Proposal:H.006459.6
Parish:Ascension
Description:ROUNDABOUT AT CHURCHPOINT RD AND RODDY RD
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, SUBGRADE TREATMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,197,427.90
| Rank | License | Bidder | Construction Bid |
| 1 | 14807 | Richard Price Contracting Co, LLC | $1,936,083.96 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $1,969,003.00 |
| 3 | 34263 | La Contracting Enterprise LLC | $2,144,625.40 |
| 4 | 24901 | Hard Rock Construction LLC | $2,145,338.60 |
| 5 | 68237 | GULF STATES SERVICES, LLC | $2,189,589.80 |
| 6 | 46747 | Triumph Construction, LLC | $2,640,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Richard Price Contracting Co, LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - La Contracting Enterprise LLC | - 4 - Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.51 | LUMP | 5,220.56 | 5,220.56 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 5,300.00 | 5,300.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,847.65 | 11,847.65 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 6,500.00 | 6,500.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,420 | SQYD | 9.52 | 13,518.40 | 30.00 | 42,600.00 | 32.00 | 45,440.00 | 27.00 | 38,340.00 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 1,420 | SQYD | 11.90 | 16,898.00 | 17.00 | 24,140.00 | 19.00 | 26,980.00 | 18.00 | 25,560.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 361 | SQYD | 9.52 | 3,436.72 | 25.00 | 9,025.00 | 38.00 | 13,718.00 | 29.00 | 10,469.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 180,000.00 | 180,000.00 | 62,000.00 | 62,000.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches To Be As Directed by the Project Engineer | 150 | LNFT | 19.02 | 2,853.00 | 11.00 | 1,650.00 | 28.00 | 4,200.00 | 18.00 | 2,700.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 14 | EACH | 49.95 | 699.30 | 20.00 | 280.00 | 66.00 | 924.00 | 39.00 | 546.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 249.77 | 2,997.24 | 200.00 | 2,400.00 | 190.00 | 2,280.00 | 560.00 | 6,720.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,994 | LNFT | 3.00 | 5,982.00 | 4.00 | 7,976.00 | 3.00 | 5,982.00 | 3.75 | 7,477.50 | | 0011 | 302-02-04000 | Class II Base Course (4" Thick) Stone of Recycled Portland Cement Concrete | 3,609 | SQYD | 20.46 | 73,840.14 | 18.00 | 64,962.00 | 28.00 | 101,052.00 | 25.00 | 90,225.00 | | 0012 | 302-02-09010 | Class II Base Course (9" Thick) (Soil Cement) | 3,496 | SQYD | 31.12 | 108,795.52 | 30.00 | 104,880.00 | 32.00 | 111,872.00 | 46.00 | 160,816.00 | | 0013 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) As Directed by Project Engineer | 3,496 | SQYD | 28.52 | 99,705.92 | 50.00 | 174,800.00 | 53.00 | 185,288.00 | 18.00 | 62,928.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 277.89 | 1,111.56 | 160.00 | 640.00 | 278.00 | 1,112.00 | 365.00 | 1,460.00 | | 0015 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 146.35 | 8,781.00 | 160.00 | 9,600.00 | 180.00 | 10,800.00 | 150.00 | 9,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 142 | TON | 448.33 | 63,662.86 | 450.00 | 63,900.00 | 458.00 | 65,036.00 | 410.00 | 58,220.