Proposal:H.014085.6
Parish:Terrebonne
Routes:LA 315, LA 661
Description:LA 661: LA 315 - LA 659
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS AND RELATED WORK.
Estimated Construction Cost:$3,879,110.95
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $4,900,814.89 |
| 2 | 06276 | Barriere Construction Co., LLC | $5,155,682.46 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 141 | SQYD | 85.00 | 11,985.00 | 130.00 | 18,330.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 402 | LNFT | 17.00 | 6,834.00 | 60.00 | 24,120.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 850 | LNFT | 10.00 | 8,500.00 | 17.00 | 14,450.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 26 | EACH | 120.00 | 3,120.00 | 51.00 | 1,326.00 | | 0005 | 203-01-00100 | General Excavation | 185 | CUYD | 35.00 | 6,475.00 | 300.00 | 55,500.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 265 | CUYD | 50.00 | 13,250.00 | 105.00 | 27,825.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 10,544 | TON | 163.00 | 1,718,672.00 | 161.00 | 1,697,584.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 795 | TON | 355.00 | 282,225.00 | 350.00 | 278,250.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 59,772 | SQYD | 3.50 | 209,202.00 | 5.00 | 298,860.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,081 | CUYD | 0.01 | -20.81 | 1.00 | -2,081.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 4,140 | SQYD | 205.00 | 848,700.00 | 155.00 | 641,700.00 | | 0012 | 510-03-00100 | Pavement Joint Repair | 52 | TON | 815.00 | 42,380.00 | 1,050.00 | 54,600.00 | | 0013 | 602-10-00100 | Longitudinal Shoulder Joints | 200 | LNFT | 1.50 | 300.00 | 6.25 | 1,250.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 8 | EACH | 4,200.00 | 33,600.00 | 5,100.00 | 40,800.00 | | 0015 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 14 | EACH | 250.00 | 3,500.00 | 200.00 | 2,800.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 46 | EACH | 4,600.00 | 211,600.00 | 7,000.00 | 322,000.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 512.6 | LNFT | 60.00 | 30,756.00 | 35.00 | 17,941.00 | | 0018 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100.2 | LNFT | 110.00 | 11,022.00 | 56.00 | 5,611.20 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 150.00 | 22,500.00 | 130.00 | 19,500.00 | | 0020 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,200.00 | 5,200.00 | 3,500.00 | 3,500.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 6 | EACH | 4,650.00 | 27,900.00 | 3,300.00 | 19,800.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,850.00 | 4,850.00 | 3,500.00 | 3,500.00 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 52.2 | SQYD | 305.00 | 15,921.00 | 115.00 | 6,003.00 | | 0024 | 706-04-00100 | Handicapped Curb Ramps Type 10 | 1 | EACH | 3,400.00 | 3,400.00 | 3,300.00 | 3,300.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps Type 12 | 1 | EACH | 3,400.00 | 3,400.00 | 3,300.00 | 3,300.00 | | 0026 | 706-04-00100 | Handicapped Curb Ramps Type 3 | 8 | EACH | 3,300.00 | 26,400.00 | 3,300.00 | 26,400.00 | | 0027 | 706-04-00100 | Handicapped Curb Ramps Type 8 | 9 | EACH | 3,050.00 | 27,450.00 | 3,300.00 | 29,700.00 | | 0028 | 707-01-00100 | Concrete Curb | 231 | LNFT | 65.00 | 15,015.00 | 66.00 | 15,246.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 500,000.00 | 500,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,288 | LNFT | 1.25 | 1,610.00 | 1.00 | 1,288.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 930 | LNFT | 2.50 | 2,325.00 | 2.00 | 1,860.