Proposal:H.005967.6-R1
Parish:Calcasieu
Description:NELSON ROAD EXTENSION AND BRIDGE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$69,816,066.45
| Rank | License | Bidder | Construction Bid |
| 1 | 58134 | Johnson Bros. Corp. A Southland Co. | $101,710,925.30 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $105,775,843.20 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $116,574,387.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Johnson Bros. Corp. A Southland Co. | - 2 - Boh Bros. Construction Co., LLC. | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 6 | LUMP | 1,000,000.00 | 1,000,000.00 | 880,000.00 | 880,000.00 | 2,600,000.00 | 2,600,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 250,000.00 | 250,000.00 | 585,000.00 | 585,000.00 | | 0003 | 202-02-00020 | Removal of Concrete Slab (Nelson Rd, Sta. 140+00) | 655 | SQYD | 30.00 | 19,650.00 | 44.00 | 28,820.00 | 100.00 | 65,500.00 | | 0004 | 202-02-00020 | Removal of Concrete Slab (Port Access Connection, Sta. 503+00) | 1,933 | SQYD | 30.00 | 57,990.00 | 44.00 | 85,052.00 | 100.00 | 193,300.00 | | 0005 | 202-02-02000 | Removal of Asphalt Drives | 1,567 | SQYD | 26.00 | 40,742.00 | 18.00 | 28,206.00 | 15.00 | 23,505.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 2,025.1 | SQYD | 30.00 | 60,753.00 | 17.00 | 34,426.70 | 25.00 | 50,627.50 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 3,753.9 | SQYD | 28.00 | 105,109.20 | 28.00 | 105,109.20 | 15.00 | 56,308.50 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 258 | SQYD | 30.00 | 7,740.00 | 26.00 | 6,708.00 | 30.00 | 7,740.00 | | 0009 | 202-02-06140 | Removal of Curbs (Concrete) | 555.5 | LNFT | 25.00 | 13,887.50 | 35.00 | 19,442.50 | 13.00 | 7,221.50 | | 0010 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 1,250.00 | 2,500.00 | 2,000.00 | 4,000.00 | 15,000.00 | 30,000.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,942 | SQYD | 30.00 | 58,260.00 | 40.00 | 77,680.00 | 9.00 | 17,478.00 | | 0012 | 202-02-36000 | Removal of Railroad Grade Crossing | 2 | EACH | 50,000.00 | 100,000.00 | 8,500.00 | 17,000.00 | 15,000.00 | 30,000.00 | | 0013 | 202-02-38340 | Removal of Sign Support Footings (Overhead) | 2 | EACH | 10,000.00 | 20,000.00 | 15,000.00 | 30,000.00 | 7,000.00 | 14,000.00 | | 0014 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | | 0015 | 202-03-00010 | Relocation of Overhead Sign Truss (Sta. 501+49) | 1 | EACH | 56,000.00 | 56,000.00 | 70,000.00 | 70,000.00 | 60,000.00 | 60,000.00 | | 0016 | 202-05-00100 | Excavation, Disposal and Backfilling of Contaminated Soil | 100 | CUYD | 120.00 | 12,000.00 | 250.00 | 25,000.00 | 850.00 | 85,000.00 | | 0017 | 203-01-00100 | General Excavation | 12,849 | CUYD | 30.00 | 385,470.00 | 50.00 | 642,450.00 | 20.00 | 256,980.00 | | 0018 | 203-02-00100 | Drainage Excavation | 1,193 | CUYD | 60.00 | 71,580.00 | 90.00 | 107,370.00 | 40.00 | 47,720.00 | | 0019 | 203-03-00100 | Embankment | 30,924 | CUYD | 35.00 | 1,082,340.00 | 56.00 | 1,731,744.00 | 65.00 | 2,010,060.00 | | 0020 | 203-08-00100 | Geotextile Fabric | 59 | SQYD | 20.00 | 1,180.00 | 12.00 | 708.00 | 10.00 | 590.00 | | 0021 | 204-02-00100 | Temporary Hay Bales | 437 | EACH | 45.00 | 19,665.00 | 45.00 | 19,665.00 | 