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 1,294 | SQYD | 33.93 | 43,905.42 | 35.00 | 45,290.00 | 35.00 | 45,290.00 | 32.00 | 41,408.00 | | 0018 | 510-02-00100 | Pavement Widening (12" Thick) | 545 | SQYD | 153.76 | 83,799.20 | 150.00 | 81,750.00 | 150.00 | 81,750.00 | 135.00 | 73,575.00 | | 0019 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 2,694 | SQYD | 124.74 | 336,049.56 | 120.00 | 323,280.00 | 114.00 | 307,116.00 | 127.00 | 342,138.00 | | 0020 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) (11" Thick)(Brick Red Color - Broom Finish) | 788 | SQYD | 212.68 | 167,591.84 | 170.00 | 133,960.00 | 179.00 | 141,052.00 | 170.00 | 133,960.00 | | 0021 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 208 | LNFT | 213.06 | 44,316.48 | 240.00 | 49,920.00 | 243.00 | 50,544.00 | 378.00 | 78,624.00 | | 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 36 | LNFT | 104.45 | 3,760.20 | 130.00 | 4,680.00 | 168.00 | 6,048.00 | 314.00 | 11,304.00 | | 0023 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 160 | LNFT | 167.07 | 26,731.20 | 195.00 | 31,200.00 | 181.00 | 28,960.00 | 378.00 | 60,480.00 | | 0024 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 132 | LNFT | 104.28 | 13,764.96 | 125.00 | 16,500.00 | 121.00 | 15,972.00 | 219.00 | 28,908.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 7,499.27 | 14,998.54 | 6,300.00 | 12,600.00 | 7,400.00 | 14,800.00 | 9,122.00 | 18,244.00 | | 0026 | 702-08-00100 | Side Drain Safety End (Type 1) | 9 | EACH | 2,749.54 | 24,745.86 | 4,100.00 | 36,900.00 | 4,100.00 | 36,900.00 | 3,970.00 | 35,730.00 | | 0027 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 6,411.04 | 19,233.12 | 7,300.00 | 21,900.00 | 9,300.00 | 27,900.00 | 10,235.00 | 30,705.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 323 | SQYD | 110.64 | 35,736.72 | 80.00 | 25,840.00 | 83.00 | 26,809.00 | 125.00 | 40,375.00 | | 0029 | 707-01-00100 | Concrete Curb | 959 | LNFT | 58.34 | 55,948.06 | 18.00 | 17,262.00 | 41.00 | 39,319.00 | 24.00 | 23,016.00 | | 0030 | 707-03-00100 | Combination Concrete Curb and Gutter 3" Mountable | 1,040 | LNFT | 90.81 | 94,442.40 | 40.00 | 41,600.00 | 52.00 | 54,080.00 | 58.00 | 60,320.00 | | 0031 | 710-01-00100 | Flowable Fill | 73 | CUYD | 188.38 | 13,751.74 | 275.00 | 20,075.00 | 300.00 | 21,900.00 | 182.00 | 13,286.00 | | 0032 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 23 | SQYD | 114.69 | 2,637.87 | 260.00 | 5,980.00 | 148.00 | 3,404.00 | 221.00 | 5,083.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 23 | SQYD | 14.96 | 344.08 | 20.00 | 460.00 | 6.00 | 138.00 | 3.00 | 69.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 93,023.62 | 93,023.62 | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 | 63,000.00 | 63,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 2,850 | LNFT | 0.48 | 1,368.00 | 0.50 | 1,425.00 | 0.76 | 2,166.00 | 0.45 | 1,282.50 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 40 | LNFT | 1.21 | 48.40 | 1.25 | 50.00 | 1.25 | 50.00 | 1.00 | 40.00 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 347 | SQYD | 12.12 | 4,205.64 | 14.00 | 4,858.00 | 11.25 | 3,903.75 | 30.25 | 10,496.75 | | 0038 | 715-01-00100 | Topsoil 9" Depth | 86.5 | CUYD | 45.11 | 3,902.02 | 85.00 | 7,352.50 | 100.00 | 8,650.00 | 90.00 | 7,785.00 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 3,786.59 | 3,029.27 | 3,000.00 | 2,400.00 | 3,356.00 | 2,684.80 | 2,900.00 | 2,320.00 | | 0040 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) Natchez Crape Myrtle | 3 | EACH | 545.27 | 1,635.81 | 1,400.00 | 4,200.00 | 1,060.00 | 3,180.00 | 1,412.00 | 4,236.00 | | 0041 | 719-01-06040 | Plants (Plant) (Container) (2 gallon) Flax Lily | 33 | EACH | 30.29 | 999.57 | 6.00 | 198.00 | 33.00 | 1,089.00 | 5.50 | 181.50 | | 0042 | 719-01-06080 | Plants (Plant) (Container) (5 gallon) Carissa Holly | 31 | EACH | 38.77 | 1,201.87 | 12.00 | 372.00 | 66.00 | 2,046.00 | 11.00 | 341.00 | | 0043 | 719-01-06080 | Plants (Plant) (Container) (5 