Proposal:H.014051.6
Parish:St. Charles
Description:LAKEWOOD DR. RECONSTRUCTION
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$6,365,941.65
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $5,979,591.63 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $6,994,082.50 |
| 3 | 24901 | Hard Rock Construction LLC | $7,021,312.90 |
| 4 | 44187 | Impetus Infrastructure LLC | $8,211,686.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - Hard Rock Construction LLC | - 4 - Impetus Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 80,000.00 | 80,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 121 | SQYD | 23.00 | 2,783.00 | 15.00 | 1,815.00 | 25.00 | 3,025.00 | 23.00 | 2,783.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 563.5 | SQYD | 20.00 | 11,270.00 | 15.00 | 8,452.50 | 32.00 | 18,032.00 | 26.00 | 14,651.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,116 | SQYD | 20.00 | 42,320.00 | 15.00 | 31,740.00 | 28.00 | 59,248.00 | 26.00 | 55,016.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 21,917 | SQYD | 15.00 | 328,755.00 | 16.00 | 350,672.00 | 29.00 | 635,593.00 | 17.00 | 372,589.00 | | 0007 | 202-03-38000 | Relocation of Sign | 47 | EACH | 40.00 | 1,880.00 | 40.00 | 1,880.00 | 28.50 | 1,339.50 | 46.00 | 2,162.00 | | 0008 | 202-03-38020 | Relocation of Sign Pole Relocation of Poles for Sign Relocations | 47 | EACH | 250.00 | 11,750.00 | 225.00 | 10,575.00 | 220.00 | 10,340.00 | 265.00 | 12,455.00 | | 0009 | 203-01-00100 | General Excavation | 17,276 | CUYD | 17.50 | 302,330.00 | 48.00 | 829,248.00 | 12.00 | 207,312.00 | 25.00 | 431,900.00 | | 0010 | 203-03-00100 | Embankment | 410 | CUYD | 35.00 | 14,350.00 | 43.00 | 17,630.00 | 54.00 | 22,140.00 | 53.00 | 21,730.00 | | 0011 | 203-04-00100 | Nonplastic Embankment SAND | 7,908 | CUYD | 32.50 | 257,010.00 | 37.00 | 292,596.00 | 40.00 | 316,320.00 | 51.00 | 403,308.00 | | 0012 | 203-08-00100 | Geotextile Fabric | 23,717 | SQYD | 2.50 | 59,292.50 | 3.00 | 71,151.00 | 1.50 | 35,575.50 | 2.70 | 64,035.90 | | 0013 | 204-02-00100 | Temporary Hay Bales | 114 | EACH | 35.00 | 3,990.00 | 25.00 | 2,850.00 | 22.00 | 2,508.00 | 27.00 | 3,078.00 | | 0014 | 204-04-00100 | Temporary Sediment Basins | 57 | EACH | 200.00 | 11,400.00 | 315.00 | 17,955.00 | 170.00 | 9,690.00 | 206.00 | 11,742.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 7,698 | LNFT | 7.00 | 53,886.00 | 2.50 | 19,245.00 | 2.00 | 15,396.00 | 2.60 | 20,014.80 | | 0016 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 23,717.5 | SQYD | 28.25 | 670,019.38 | 37.00 | 877,547.50 | 39.00 | 924,982.50 | 36.00 | 853,830.00 | | 0017 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 125.00 | 62,500.00 | 160.00 | 80,000.00 | 144.00 | 72,000.00 | 84.00 | 42,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 221.6 | TON | 440.00 | 97,504.00 | 400.00 | 88,640.00 | 380.00 | 84,208.00 | 498.00 | 110,356.80 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 38.6 | TON | 285.00 | 11,001.00 | 275.00 | 10,615.00 | 260.00 | 10,036.00 | 332.00 | 12,815.20 | | 0020 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 73.9 | TON | 600.00 | 44,340.00 | 550.00 | 40,645.00 | 585.00 | 43,231.50 | 710.00 | 52,469.00 | | 0021 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 20,631.3 | SQYD | 95.00 | 1,959,973.50 | 110.00 | 2,269,443.00 | 109.00 | 2,248,811.70 | 129.00 | 2,661,437.70 | | 0022 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 1,030.4 | SQYD | 100.00 | 103,040.00 | 115.00 | 118,496.00 | 105.00 | 108,192.00 | 99.00 | 102,009.60 | | 0023 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 119 | LNFT | 55.00 | 6,545.00 | 105.00 | 12,495.00 | 202.00 | 24,038.00 | 156.00 | 18,564.00 | | 0024 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 306 | LNFT | 85.00 | 26,010.00 | 135.00 | 41,310.00 | 208.00 | 63,648.00 | 358.00 | 109,548.00 | | 0025 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 48 | LNFT | 225.00 | 10,800.00 | 235.00 | 11,280.00 | 395.00 | 18,960.00 | 400.00 | 19,200.00 | | 0026 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 165 | LNFT | 275.00 | 45,375.00 | 300.00 | 49,500.00 | 434.00 | 71,610.00 | 644.00 | 106,260.00 | | 0027 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 10 | EACH | 1,750.00 | 17,500.00 | 2,050.00 | 20,500.00 | 2,400.00 | 24,000.00 | 6,400.00 | 64,000.00 | | 0028 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 7,650.00 | 7,650.00 | 10,175.00 | 10,175.00 | 21,200.00 | 21,200.00 | 23,400.00 | 23,400.00 | | 0029 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 10 | EACH | 2,100.00 | 21,000.00 | 2,800.00 | 28,000.00 | 2,900.00 | 29,000.00 | 3,500.00 | 35,000.00 | | 0030 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 7,500.00 | 15,000.00 | 9,700.00 | 19,400.00 | 22,500.00 | 45,000.00 | 14,205.00 | 28,410.00 | | 0031 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 10 | EACH | 1,200.00 | 12,000.00 | 2,850.00 | 28,500.00 | 5,600.00 | 56,000.00 | 805.00 | 8,050.00 | | 0032 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 15 | EACH | 750.00 | 11,250.00 | 1,750.00 | 26,250.00 | 1,000.00 | 15,000.00 | 650.00 | 9,750.00 | | 0033 | 702-04-00200 | Adjusting Catch Basins | 25 | EACH | 1,200.00 | 30,000.00 | 1,675.00 | 41,875.00 | 4,000.00 | 100,000.00 | 5,000.00 | 125,000.00 | | 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 16.4 | SQYD | 65.00 | 1,066.00 | 65.00 | 1,066.00 | 175.00 | 2,870.00 | 74.00 | 1,213.60 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 2,093.4 | SQYD | 75.00 | 157,005.00 | 80.00 | 167,472.00 | 110.00 | 230,274.00 | 73.00 | 152,818.20 | | 0036 | 706-03-00800 | Incidental Concrete Paving (12" Thick) | 22.3 | SQYD | 350.00 | 7,805.00 | 120.00 | 2,676.00 | 280.00 | 6,244.00 | 30.00 | 669.00 | | 0037 | 707-01-00100 | Concrete Curb | 10,555.2 | LNFT | 12.50 | 131,940.00 | 15.00 | 158,328.00 | 16.00 | 168,883.20 | 40.00 | 422,208.00 | | 0038 | 707-03-00100 | Combination Concrete Curb and Gutter | 269 | LNFT | 35.00 | 9,415.00 | 35.00 | 9,415.00 | 60.00 | 16,140.00 | 62.00 | 16,678.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 230,000.00 | 230,000.00 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,000 | LNFT | 0.45 | 450.00 | 0.50 | 500.00 | 0.44 | 440.00 | 0.60 | 600.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,000 | LNFT | 0.90 | 900.00 | 1.00 | 1,000.00 | 0.85 | 850.00 | 1.08 | 1,080.00 | | 0042 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1 | MILE | 575.00 | 575.00 | 625.00 | 625.00 | 550.00 | 550.00 | 665.00 | 665.00 | | 0043 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,122 | SQYD | 10.00 | 11,220.00 | 16.00 | 17,952.00 | 16.00 | 17,952.00 | 13.00 | 14,586.00 | | 0044 | 714-01-00700 | Slab Sodding (Centipede) | 1,122 | SQYD | 9.00 | 10,098.00 | 16.00 | 17,952.00 | 15.50 | 17,391.00 | 11.00 | 12,342.00 | | 0045 | 715-01-00100 | Topsoil | 100 | CUYD | 100.00 | 10,000.00 | 115.00 | 11,500.00 | 82.00 | 8,200.00 | 92.00 | 9,200.00 | | 0046 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 23,000.00 | 23,000.00 | 33,000.00 | 33,000.00 | | 0047 | 726-01-00100 | Bedding Material | 148.5 | CUYD | 150.00 | 22,275.00 | 140.00 | 20,790.00 | 99.00 | 14,701.50 | 87.00 | 12,919.50 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 155,000.00 | 155,000.00 | 300,000.00 | 300,000.00 | 420,000.00 | 420,000.00 | 572,000.00 | 572,000.00 | | 0049 | 729-01-00100 | Sign (Type A) | 20.9 | SQFT | 50.00 | 1,045.00 | 45.00 | 940.50 | 44.00 | 919.60 | 53.00 | 1,107.70 | | 0050 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 1,750.00 | 3,500.00 | 1,600.00 | 3,200.00 | 1,650.00 | 3,300.00 | 2,000.00 | 4,000.