25.00 | 10,925.00 | | 0022 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 172.00 | 2,408.00 | 175.00 | 2,450.00 | 300.00 | 4,200.00 | | 0023 | 204-06-00100 | Temporary Silt Fencing | 16,503 | LNFT | 3.00 | 49,509.00 | 2.50 | 41,257.50 | 3.00 | 49,509.00 | | 0024 | 302-02-06070 | Class II Base Course (6" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 517 | SQYD | 55.00 | 28,435.00 | 30.00 | 15,510.00 | 65.00 | 33,605.00 | | 0025 | 305-01-04000 | Subgrade Layer (12" Thick) | 27,740 | SQYD | 16.00 | 443,840.00 | 25.00 | 693,500.00 | 38.00 | 1,054,120.00 | | 0026 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,000 | CUYD | 150.00 | 150,000.00 | 150.00 | 150,000.00 | 150.00 | 150,000.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 851.2 | TON | 200.00 | 170,240.00 | 220.00 | 187,264.00 | 250.00 | 212,800.00 | | 0028 | 502-03-00300 | Asphalt Concrete (6" Thick) | 669.7 | SQYD | 60.00 | 40,182.00 | 90.00 | 60,273.00 | 72.00 | 48,218.40 | | 0029 | 502-03-00400 | Asphalt Concrete (8" Thick) | 24,508.2 | SQYD | 70.00 | 1,715,574.00 | 80.00 | 1,960,656.00 | 74.00 | 1,813,606.80 | | 0030 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 23,857.8 | SQYD | 150.00 | 3,578,670.00 | 240.00 | 5,725,872.00 | 200.00 | 4,771,560.00 | | 0031 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 30 | EACH | 750.00 | 22,500.00 | 400.00 | 12,000.00 | 500.00 | 15,000.00 | | 0032 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,224 | LNFT | 180.00 | 220,320.00 | 145.00 | 177,480.00 | 250.00 | 306,000.00 | | 0033 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,050 | LNFT | 200.00 | 210,000.00 | 150.00 | 157,500.00 | 270.00 | 283,500.00 | | 0034 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 207 | LNFT | 300.00 | 62,100.00 | 190.00 | 39,330.00 | 360.00 | 74,520.00 | | 0035 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 266 | LNFT | 300.00 | 79,800.00 | 250.00 | 66,500.00 | 380.00 | 101,080.00 | | 0036 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 383 | LNFT | 365.00 | 139,795.00 | 350.00 | 134,050.00 | 460.00 | 176,180.00 | | 0037 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 54 | LNFT | 585.00 | 31,590.00 | 520.00 | 28,080.00 | 650.00 | 35,100.00 | | 0038 | 701-03-01140 | Storm Drain Pipe (60" RCP) | 1,140 | LNFT | 800.00 | 912,000.00 | 630.00 | 718,200.00 | 1,200.00 | 1,368,000.00 | | 0039 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 78 | LNFT | 365.00 | 28,470.00 | 350.00 | 27,300.00 | 500.00 | 39,000.00 | | 0040 | 701-03-02102 | Storm Drain Pipe (Outfall) (42" RPVCP or 48" CMP) | 30 | LNFT | 560.00 | 16,800.00 | 485.00 | 14,550.00 | 900.00 | 27,000.00 | | 0041 | 701-03-02160 | Storm Drain Pipe (Outfall) (60" CMP) | 146 | LNFT | 820.00 | 119,720.00 | 600.00 | 87,600.00 | 1,200.00 | 175,200.00 | | 0042 | 701-07-00700 | Yard Drain Pipe (18") | 18 | LNFT | 235.00 | 4,230.00 | 230.00 | 4,140.00 | 725.00 | 13,050.00 | | 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 4,164 | LNFT | 2.00 | 8,328.00 | 18.00 | 74,952.00 | 25.00 | 104,100.00 | | 0044 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 20,000.00 | 20,000.00 | 13,000.00 | 13,000.00 | 45,000.00 | 45,000.00 | | 0045 | 702-02-00100 | Manholes (MH-06) (Saddle Existing