21,690.00 | 3,500.00 | 21,000.00 | | 0122 | TS-822-00983 | NEMA 4X - Stainless Steel Junction Box - 8"x8"x6" | 12 | EACH | 1,996.00 | 23,952.00 | 2,100.00 | 25,200.00 | | 0123 | TS-822-00984 | Cable Tray, Ladder Type - 24" Wide, 6" Deep, 12-Inch Spacing | 20 | LNFT | 444.00 | 8,880.00 | 100.00 | 2,000.00 | | 0124 | TS-822-00985 | Cable Tray, Ladder Type - 36" Wide, 6" Deep, 12-Inch Spacing | 35 | LNFT | 530.00 | 18,550.00 | 100.00 | 3,500.00 | | 0125 | TS-822-00987 | Conduit High-density polyethylene (HDPE) - 2" | 3,660 | LNFT | 3.00 | 10,980.00 | 150.00 | 549,000.00 | | 0126 | TS-822-00991 | Manhole - 8' x 5' x 5', precast w/iron racks & pulling irons, C.I. frame and cover | 1 | EACH | 33,177.50 | 33,177.50 | 25,000.00 | 25,000.00 | | 0127 | TS-822-00992 | Trenching for Conduit | 411 | CUYD | 543.00 | 223,173.00 | 75.00 | 30,825.00 | | 0128 | TS-822-00993 | Horizontal Directional Drilling for Conduit | 3,660 | LNFT | 30.00 | 109,800.00 | 85.00 | 311,100.00 | | 0129 | TS-822-00994 | Studies: Load Flow, Short Circuit, Arch Flash Analyses | 1 | LUMP | 32,336.00 | 32,336.00 | 35,000.00 | 35,000.00 | | 0130 | TS-822-00995 | Transformer Dry Type - 1 Phase - 480-120/240V 1.5KVA - NEMA 3R | 4 | EACH | 5,775.00 | 23,100.00 | 7,500.00 | 30,000.00 | | 0131 | TS-822-00996 | Transformer Dry Type - 1 Phase - 480-120/240V 15KVA - NEMA 1 | 2 | EACH | 11,328.00 | 22,656.00 | 7,000.00 | 14,000.00 | | 0132 | TS-822-00997 | Transformer Dry Type - 1 Phase - 480-120/240V 25KVA - NEMA 1 | 1 | EACH | 22,665.00 | 22,665.00 | 9,000.00 | 9,000.00 | | 0133 | TS-822-00998 | Transformer Dry Type - 1 Phase - 480-120/240V 37.5KVA - NEMA 3R | 3 | EACH | 9,397.00 | 28,191.00 | 10,000.00 | 30,000.00 | | 0134 | TS-822-01000 | Outdoor Enclosed Breakers, 480Y/277V, 1600 Amp, NEMA 4X | 2 | EACH | 79,772.00 | 159,544.00 | 400,000.00 | 800,000.00 | | 0135 | TS-822-01001 | Panelboard - 3 Phase - 277/480V 250A Frame - 42 Circuits | 4 | EACH | 7,198.00 | 28,792.00 | 15,000.00 | 60,000.00 | | 0136 | TS-822-01002 | Panelboard - 3 Phase - 120/208V 100A Frame - 42 Circuits | 1 | EACH | 17,361.00 | 17,361.00 | 8,100.00 | 8,100.00 | | 0137 | TS-822-01003 | Panelboard - 1 Phase - 120/240V 225A Frame - 42 Circuits | 5 | EACH | 4,395.00 | 21,975.00 | 14,000.00 | 70,000.00 | | 0138 | TS-822-01004 | Panelboard - 1 Phase - 120/240V 100A Frame - 42 Circuits | 1 | EACH | 18,670.00 | 18,670.00 | 13,700.00 | 13,700.00 | | 0139 | TS-822-01005 | MCCs, 480Y/277V, 1600 Amp, M-T-M, with