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 205 | EACH | 22.50 | 4,612.50 | 25.00 | 5,125.00 | 22.00 | 4,510.00 | 27.00 | 5,535.00 | | 0052 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 216 | LNFT | 11.00 | 2,376.00 | 10.00 | 2,160.00 | 10.00 | 2,160.00 | 12.00 | 2,592.00 | | 0053 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 105 | LNFT | 13.50 | 1,417.50 | 13.00 | 1,365.00 | 13.00 | 1,365.00 | 16.00 | 1,680.00 | | 0054 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 27.50 | 990.00 | 27.00 | 972.00 | 27.50 | 990.00 | 33.00 | 1,188.00 | | 0055 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.259 | MILE | 13,500.00 | 43,996.50 | 13,000.00 | 42,367.00 | 13,200.00 | 43,018.80 | 16,000.00 | 52,144.00 | | 0056 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.009 | MILE | 62,000.00 | 558.00 | 65,000.00 | 585.00 | 60,000.00 | 540.00 | 73,000.00 | 657.00 | | 0057 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 625.00 | 625.00 | 600.00 | 600.00 | 605.00 | 605.00 | 731.00 | 731.00 | | 0058 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 625.00 | 1,250.00 | 600.00 | 1,200.00 | 605.00 | 1,210.00 | 731.00 | 1,462.00 | | 0059 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 625.00 | 625.00 | 600.00 | 600.00 | 605.00 | 605.00 | 731.00 | 731.00 | | 0060 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 575.00 | 575.00 | 575.00 | 575.00 | 550.00 | 550.00 | 665.00 | 665.00 | | 0061 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 40,000.00 | 4,000.00 | 40,000.00 | 4,000.00 | 38,500.00 | 3,850.00 | 47,000.00 | 4,700.00 | | 0062 | 735-01-00100 | Mailboxes | 61 | EACH | 25.00 | 1,525.00 | 25.00 | 1,525.00 | 22.00 | 1,342.00 | 268.00 | 16,348.00 | | 0063 | 735-02-00100 | Mailbox Supports (Single) | 53 | EACH | 300.00 | 15,900.00 | 275.00 | 14,575.00 | 275.00 | 14,575.00 | 425.00 | 22,525.00 | | 0064 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 425.00 | 1,700.00 | 375.00 | 1,500.00 | 385.00 | 1,540.00 | 930.00 | 3,720.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 61,000.00 | 61,000.00 | 180,000.00 | 180,000.00 | | 0066 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 10 | EACH | 2,000.00 | 20,000.00 | 5,000.00 | 50,000.00 | 12,000.00 | 120,000.00 | 3,400.00 | 34,000.00 | | 0067 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 100 | LNFT | 150.00 | 15,000.00 | 300.00 | 30,000.00 | 250.00 | 25,000.00 | 133.00 | 13,300.00 | | 0068 | NS-300-00060 | Geogrid | 47,434 | SQYD | 2.25 | 106,726.50 | 2.00 | 94,868.00 | 1.40 | 66,407.60 | 2.00 | 94,868.00 | | 0069 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,139 | INLF | 1.25 | 2,673.75 | 2.00 | 4,278.00 | 1.50 | 3,208.50 | 1.00 | 2,139.00 | | 0070 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 14,670 | INLF | 1.75 | 25,672.50 | 2.00 | 29,340.00 | 1.50 | 22,005.00 | 1.06 | 15,550.20 | | 0071 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 1 | EACH | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,925.00 | 1,925.00 | 1,600.00 | 1,600.00 | | 0072 | NS-742-00008 | Cured In-Place Sewer Pipe Lining 8 inch | 1,371 | LNFT | 50.00 | 68,550.00 | 50.00 | 68,550.00 | 58.00 | 79,518.00 | 46.00 | 63,066.00 | | 0073 | NS-742-00010 | Cured In-Place Sewer Pipe Lining 10 inch | 1,098 | LNFT | 70.00 | 76,860.00 | 70.00 | 76,860.00 | 65.00 | 71,370.00 | 63.00 | 69,174.00 | | 0074 | NS-742-00012 | Cured In-Place Sewer Pipe Lining 12 inch | 283 | LNFT | 80.00 | 22,640.00 | 80.00 | 22,640.00 | 102.00 | 28,866.00 | 73.00 | 20,659.00 | | 0075 | TS-742-80100 | Sewer Line Point Repair | 80 | EACH | 7,500.00 | 600,000.00 | 1,000.00 | 80,000.00 | 400.00 | 32,000.00 | 5,500.00 | 440,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,979,591.63 | | 6,994,082.50 | | 7,021,312.90 | | 8,211,686.20 |
|