Structure) | 2 | EACH | 21,000.00 | 42,000.00 | 11,000.00 | 22,000.00 | 40,000.00 | 80,000.00 | | 0046 | 702-02-00800 | Manholes (R-CB-38) (Conflict Box) | 2 | EACH | 21,000.00 | 42,000.00 | 12,000.00 | 24,000.00 | 40,000.00 | 80,000.00 | | 0047 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 9,000.00 | 36,000.00 | 5,000.00 | 20,000.00 | 10,000.00 | 40,000.00 | | 0048 | 702-03-00100 | Catch Basins (CB-01) (Saddle Existing Structure) | 2 | EACH | 14,000.00 | 28,000.00 | 7,000.00 | 14,000.00 | 19,000.00 | 38,000.00 | | 0049 | 702-03-00500 | Catch Basins (CB-06) | 14 | EACH | 13,000.00 | 182,000.00 | 14,000.00 | 196,000.00 | 26,000.00 | 364,000.00 | | 0050 | 702-03-00500 | Catch Basins (CB-06) (Saddle Existing Structure) | 3 | EACH | 17,000.00 | 51,000.00 | 15,000.00 | 45,000.00 | 40,000.00 | 120,000.00 | | 0051 | 702-03-00600 | Catch Basins (CB-07) | 10 | EACH | 12,500.00 | 125,000.00 | 14,000.00 | 140,000.00 | 26,000.00 | 260,000.00 | | 0052 | 702-03-00700 | Catch Basins (CB-08) | 11 | EACH | 20,000.00 | 220,000.00 | 23,000.00 | 253,000.00 | 33,000.00 | 363,000.00 | | 0053 | 702-03-00800 | Catch Basins (CB-09) | 7 | EACH | 8,500.00 | 59,500.00 | 11,000.00 | 77,000.00 | 36,000.00 | 252,000.00 | | 0054 | 702-04-00200 | Adjusting Catch Basins | 8 | EACH | 1,500.00 | 12,000.00 | 3,500.00 | 28,000.00 | 11,000.00 | 88,000.00 | | 0055 | 706-02-00300 | Concrete Drive (8" Thick) | 545.5 | SQYD | 185.00 | 100,917.50 | 90.00 | 49,095.00 | 165.00 | 90,007.50 | | 0056 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 137.6 | SQYD | 85.00 | 11,696.00 | 100.00 | 13,760.00 | 160.00 | 22,016.00 | | 0057 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 58.3 | SQYD | 115.00 | 6,704.50 | 140.00 | 8,162.00 | 250.00 | 14,575.00 | | 0058 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Red) (4" Thick) | 2,980.2 | SQYD | 177.00 | 527,495.40 | 210.00 | 625,842.00 | 165.00 | 491,733.00 | | 0059 | 706-04-00100 | Handicapped Curb Ramps (TYPE 10) | 1 | EACH | 2,900.00 | 2,900.00 | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 | | 0060 | 706-04-00100 | Handicapped Curb Ramps (TYPE 7) | 12 | EACH | 2,750.00 | 33,000.00 | 3,300.00 | 39,600.00 | 7,500.00 | 90,000.00 | | 0061 | 707-01-00100 | Concrete Curb | 6,139.9 | LNFT | 40.00 | 245,596.00 | 45.00 | 276,295.50 | 10.00 | 61,399.00 | | 0062 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,238.3 | LNFT | 130.00 | 160,979.00 | 160.00 | 198,128.00 | 75.00 | 92,872.50 | | 0063 | 708-01-00100 | Right-of-Way Monument | 42 | EACH | 500.00 | 21,000.00 | 500.00 | 21,000.00 | 500.00 | 21,000.00 | | 0064 | 708-02-00100 | Right-of-Way Monument Witness Post | 42 | EACH | 600.00 | 25,200.00 | 500.00 | 21,000.00 | 500.00 | 21,000.00 | | 0065 | 710-01-00100 | Flowable Fill | 16 | CUYD | 150.00 | 2,400.00 | 900.00 | 14,400.00 | 250.00 | 4,000.00 | | 0066 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 390.28 | CUYD | 200.00 | 78,056.00 | 300.00 | 117,084.00 | 400.00 | 156,112.00 | | 0067 | 711-01-01080 | Riprap (2 lb, 24" Thick) | 67 | SQYD | 175.00 | 11,725.00 | 250.00 | 16,750.00 | 250.00 | 16,750.00 | | 0068 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 10.00 | 670.00 | 20.00 | 1,340.00 | 35.00 | 2,345.00 | | 0069 | 712-04-00100 | Flexible Revetment | 1,500 | SQYD | 125.00 | 187,500.00 | 210.00 | 315,000.00 | 140.00 | 210,000.00 | | 0070 | 712-05-00100 | Cabled Articulated Concrete Block Mattress | 7,423.4 | SQYD | 85.00 | 630,989.00 | 75.00 | 556,755.00 | 185.00 | 1,373,329.00 | | 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 350,000.00 | 350,000.00 | 1,500,000.00 | 1,500,000.00 | | 0072 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 32,246 | LNFT | 0.75 | 24,184.50 | 1.00 | 32,246.00 | 1.00 | 32,246.00 | | 0073 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,800 | LNFT | 0.20 | 960.00 | 0.25 | 1,200.00 | 0.50 | 2,400.00 | | 0074 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 58 | LNFT | 0.50 | 29.00 | 0.65 | 37.70 | 1.00 | 58.00 | | 0075 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.09 | MILE | 1,000.00 | 2,090.00 | 1,300.00 | 2,717.00 | 1,500.00 | 3,135.00 | | 0076 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 721 | EACH | 8.00 | 5,768.00 | 11.00 | 7,931.00 | 15.00 | 10,815.00 | | 0077 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 79 | EACH | 1,000.00 | 79,000.00 | 1,300.00 | 102,700.00 | 800.00 | 63,200.00 | | 0078 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 2,200.00 | 880.00 | 2,300.00 | 920.00 | 6,500.00 | 2,600.00 | | 0079 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,231 | SQYD | 2.50 | 3,077.50 | 2.50 | 3,077.50 | 2.00 | 2,462.00 | | 0080 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | 375,000.00 | 375,000.00 | | 0081 | 725-01-00100 | Temporary Detour Roads | 3,288.7 | SQYD | 110.00 | 361,757.00 | 130.00 | 427,531.00 | 300.00 | 986,610.00 | | 0082 | 726-01-00100 | Bedding Material | 626 | CUYD | 150.00 | 93,900.00 | 200.00 | 125,200.00 | 300.00 | 187,800.00 | | 0083 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000,000.00 | 10,000,000.00 | 10,650,000.00 | 10,650,000.00 | 11,000,000.00 | 11,000,000.00 | | 0084 | 729-01-00100 | Sign (Type A) | 246 | SQFT | 40.00 | 9,840.00 | 40.00 | 9,840.00 | 40.00 | 9,840.00 | | 0085 | 729-04-00100 | Sign (Type D) | 56 | SQFT | 50.00 | 2,800.00 | 50.00 | 2,800.00 | 50.00 | 2,800.00 | | 0086 | 729-06-00100 | Sign (Overhead Mounted) | 126 | SQFT | 55.00 | 6,930.00 | 55.00 | 6,930.00 | 50.00 | 6,300.00 | | 0087 | 729-08-00100 | Mounting (2 1/2" Size Post) | 1 | EACH | 2,000.00 | 2,000.00 | 2,100.00 | 2,100.00 | 1,900.00 | 1,900.00 | | 0088 | 729-08-00200 | Mounting (3 1/2" Size Post) | 5 | EACH | 2,200.00 | 11,000.00 | 2,300.00 | 11,500.00 | 2,100.00 | 10,500.00 | | 0089 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 7,400.00 | 7,400.00 | 7,500.00 | 7,500.00 | 6,700.00 | 6,700.00 | | 0090 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 2,600.00 | 5,200.00 | 2,500.00 | 5,000.00 | 2,600.00 | 5,200.00 | | 0091 | 729-14-00100 | Delineator Assembly (Ground Mounted) | 4 | EACH | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 900.00 | 3,600.00 | | 0092 | 729-16-00200 | Object Marker Assembly (Type 2) | 3 | EACH | 65.00 | 195.00 | 65.00 | 195.00 | 60.00 | 180.00 | | 0093 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 115.00 | 460.00 | 100.00 | 400.00 | | 0094 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 3,200.00 | 3,200.00 | 3,300.00 | 3,300.00 | 