Starters per one-line | 1 | LUMP | 975,709.00 | 975,709.00 | 3,920,000.00 | 3,920,000.00 | | 0140 | TS-822-01006 | Heat Trace Controller | 6 | EACH | 658.00 | 3,948.00 | 25,000.00 | 150,000.00 | | 0141 | TS-822-01007 | Light Switch | 11 | EACH | 976.00 | 10,736.00 | 210.00 | 2,310.00 | | 0142 | TS-822-01008 | Receptacles | 27 | EACH | 1,151.00 | 31,077.00 | 210.00 | 5,670.00 | | 0143 | TS-822-01009 | Disconnect - 240V 30A - 2 pole | 23 | EACH | 1,281.00 | 29,463.00 | 1,400.00 | 32,200.00 | | 0144 | TS-822-01011 | Stainless Steel Air Terminal- 3/4" 6'-0" | 16 | EACH | 7,568.00 | 121,088.00 | 1,900.00 | 30,400.00 | | 0145 | TS-822-01012 | #4/0 Equivalent rectangular Tinned Copper Tape. | 540 | LNFT | 112.00 | 60,480.00 | 85.00 | 45,900.00 | | 0146 | TS-822-01013 | Surge Counter | 8 | EACH | 4,694.00 | 37,552.00 | 2,500.00 | 20,000.00 | | 0147 | TS-822-01014 | Luminaires Holophane EMX – 66.6W | 40 | EACH | 1,730.00 | 69,200.00 | 1,200.00 | 48,000.00 | | 0148 | TS-822-01015 | Luminaires Holophane EMXH – 66.6W | 6 | EACH | 3,502.00 | 21,012.00 | 2,000.00 | 12,000.00 | | 0149 | TS-822-01016 | Luminaires Holophane EMX – 33.2W | 23 | EACH | 1,400.00 | 32,200.00 | 830.00 | 19,090.00 | | 0150 | TS-822-01017 | Luminaires Holophane EMXH – 33.2W | 6 | EACH | 4,744.00 | 28,464.00 | 3,750.00 | 22,500.00 | | 0151 | TS-822-01018 | Exit Sign Holophane MEX – 1.4W | 18 | EACH | 743.00 | 13,374.00 | 420.00 | 7,560.00 | | 0152 | TS-822-01019 | Communication Cabinets, Racks, and Enclosures | 1 | LUMP | 555,450.00 | 555,450.00 | 350,000.00 | 350,000.00 | | 0153 | TS-822-01020 | Cellular Rebroadcast System | 1 | LUMP | 237,061.00 | 237,061.00 | 300,000.00 | 300,000.00 | | 0154 | TS-822-01021 | Video Surveillance Remote Devices and Sensors | 1 | LUMP | 240,261.00 | 240,261.00 | 1,000,000.00 | 1,000,000.00 | | 0155 | TS-822-01022 | Upgrade Utility Supply to meet predicted load of 1MVA per XFMR | 1 | EACH | 35,557.00 | 35,557.00 | 120,000.00 | 120,000.00 | | 0156 | TS-822-01023 | Traffic Systems | 1 | LUMP | 977,015.00 | 977,015.00 | 500,000.00 | 500,000.00 | | 0157 | TS-822-01024 | Control System Hardware | 1 | LUMP | 254,085.00 | 254,085.00 | 1,500,000.00 | 1,500,000.00 | | 0158 | TS-822-01025 | Conductor LSZH / Tray Cable – 4/C 500 KCMIL | 450 | LNFT | 786.00 | 353,700.00 | 400.00 | 180,000.00 | | 0159 | TS-822-01026 | Conductor LSZH / MC (2HR) - 4/C#4AWG | 10 | LNFT | 755.00 | 7,550.00 | 8,000.00 | 80,000.00 | | 0160 | TS-822-01027 | MC Cable Entry