gallon) Indian Hawthorn 'Snow White' | 33 | EACH | 48.47 | 1,599.51 | 14.00 | 462.00 | 66.00 | 2,178.00 | 13.50 | 445.50 | | 0044 | 719-02-00200 | Top Dressing Mulch (4" Depth) Hardwood Mulch | 345 | SQYD | 21.78 | 7,514.10 | 14.00 | 4,830.00 | 10.00 | 3,450.00 | 25.00 | 8,625.00 | | 0045 | 719-03-00300 | Bed Preparation (10" Depth) | 345 | SQYD | 10.89 | 3,757.05 | 35.00 | 12,075.00 | 32.00 | 11,040.00 | 75.00 | 25,875.00 | | 0046 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 493 | SQYD | 3.69 | 1,819.17 | 2.00 | 986.00 | 2.25 | 1,109.25 | 2.25 | 1,109.25 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 36,000.00 | 36,000.00 | 20,000.00 | 20,000.00 | | 0048 | 725-01-00100 | Temporary Detour Roads | 599 | SQYD | 103.81 | 62,182.19 | 130.00 | 77,870.00 | 158.00 | 94,642.00 | 154.00 | 92,246.00 | | 0049 | 726-01-00100 | Bedding Material | 48.3 | CUYD | 117.46 | 5,673.32 | 135.00 | 6,520.50 | 248.00 | 11,978.40 | 122.00 | 5,892.60 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 145,000.00 | 145,000.00 | 135,000.00 | 135,000.00 | 100,000.00 | 100,000.00 | 240,000.00 | 240,000.00 | | 0051 | 729-01-00100 | Sign (Type A) | 228 | SQFT | 42.41 | 9,669.48 | 40.00 | 9,120.00 | 46.00 | 10,488.00 | 40.00 | 9,120.00 | | 0052 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 60.59 | 545.31 | 60.00 | 540.00 | 61.00 | 549.00 | 56.00 | 504.00 | | 0053 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 36 | EACH | 302.93 | 10,905.48 | 300.00 | 10,800.00 | 305.00 | 10,980.00 | 282.00 | 10,152.00 | | 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 294 | EACH | 19.39 | 5,700.66 | 19.00 | 5,586.00 | 20.00 | 5,880.00 | 18.00 | 5,292.00 | | 0055 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 3,520 | LNFT | 3.03 | 10,665.60 | 3.00 | 10,560.00 | 3.25 | 11,440.00 | 3.00 | 10,560.00 | | 0056 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 458 | LNFT | 7.27 | 3,329.66 | 7.00 | 3,206.00 | 7.35 | 3,366.30 | 7.00 | 3,206.00 | | 0057 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 75 | LNFT | 9.69 | 726.75 | 9.00 | 675.00 | 10.00 | 750.00 | 9.00 | 675.00 | | 0058 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 170 | LNFT | 21.81 | 3,707.70 | 20.00 | 3,400.00 | 22.00 | 3,740.00 | 20.00 | 3,400.00 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 155 | LNFT | 27.26 | 4,225.30 | 25.00 | 3,875.00 | 27.50 | 4,262.50 | 25.00 | 3,875.00 | | 0060 | 739-01-00100 | Hydro-Seeding | 1.51 | ACRE | 4,573.99 | 6,906.72 | 6,000.00 | 9,060.00 | 5,000.00 | 7,550.00 | 4,700.00 | 7,097.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | 15,000.00 | 15,000.00 | | 0062 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 6 | EACH | 1,817.56 | 10,905.36 | 3,500.00 | 21,000.00 | 2,200.00 | 13,200.00 | 1.00 | 6.00 | | 0063 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 1 | EACH | 2,423.41 | 2,423.41 | 7,500.00 | 7,500.00 | 3,100.00 | 3,100.00 | 1.00 | 1.00 | | 0064 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 960 | INLF | 1.21 | 1,161.60 | 2.00 | 1,920.00 | 1.05 | 1,008.00 | 2.00 | 1,920.00 | | 0065 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,056 | INLF | 1.21 | 1,277.76 | 2.00 | 2,112.00 | 1.40 | 1,478.40 | 3.00 | 3,168.00 | | 0066 | TS-719-00050 | Irrigation System | 1 | LUMP | 35,866.51 | 35,866.51 | 40,000.00 | 40,000.00 | 46,000.00 | 46,000.00 | 42,000.00 | 42,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,936,083.96 | | 1,969,003.00 | | 2,144,625.40 | | 2,145,338.