3,200.00 | 3,200.00 | | 0095 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 2 | EACH | 70,000.00 | 140,000.00 | 80,000.00 | 160,000.00 | 80,000.00 | 160,000.00 | | 0096 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 250.00 | 4,500.00 | 250.00 | 4,500.00 | 250.00 | 4,500.00 | | 0097 | 731-02-00100 | Reflectorized Raised Pavement Markers | 647 | EACH | 8.00 | 5,176.00 | 11.00 | 7,117.00 | 10.00 | 6,470.00 | | 0098 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 819 | LNFT | 20.00 | 16,380.00 | 25.00 | 20,475.00 | 22.00 | 18,018.00 | | 0099 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.186 | MILE | 5,500.00 | 23,023.00 | 7,500.00 | 31,395.00 | 5,700.00 | 23,860.20 | | 0100 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.341 | MILE | 18,500.00 | 6,308.50 | 25,000.00 | 8,525.00 | 20,000.00 | 6,820.00 | | 0101 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.816 | MILE | 2,150.00 | 3,904.40 | 3,000.00 | 5,448.00 | 2,300.00 | 4,176.80 | | 0102 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.568 | MILE | 17,000.00 | 9,656.00 | 22,000.00 | 12,496.00 | 17,000.00 | 9,656.00 | | 0103 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.84 | MILE | 5,000.00 | 4,200.00 | 6,500.00 | 5,460.00 | 6,000.00 | 5,040.00 | | 0104 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 500.00 | 1,000.00 | 650.00 | 1,300.00 | 600.00 | 1,200.00 | | 0105 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 500.00 | 3,000.00 | 650.00 | 3,900.00 | 600.00 | 3,600.00 | | 0106 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 500.00 | 500.00 | 650.00 | 650.00 | 600.00 | 600.00 | | 0107 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 650.00 | 1,300.00 | 875.00 | 1,750.00 | 700.00 | 1,400.00 | | 0108 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 1,250.00 | 5,000.00 | 1,700.00 | 6,800.00 | 1,500.00 | 6,000.00 | | 0109 | 736-01-00100 | Trenching and Backfilling | 48 | LNFT | 5.00 | 240.00 | 10.00 | 480.00 | 27.00 | 1,296.00 | | 0110 | 736-03-00100 | Jacking or Boring for Conduit | 242 | LNFT | 21.00 | 5,082.00 | 22.00 | 5,324.00 | 27.00 | 6,534.00 | | 0111 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 1,600.00 | 1,600.00 | 1,800.00 | 1,800.00 | 3,500.00 | 3,500.00 | | 0112 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 1 | EACH | 1,200.00 | 1,200.00 | 1,300.00 | 1,300.00 | 1,500.00 | 1,500.00 | | 0113 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 1 | EACH | 1,400.00 | 1,400.00 | 1,600.00 | 1,600.00 | 1,900.00 | 1,900.00 | | 0114 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | 2,300.00 | 2,300.00 | | 0115 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 305 | LNFT | 12.00 | 3,660.00 | 13.00 | 3,965.00 | 15.00 | 4,575.00 | | 0116 | 736-12-02014 | Conductor (2c, #14 awg) | 205 | LNFT | 4.00 | 820.00 | 4.00 | 820.00 | 4.00 | 820.00 | | 0117 | 736-12-06014 | Conductor (6c, #14 awg) | 205 | LNFT | 5.00 | 1,025.00 | 5.00 | 1,025.00 | 5.00 | 1,025.00 | | 0118 | 736-12-10014 | Conductor (10c, #14 awg) | 285 | LNFT | 6.00 | 1,710.00 | 7.00 | 1,995.00 | 6.00 | 1,710.00 | | 0119 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 1,100.00 | 2,200.00 | 1,000.00 | 2,000.00 | 1,500.00 | 3,000.00 | | 0120 | 739-01-00100 | Hydro-Seeding | 9.8 | ACRE | 2,600.00 | 25,480.00 | 2,700.00 | 26,460.00 | 3,500.00 | 34,300.00 | | 0121 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,600,000.00 | 7,600,000.00 | 2,000,000.00 | 2,000,000.00 | 3,000,000.00 | 3,000,000.00 | | 0122 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 2,095,000.00 | 2,095,000.00 | 100,000.00 | 100,000.00 | 1,500,000.00 | 1,500,000.00 | | 0123 | 804-01-00400 | Precast Concrete Piles (18") | 45,217 | LNFT | 125.00 | 5,652,125.00 | 95.00 | 4,295,615.00 | 146.00 | 6,601,682.00 | | 0124 | 804-01-00600 | Precast Concrete Piles (24") | 13,458 | LNFT | 500.00 | 6,729,000.00 | 185.00 | 2,489,730.00 | 280.00 | 3,768,240.00 | | 0125 | 804-05-00400 | Precast Concrete Test Piles (18") | 3 | EACH | 50,000.00 | 150,000.00 | 35,000.00 | 105,000.00 | 150,000.00 | 450,000.00 | | 0126 | 804-09-00400 | Static Load Test (Precast Concrete Piles (18")) | 3 | EACH | 100,000.00 | 300,000.00 | 90,000.00 | 270,000.00 | 150,000.00 | 450,000.00 | | 0127 | 804-10-00400 | Precast Concrete Indicator Piles (18") | 2 | EACH | 50,000.00 | 100,000.00 | 65,000.00 | 130,000.00 | 125,000.00 | 250,000.00 | | 0128 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 2 | EACH | 75,000.00 | 150,000.00 | 180,000.00 | 360,000.00 | 150,000.00 | 300,000.00 | | 0129 | 804-14-00100 | Dynamic Monitoring Assistance | 14 | EACH | 5,000.00 | 70,000.00 | 7,000.00 | 98,000.00 | 15,000.00 | 210,000.00 | | 0130 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 1,000,000.00 | 1,000,000.00 | | 0131 | 804-18-00100 | Vibration Monitoring | 365 | DAY | 1,250.00 | 456,250.00 | 800.00 | 292,000.00 | 1,100.00 | 401,500.00 | | 0132 | 805-01-00100 | Class A1 Concrete (Slab Span) | 1,013 | CUYD | 1,000.00 | 1,013,000.00 | 2,000.00 | 2,026,000.00 | 1,600.00 | 1,620,800.00 | | 0133 | 805-01-00200 | Class A1 Concrete (Deck) | 5,038 | CUYD | 1,200.00 | 6,045,600.00 | 2,000.00 | 10,076,000.00 | 1,800.00 | 9,068,400.00 | | 0134 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 547 | CUYD | 2,800.00 | 1,531,600.00 | 2,650.00 | 1,449,550.00 | 3,000.00 | 1,641,000.00 | | 0135 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 1,955 | CUYD | 2,250.00 | 4,398,750.00 | 2,275.00 | 4,447,625.00 | 4,000.00 | 7,820,000.00 | | 0136 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 928 | CUYD | 2,000.00 | 1,856,000.00 | 2,950.00 | 2,737,600.00 | 4,000.00 | 3,712,000.00 | | 0137 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 2,064 | CUYD | 5,000.00 | 10,320,000.00 | 3,500.00 | 7,224,000.00 | 4,000.00 | 8,256,000.00 | | 0138 | 805-08-01500 | Precast-Prestressed Concrete Girders (Type LG-63) | 17,576 | LNFT | 500.00 | 8,788,000.00 | 730.00 | 12,830,480.00 | 510.00 | 8,963,760.00 | | 0139 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 78,529 | SQFT | 3.00 | 235,587.00 | 2.00 | 157,058.00 | 4.00 | 314,116.00 | | 0140 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 232,730 | SQFT | 3.00 | 698,190.00 | 2.00 | 465,460.00 | 1.75 | 407,277.50 | | 0141 | 806-01-00100 | Deformed Reinforcing Steel | 2,266,873 | LB | 2.30 | 5,213,807.90 | 1.90 | 4,307,058.70 | 2.00 | 4,533,746.00 | | 0142 | 807-01-00100 | Structural Metalwork (Grade 36) | 2,427 | LUMP | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 