and Wire Terminations #250 - #500 KCMIL | 186 | EACH | 3,500.00 | 651,000.00 | 1,500.00 | 279,000.00 | | 0161 | TS-822-01028 | Conduit Poly Vinyl Chloride (PVC) – 3/4" | 200 | LNFT | 253.00 | 50,600.00 | 11.00 | 2,200.00 | | 0162 | TS-822-01029 | Conduit Poly Vinyl Chloride (PVC) – 2" | 10,500 | LNFT | 19.00 | 199,500.00 | 15.00 | 157,500.00 | | 0163 | TS-822-01030 | Conduit Poly Vinyl Chloride (PVC) – 4" | 150 | LNFT | 1,120.00 | 168,000.00 | 42.00 | 6,300.00 | | 0164 | TS-822-01031 | Conduit Poly Vinyl Chloride (PVC) – 5" | 800 | LNFT | 166.00 | 132,800.00 | 32.00 | 25,600.00 | | 0165 | TS-822-01032 | Conduit Fiberglass Reinforced Epoxy (FRE) – 2” | 200 | LNFT | 81.00 | 16,200.00 | 13.00 | 2,600.00 | | 0166 | TS-822-01033 | 40"W X 24"D Pre-Cast Concrete Trench with Channel Steel Cable Mounts | 175 | LNFT | 1,454.00 | 254,450.00 | 500.00 | 87,500.00 | | 0167 | TS-822-01034 | Transformer Dry Type - 3 Phase - 480-120/208V 30KVA - NEMA 1 | 1 | EACH | 20,295.00 | 20,295.00 | 10,500.00 | 10,500.00 | | 0168 | TS-822-01035 | Generator Switchgear, 480Y/277V, 2000 Amp | 1 | LUMP | 191,843.00 | 191,843.00 | 425,000.00 | 425,000.00 | | 0169 | TS-822-01036 | Signage Lighting - LuxNeon w/ Driver & Photocell | 2 | EACH | 106,341.00 | 212,682.00 | 25,500.00 | 51,000.00 | | 0170 | TS-822-01037 | Category 6 (CAT 6) Ethernet Cable | 6,100 | LNFT | 9.00 | 54,900.00 | 4.50 | 27,450.00 | | 0171 | TS-822-01038 | Fire Alarm Cable | 8,500 | LNFT | 6.00 | 51,000.00 | 2.50 | 21,250.00 | | 0172 | TS-822-01039 | Discrete Signal Wire | 15,000 | LNFT | 9.00 | 135,000.00 | 3.75 | 56,250.00 | | 0173 | TS-822-01040 | Analog Control Cable | 10,000 | LNFT | 9.00 | 90,000.00 | 3.50 | 35,000.00 | | 0174 | TS-822-01041 | Conduit Poly Vinyl Chloride (PVC) – 1-1/4" | 200 | LNFT | 80.00 | 16,000.00 | 12.50 | 2,500.00 | | 0175 | TS-822-01042 | Conduit Poly Vinyl Chloride (PVC) – 3" | 100 | LNFT | 52.00 | 5,200.00 | 27.50 | 2,750.00 | | 0176 | TS-822-01043 | SCADA System | 1 | LUMP | 778,846.00 | 778,846.00 | 1,650,000.00 | 1,650,000.00 | | 0177 | TS-822-01044 | Generator Docking Station, 480Y/277V, 3P, 4W, 2000A, 316SS NEMA 4X | 1 | EACH | 126,215.00 | 126,215.00 | 125,000.00 | 125,000.00 | | 0178 | TS-822-01045 | Relocate Existing UPS Equipment | 1 | LUMP | 25,517.00 | 25,517.00 | 200,000.00 | 200,000.00 | | 0179 | TS-822-01047 | Transformer Dry Type - 1 Phase - 480-120/240V 50KVA -NEMA 1 | 1 | EACH | 5,374.00 | 5,374.00 | 12,500.00 | 12,500.00 | | 0180 | TS-822-01048 | Disconnect - 480V 200A - 3 pole | 2 | EACH | 1,456.00 | 2,912.00 | 4,000.00 | 8,000.00 | | 0181 | TS-822-01049 | NEMA 4X - Stainless Steel Junction Box - 12"x12"x8" | 2 | EACH | 2,814.00 | 5,628.00 | 2,600.00 | 5,200.00 | | 0182 | TS-822-01050 | NEMA 4X - Stainless Steel Junction Box - 12"x24"x48" | 2 | EACH | 7,145.00 | 14,290.00 | 9,500.00 | 19,000.00 | | 0183 | TS-822-01051 | Powerline Filter, 200A Min Rating | 2 | EACH | 21,134.00 | 42,268.00 | 5,000.00 | 10,000.00 | | 0184 | TS-822-01052 | Conductor LSZH / MC (2HR) - 2/C#2AWG | 500 | LNFT | 186.00 | 93,000.00 | 170.00 | 85,000.00 | | 0185 | TS-822-01053 | Conductor LSZH / XHHW-2 - 3/0AWG | 770 | LNFT | 72.00 | 55,440.00 | 18.00 | 13,860.00 | | 0186 | TS-822-01054 | Conductor LSZH / XHHW-2 - 2/0AWG | 160 | LNFT | 120.00 | 19,200.00 | 15.00 | 2,400.00 | | 0187 | TS-822-01055 | Conductor LSZH / XHHW-2 - #1AWG | 20 | LNFT | 112.00 | 2,240.00 | 9.50 | 190.00 | | 0188 | TS-822-01056 | Handhole – AASHTO HS20 Rated – 24”x18”x12” | 19 | EACH | 1,705.00 | 32,395.00 | 2,100.00 | 39,900.00 | | 0189 | TS-822-01057 | #2/0 AWG Bare Copper Conductor | 800 | LNFT | 36.00 | 28,800.00 | 9.50 | 7,600.00 | | 0190 | TS-830-00901 | Crack Leak Repair Monitoring | 1 | LUMP | 450,000.00 | 450,000.00 | 70,000.00 | 70,000.00 | | 0191 | TS-830-00902 | Crack Injection - Leak Repair | 2,155 | LF | 444.00 | 956,820.00 | 155.00 | 334,025.00 | | 0192 | TS-MSC-00901 | Tile Removal | 116,100 | SQFT | 11.73 | 1,361,853.00 | 10.00 | 1,161,000.00 | | 0193 | TS-MSC-00902 | Tile Installation | 116,100 | SQFT | 33.40 | 3,877,740.00 | 65.00 | 7,546,500.00 | | 0194 | TS-MSC-00903 | Fire Alarm System | 1 | LUMP | 181,250.00 | 181,250.00 | 300,000.00 | 300,000.00 | | 0195 | TS-MSC-00904 | Concrete Core Drilling With Firestopping | 50 | EACH | 1,200.00 | 60,000.00 | 185.00 | 9,250.00 | | 0196 | TS-MSC-00905 | Furnish and Install Stair Treads/Nosing | 635 | LNFT | 185.00 | 117,475.00 | 500.00 | 317,500.00 | | 0197 | TS-MSC-00906 | 1350kW Natural Gas Generator Model C1350 N6 w/Sound Attenuated Enclosure | 1 | EACH | 1,430,000.00 | 1,430,000.00 | 3,500,000.00 | 3,500,000.00 | | 0198 | TS-MSC-00907 | Natural Gas Supply connection for Backup Generator | 1 | LUMP | 6,000.00 | 6,000.00 | 50,000.00 | 50,000.00 | | 0199 | TS-P26-00082 | Traffic Signal Foundation (30 inch Diameter) | 4 | EACH | 20,000.00 | 80,000.00 | 20,000.00 | 80,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 53,718,699.10 | | 64,965,913.80 |
|