Proposal:H.013997.6
Parish:St. James
Description:LOC RD OVER BORROW PIT (BLIND RV BT LNCH)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$2,263,150.00
| Rank | License | Bidder | Construction Bid |
| 1 | 36827 | Shavers-Whittle Construction LLC | $2,571,601.00 |
| 2 | 00044 | Guinn Construction, LLC | $2,855,294.25 |
| 3 | 00009 | Coastal Contractors, LLC | $3,248,226.25 |
| 4 | 28190 | Buck Town Contractors & Co. | $3,275,265.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Shavers-Whittle Construction LLC | - 2 - Guinn Construction, LLC | - 3 - Coastal Contractors, LLC | - 4 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.16 | LUMP | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 7,500.00 | 7,500.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 217.8 | SQYD | 25.00 | 5,445.00 | 75.00 | 16,335.00 | 40.00 | 8,712.00 | 20.00 | 4,356.00 | | 0003 | 202-02-04501 | Removal of Bridge STR. NO. 614730060904411 (57' X 26' PRECAST CONCRETE DECK, TIMBER BENTS, TIMBER PILES, HEADWALLS, APPROACH SLABS) | 1,482 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 85,000.00 | 85,000.00 | | 0004 | 202-03-38000 | Relocation of Sign | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 550.00 | 550.00 | 500.00 | 500.00 | | 0005 | 203-02-00100 | Drainage Excavation | 674 | CUYD | 65.00 | 43,810.00 | 40.00 | 26,960.00 | 110.00 | 74,140.00 | 32.00 | 21,568.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 334 | LNFT | 10.00 | 3,340.00 | 5.00 | 1,670.00 | 10.00 | 3,340.00 | 2.00 | 668.00 | | 0008 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 664 | SQYD | 110.00 | 73,040.00 | 138.00 | 91,632.00 | 375.00 | 249,000.00 | 170.00 | 112,880.00 | | 0009 | 304-01-00100 | Lime | 0.5 | TON | 1,000.00 | 500.00 | 5,000.00 | 2,500.00 | 1,800.00 | 900.00 | 600.00 | 300.00 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 27 | SQYD | 125.00 | 3,375.00 | 500.00 | 13,500.00 | 250.00 | 6,750.00 | 115.00 | 3,105.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 225.00 | 900.00 | 500.00 | 2,000.00 | 250.00 | 1,000.00 | 150.00 | 600.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 141.7 | TON | 250.00 | 35,425.00 | 350.00 | 49,595.00 | 650.00 | 92,105.00 | 612.00 | 86,720.40 | | 0013 | 711-03-00400 | Riprap (55 lb) | 1,315 | TON | 120.00 | 157,800.00 | 120.00 | 157,800.00 | 135.00 | 177,525.00 | 125.00 | 164,375.00 | | 0014 | 711-04-00100 | Geotextile Fabric | 1,315 | SQYD | 5.00 | 6,575.00 | 5.00 | 6,575.00 | 7.00 | 9,205.00 | 2.50 | 3,287.50 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 67,700.00 | 67,700.00 | | 0016 | 725-01-00100 | Temporary Detour Roads | 158.6 | SQYD | 175.00 | 27,755.00 | 315.00 | 49,959.00 | 400.00 | 63,440.00 | 360.00 | 57,096.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 245,000.00 | 245,000.00 | 270,000.00 | 270,000.00 | 300,000.00 | 300,000.00 | 272,000.00 | 272,000.00 | | 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 100.00 | 1,000.00 | 200.00 | 2,000.00 | 100.00 | 1,000.00 | 165.00 | 1,650.00 | | 0019 | 739-01-00100 | Hydro-Seeding | 0.16 | ACRE | 22,000.00 | 3,520.00 | 10,000.00 | 1,600.00 | 22,000.00 | 3,520.00 | 12,500.00 | 2,000.00 | | 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 20,200.00 | 20,200.00 | | 0021 | 804-01-00300 | Precast Concrete Piles (16") | 1,800 | LNFT | 140.00 | 252,000.00 | 155.00 | 279,000.00 | 155.00 | 279,000.00 | 179.68 | 323,424.00 | | 0022 | 805-01-00100 | Class A1 Concrete (Slab Span) | 88.32 | CUYD | 2,150.00 | 189,888.00 | 3,750.00 | 331,200.00 | 3,500.00 | 309,120.00 | 2,560.00 | 226,099.20 | | 0023 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 23.85 | CUYD | 3,950.00 | 94,207.50 | 4,500.00 | 107,325.00 | 5,250.00 | 125,212.50 | 4,430.00 | 105,655.50 | | 0024 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,075 | SQFT | 4.00 | 4,300.00 | 3.00 | 3,225.00 | 2.00 | 2,150.00 | 1.00 | 1,075.00 | | 0025 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,075 | SQFT | 4.00 | 4,300.00 | 3.00 | 3,225.00 | 3.00 | 3,225.00 | 1.00 | 1,075.00 | | 0026 | 806-01-00100 | Deformed Reinforcing Steel | 23,823 | LB | 3.50 | 83,380.50 | 2.75 | 65,513.25 | 2.25 | 53,601.75 | 1.50 | 35,734.50 | | 0027 | 810-01-00100 | Concrete Bridge Railing (Standard) | 40 | LNFT | 350.00 | 14,000.00 | 300.00 | 12,000.00 | 350.00 | 14,000.00 | 526.00 | 21,040.00 | | 0028 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 160 | LNFT | 225.00 | 36,000.00 | 300.00 | 48,000.00 | 325.00 | 52,000.00 | 526.00 | 84,160.00 | | 0029 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 530 | SQFT | 95.00 | 50,350.00 | 110.00 | 58,300.00 | 145.00 | 76,850.00 | 120.00 | 63,600.00 | | 0030 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 80.00 | 9,600.00 | 35.00 | 4,200.00 | 85.00 | 10,200.00 | 23.00 | 2,760.00 | | 0031 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 3,200 | SQFT | 300.00 | 960,000.00 | 325.00 | 1,040,000.00 | 335.00 | 1,072,000.00 | 463.50 | 1,483,200.00 | | 0032 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 2 | EACH | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 | 2,000.00 | 4,000.00 | 1,700.00 | 3,400.00 | | 0033 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,536 | INLF | 2.50 | 3,840.00 | 5.00 | 7,680.00 | 5.00 | 7,680.00 | 1.00 | 1,536.00 | | 0034 | NS-818-00001 | Navigation Clearance Gauge (Mounted) | 1 | EACH | 750.00 | 750.00 | 25,000.00 | 25,000.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,571,601.00 | | 2,855,294.25 | | 3,248,226.25 | | 3,275,265.10 |
|