100,000.00 | 100,000.00 | | 0143 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 603 | LUMP | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 110,000.00 | 110,000.00 | | 0144 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 910 | LNFT | 80.00 | 72,800.00 | 175.00 | 159,250.00 | 200.00 | 182,000.00 | | 0145 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 3,520 | LNFT | 80.00 | 281,600.00 | 175.00 | 616,000.00 | 200.00 | 704,000.00 | | 0146 | 810-01-00300 | Concrete Bridge Railing (Double Face) | 2,215 | LNFT | 115.00 | 254,725.00 | 315.00 | 697,725.00 | 525.00 | 1,162,875.00 | | 0147 | 810-03-00100 | Concrete and Metal Bridge Railing | 2,215 | LNFT | 200.00 | 443,000.00 | 440.00 | 974,600.00 | 475.00 | 1,052,125.00 | | 0148 | 810-05-00120 | Concrete Roadway Barrier (36 inch Height) | 394 | LNFT | 220.00 | 86,680.00 | 600.00 | 236,400.00 | 625.00 | 246,250.00 | | 0149 | 810-05-00130 | Concrete Roadway Barrier (42 inch Height) | 480 | LNFT | 315.00 | 151,200.00 | 725.00 | 348,000.00 | 785.00 | 376,800.00 | | 0150 | 810-05-00140 | Concrete Roadway Barrier (54 inch Height) | 302 | LNFT | 340.00 | 102,680.00 | 850.00 | 256,700.00 | 900.00 | 271,800.00 | | 0151 | 810-05-00330 | Concrete Roadway Barrier (Double Face) (42 inch Height) | 184 | LNFT | 236.00 | 43,424.00 | 900.00 | 165,600.00 | 900.00 | 165,600.00 | | 0152 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 7,070 | SQFT | 60.00 | 424,200.00 | 185.00 | 1,307,950.00 | 125.00 | 883,750.00 | | 0153 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 807 | SFIN | 80.00 | 64,560.00 | 115.00 | 92,805.00 | 125.00 | 100,875.00 | | 0154 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 2,647 | SFIN | 150.00 | 397,050.00 | 110.00 | 291,170.00 | 125.00 | 330,875.00 | | 0155 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 510 | LNFT | 355.00 | 181,050.00 | 730.00 | 372,300.00 | 800.00 | 408,000.00 | | 0156 | 815-03-00300 | Joint Seal (Poured) | 1,102 | LNFT | 40.00 | 44,080.00 | 12.00 | 13,224.00 | 12.00 | 13,224.00 | | 0157 | 818-01-00100 | Pier Protection System (Marine) (3-50' Diameter Dolphins) | 1 | LUMP | 5,000,000.00 | 5,000,000.00 | 8,100,000.00 | 8,100,000.00 | 6,000,000.00 | 6,000,000.00 | | 0158 | 818-02-00100 | UHMW-PE Panels | 1,440 | SQFT | 90.00 | 129,600.00 | 90.00 | 129,600.00 | 125.00 | 180,000.00 | | 0159 | 822-01-00100 | Trenching and Backfilling | 2,570 | LNFT | 15.00 | 38,550.00 | 10.00 | 25,700.00 | 12.00 | 30,840.00 | | 0160 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (2#6, 1#6 Bare Stranded Ground)(H) | 3,640 | LNFT | 10.00 | 36,400.00 | 10.00 | 36,400.00 | 12.00 | 43,680.00 | | 0161 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2#4, 2#6, 1#4 Bare Stranded Ground)(F) | 260 | LNFT | 18.00 | 4,680.00 | 20.00 | 5,200.00 | 26.00 | 6,760.00 | | 0162 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (3#1/0, 1#1/0 Bare Stranded Ground)(C) | 90 | LNFT | 29.00 | 2,610.00 | 30.00 | 2,700.00 | 42.00 | 3,780.00 | | 0163 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (3#2, 1#2 Bare Stranded Ground)(G) | 2,900 | LNFT | 37.00 | 107,300.00 | 40.00 | 116,000.00 | 28.00 | 81,200.00 | | 0164 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (2#4, 