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GULF STATES SERVICES, LLC | - 6 - Triumph Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.51 | LUMP | 25,000.00 | 25,000.00 | 31,000.00 | 31,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,420 | SQYD | 50.00 | 71,000.00 | 25.65 | 36,423.00 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 1,420 | SQYD | 5.00 | 7,100.00 | 25.65 | 36,423.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 361 | SQYD | 30.00 | 10,830.00 | 18.90 | 6,822.90 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 102,500.00 | 102,500.00 | 92,000.00 | 92,000.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches To Be As Directed by the Project Engineer | 150 | LNFT | 15.00 | 2,250.00 | 46.95 | 7,042.50 | | 0008 | 204-02-00100 | Temporary Hay Bales | 14 | EACH | 1.00 | 14.00 | 49.15 | 688.10 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 1.00 | 12.00 | 219.95 | 2,639.40 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,994 | LNFT | 1.00 | 1,994.00 | 3.50 | 6,979.00 | | 0011 | 302-02-04000 | Class II Base Course (4" Thick) Stone of Recycled Portland Cement Concrete | 3,609 | SQYD | 24.50 | 88,420.50 | 50.90 | 183,698.10 | | 0012 | 302-02-09010 | Class II Base Course (9" Thick) (Soil Cement) | 3,496 | SQYD | 38.00 | 132,848.00 | 75.50 | 263,948.00 | | 0013 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) As Directed by Project Engineer | 3,496 | SQYD | 1.00 | 3,496.00 | 48.50 | 169,556.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 200.00 | 800.00 | 100.65 | 402.60 | | 0015 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 200.00 | 12,000.00 | 105.20 | 6,312.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 142 | TON | 250.00 | 35,500.00 | 417.10 | 59,228.20 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 1,294 | SQYD | 8.00 | 10,352.00 | 31.60 | 40,890.40 | | 0018 | 510-02-00100 | Pavement Widening (12" Thick) | 545 | SQYD | 145.00 | 79,025.00 | 135.30 | 73,738.50 | | 0019 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 2,694 | SQYD | 100.00 | 269,400.00 | 101.50 | 273,441.00 | | 0020 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) (11" Thick)(Brick Red Color - Broom Finish) | 788 | SQYD | 165.00 | 130,020.00 | 173.80 | 136,954.40 | | 0021 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 208 | LNFT | 280.00 | 58,240.00 | 323.90 | 67,371.20 | | 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 36 | LNFT | 220.00 | 7,920.00 | 222.40 | 8,006.40 | | 0023 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 160 | LNFT | 180.00 | 28,800.00 | 280.50 | 44,880.00 | | 0024 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 132 | LNFT | 170.00 | 22,440.00 | 192.20 | 25,370.40 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,000.00 | 8,000.00 | 6,627.15 | 13,254.30 | | 0026 | 702-08-00100 | Side Drain Safety End (Type 1) | 9 | EACH | 4,000.00 | 36,000.00 | 4,501.60 | 40,514.40 | | 0027 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 6,000.00 | 18,000.00 | 8,000.10 | 24,000.30 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 323 | SQYD | 150.00 | 48,450.00 | 89.75 | 28,989.25 | | 0029 | 707-01-00100 | Concrete Curb | 959 | LNFT | 38.00 | 36,442.00 | 48.15 | 46,175.85 | | 0030 | 707-03-00100 | Combination Concrete Curb and Gutter 3" Mountable | 1,040 | LNFT | 65.00 | 67,600.00 | 71.05 | 73,892.00 | | 0031 | 710-01-00100 | Flowable Fill | 73 | CUYD | 200.00 | 14,600.00 | 201.55 | 14,713.15 | | 0032 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 23 | SQYD | 300.00 | 6,900.00 | 92.85 | 2,135.55 | | 0033 | 711-04-00100 | Geotextile Fabric | 23 | SQYD | 15.00 | 345.00 | 52.95 | 1,217.85 