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.899 | MILE | 400.00 | 3,159.60 | 308.00 | 2,432.89 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.499 | MILE | 1,000.00 | 2,499.00 | 1,100.00 | 2,748.90 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 29.119 | MILE | 3,000.00 | 87,357.00 | 2,600.00 | 75,709.40 | | 0035 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 12 | EACH | 50.00 | 600.00 | 51.00 | 612.00 | | 0036 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 9 | EACH | 50.00 | 450.00 | 51.00 | 459.00 | | 0037 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 24 | EACH | 50.00 | 1,200.00 | 51.00 | 1,224.00 | | 0038 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 21 | EACH | 50.00 | 1,050.00 | 51.00 | 1,071.00 | | 0039 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 21 | EACH | 50.00 | 1,050.00 | 51.00 | 1,071.00 | | 0040 | 717-01-00100 | Seeding | 48 | LB | 25.00 | 1,200.00 | 37.00 | 1,776.00 | | 0041 | 718-01-00100 | Fertilizer | 1,591 | LB | 3.00 | 4,773.00 | 1.40 | 2,227.40 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 490,000.00 | 490,000.00 | 391,500.00 | 391,500.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 115.00 | 2,760.00 | 100.00 | 2,400.00 | | 0044 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 1,300.00 | 2,600.00 | 1,700.00 | 3,400.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,430 | EACH | 16.00 | 22,880.00 | 13.00 | 18,590.00 | | 0046 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 644 | LNFT | 7.50 | 4,830.00 | 7.00 | 4,508.00 | | 0047 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 236 | LNFT | 26.00 | 6,136.00 | 21.00 | 4,956.00 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 229 | LNFT | 33.00 | 7,557.00 | 26.00 | 5,954.00 | | 0049 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 42 | LNFT | 6.50 | 273.00 | 5.50 | 231.00 | | 0050 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 106 | LNFT | 6.50 | 689.00 | 6.25 | 662.50 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.503 | MILE | 9,800.00 | 102,929.40 | 7,600.00 | 79,822.80 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.833 | MILE | 2,600.00 | 2,165.80 | 2,100.00 | 1,749.30 | | 0053 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 585.00 | 2,340.00 | 475.00 | 1,900.00 | | 0054 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 985.00 | 2,955.00 | 751.00 | 2,253.00 | | 0055 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 650.00 | 5,200.00 | 550.00 | 4,400.00 | | 0056 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 50.00 | 350.00 | 550.00 | 3,850.00 | | 0057 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 650.00 | 4,550.00 | 550.00 | 3,850.00 | | 0058 | 732-05-00100 | Removal of Existing Markings | 0.185 | MILE | 30,000.00 | 5,550.00 | 30,000.00 | 5,550.00 | | 0059 | 735-01-00100 | Mailboxes | 109 | EACH | 30.00 | 3,270.00 | 2.00 | 218.00 | | 0060 | 735-02-00100 | Mailbox Supports (Single) | 99 | EACH | 325.00 | 32,175.00 | 175.00 | 17,325.00 | | 0061 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 450.00 | 2,250.00 | 280.00 | 1,400.00 | | 0062 | 736-01-00100 | Trenching and Backfilling | 35 | LNFT | 18.00 | 630.00 | 118.00 | 4,130.00 | | 0063 | 736-09-00100 | Loop Detector | 1,939 | LNFT | 40.00 | 77,560.00 | 22.00 | 42,658.00 | | 0064 | 736-10-00200 | Underground Junction Box (Type E) | 5 | EACH | 2,600.00 | 13,000.00 | 1,600.00 | 8,000.00 | | 0065 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 35 | LNFT | 9.50 | 332.50 | 35.00 | 1,225.00 | | 0066 | 740-01-00100 | Construction Layout | 1 | LUMP | 21,000.00 | 21,000.00 | 50,000.00 | 50,000.00 | | 0067 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 33,312 | LNFT | 1.65 | 54,964.80 | 1.70 | 56,630.40 | | 0068 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 18,804 | LNFT | 1.90 | 35,727.60 | 3.50 | 65,814.00 | | 0069 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 52,116 | LNFT | 1.25 | 65,145.00 | 2.00 | 104,232.00 | | 0070 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,010 | INLF | 1.00 | 3,010.00 | 1.00 | 3,010.00 | | 0071 | NS-719-00002 | Tree Trimming | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0072 | NS-MSC-00279 | Adjusting Valve Boxes | 7 | EACH | 225.00 | 1,575.00 | 2,409.81 | 16,868.67 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,900,814.89 | | 5,155,682.46 |
|