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 142,000.00 | 142,000.00 | 97,000.00 | 97,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 2,850 | LNFT | 0.40 | 1,140.00 | 0.50 | 1,425.00 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 40 | LNFT | 1.00 | 40.00 | 1.15 | 46.00 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 347 | SQYD | 7.00 | 2,429.00 | 28.80 | 9,993.60 | | 0038 | 715-01-00100 | Topsoil 9" Depth | 86.5 | CUYD | 100.00 | 8,650.00 | 87.40 | 7,560.10 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 3,500.00 | 2,800.00 | 2,818.25 | 2,254.60 | | 0040 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) Natchez Crape Myrtle | 3 | EACH | 1,500.00 | 4,500.00 | 1,409.15 | 4,227.45 | | 0041 | 719-01-06040 | Plants (Plant) (Container) (2 gallon) Flax Lily | 33 | EACH | 25.00 | 825.00 | 5.65 | 186.45 | | 0042 | 719-01-06080 | Plants (Plant) (Container) (5 gallon) Carissa Holly | 31 | EACH | 55.00 | 1,705.00 | 11.30 | 350.30 | | 0043 | 719-01-06080 | Plants (Plant) (Container) (5 gallon) Indian Hawthorn 'Snow White' | 33 | EACH | 150.00 | 4,950.00 | 13.55 | 447.15 | | 0044 | 719-02-00200 | Top Dressing Mulch (4" Depth) Hardwood Mulch | 345 | SQYD | 5.00 | 1,725.00 | 13.55 | 4,674.75 | | 0045 | 719-03-00300 | Bed Preparation (10" Depth) | 345 | SQYD | 5.00 | 1,725.00 | 33.85 | 11,678.25 | | 0046 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 493 | SQYD | 5.50 | 2,711.50 | 6.90 | 3,401.70 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 17,500.00 | 17,500.00 | 139,550.00 | 139,550.00 | | 0048 | 725-01-00100 | Temporary Detour Roads | 599 | SQYD | 300.00 | 179,700.00 | 120.05 | 71,909.95 | | 0049 | 726-01-00100 | Bedding Material | 48.3 | CUYD | 1.00 | 48.30 | 128.20 | 6,192.06 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 355,000.00 | 355,000.00 | 229,396.29 | 229,396.29 | | 0051 | 729-01-00100 | Sign (Type A) | 228 | SQFT | 28.00 | 6,384.00 | 39.50 | 9,006.00 | | 0052 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 50.00 | 450.00 | 56.40 | 507.60 | | 0053 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 36 | EACH | 250.00 | 9,000.00 | 281.85 | 10,146.60 | | 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 294 | EACH | 18.00 | 5,292.00 | 18.05 | 5,306.70 | | 0055 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 3,520 | LNFT | 2.50 | 8,800.00 | 2.85 | 10,032.00 | | 0056 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 458 | LNFT | 6.00 | 2,748.00 | 6.80 | 3,114.40 | | 0057 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 75 | LNFT | 8.00 | 600.00 | 9.05 | 678.75 | | 0058 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 170 | LNFT | 18.00 | 3,060.00 | 20.30 | 3,451.00 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 155 | LNFT | 22.50 | 3,487.50 | 25.40 | 3,937.00 | | 0060 | 739-01-00100 | Hydro-Seeding | 1.51 | ACRE | 5,500.00 | 8,305.00 | 4,735.00 | 7,149.85 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 93,000.00 | 93,000.00 | | 0062 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 6 | EACH | 1,200.00 | 7,200.00 | 3,832.80 | 22,996.80 | | 0063 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 1 | EACH | 1,500.00 | 1,500.00 | 6,538.30 | 6,538.30 | | 0064 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 960 | INLF | 1.00 | 960.00 | 1.75 | 1,680.00 | | 0065 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,056 | INLF | 1.00 | 1,056.00 | 1.85 | 1,953.60 | | 0066 | TS-719-00050 | Irrigation System | 1 | LUMP | 12,000.00 | 12,000.00 | 39,500.00 | 39,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,189,589.80 | | 2,640,000.00 |
|