2#6, 1#4 Bare Stranded Ground)(E) | 40 | LNFT | 58.00 | 2,320.00 | 65.00 | 2,600.00 | 135.00 | 5,400.00 | | 0165 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (3#1/0, 1#1/0 Bare Stranded Ground)(B) | 40 | LNFT | 66.00 | 2,640.00 | 75.00 | 3,000.00 | 145.00 | 5,800.00 | | 0166 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (3#2, 1#2 Bare Stranded Ground)(D) | 20 | LNFT | 61.00 | 1,220.00 | 70.00 | 1,400.00 | 135.00 | 2,700.00 | | 0167 | 822-02-07900 | Conduit w Conductors (PVC Coated Rigid Steel)(2")(3#1/0)(A) | 50 | LNFT | 75.00 | 3,750.00 | 85.00 | 4,250.00 | 120.00 | 6,000.00 | | 0168 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) | 1,820 | LNFT | 29.00 | 52,780.00 | 33.00 | 60,060.00 | 40.00 | 72,800.00 | | 0169 | 822-05-02100 | Light Pole (36.5')(Steel)(Single Arm)(6' Arm)(Ground) | 18 | EACH | 7,500.00 | 135,000.00 | 8,500.00 | 153,000.00 | 7,000.00 | 126,000.00 | | 0170 | 822-05-02100 | Light Pole (36.5')(Steel)(Twin Arm)(6' Arm)(Ground) | 9 | EACH | 8,000.00 | 72,000.00 | 9,000.00 | 81,000.00 | 7,500.00 | 67,500.00 | | 0171 | 822-05-02100 | Light Pole (38')(Steel)(Twin Arm)(6' Arm)(Median Barrier) | 18 | EACH | 7,500.00 | 135,000.00 | 8,500.00 | 153,000.00 | 7,800.00 | 140,400.00 | | 0172 | 822-07-02800 | Luminaire (Lowmast)(LED)(4K) | 72 | EACH | 900.00 | 64,800.00 | 1,000.00 | 72,000.00 | 1,000.00 | 72,000.00 | | 0173 | 822-08-00200 | Electrical Service Point (Structure) | 2 | EACH | 35,000.00 | 70,000.00 | 39,000.00 | 78,000.00 | 50,000.00 | 100,000.00 | | 0174 | 822-09-00100 | Electrical System (Navigation Lighting) | 1 | LUMP | 190,000.00 | 190,000.00 | 215,000.00 | 215,000.00 | 225,000.00 | 225,000.00 | | 0175 | 822-09-00100 | Electrical System (RR At-Grade Crossing Warning System, Power Switching System) | 1 | LUMP | 1,800,000.00 | 1,800,000.00 | 2,000,000.00 | 2,000,000.00 | 225,000.00 | 225,000.00 | | 0176 | 822-16-00200 | Underground Junction Box (11" x 18") (JB2) | 27 | EACH | 1,000.00 | 27,000.00 | 1,100.00 | 29,700.00 | 1,500.00 | 40,500.00 | | 0177 | 822-16-00200 | Underground Junction Box (11" x 18") (JBM) | 19 | EACH | 1,800.00 | 34,200.00 | 1,900.00 | 36,100.00 | 1,900.00 | 36,100.00 | | 0178 | 822-16-00300 | Underground Junction Box (13" x 24") (JB3) | 32 | EACH | 1,111.00 | 35,552.00 | 1,200.00 | 38,400.00 | 1,800.00 | 57,600.00 | | 0179 | 822-18-00100 | Service Pole | 2 | EACH | 4,400.00 | 8,800.00 | 5,000.00 | 10,000.00 | 2,000.00 | 4,000.00 | | 0180 | 822-19-00100 | Modular Breakaway Cable System | 27 | EACH | 2,900.00 | 78,300.00 | 3,300.00 | 89,100.00 | 2,500.00 | 67,500.00 | | 0181 | 822-20-00100 | Disconnect (Service) (Fused) | 2 | EACH | 6,100.00 | 12,200.00 | 7,000.00 | 14,000.00 | 25,000.00 | 50,000.00 | | 0182 | 822-20-00100 | Disconnect (Service) (Non-Fused) | 2 | EACH | 5,500.00 | 11,000.00 | 6,200.00 | 12,400.00 | 10,000.00 | 20,000.00 | | 0183 | 822-21-00100 | Duct Marker (Concrete) | 20 | EACH | 645.00 | 12,900.00 | 700.00 | 14,000.00 | 500.00 | 10,000.00 | | 0184 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 2,570 | LNFT | 0.60 | 1,542.00 | 0.65 | 1,670.50 | 1.00 | 2,570.00 | | 0185 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 883 | INLF | 0.80 | 706.40 | 1.30 | 1,147.90 | 5.00 | 4,415.00 | | 0186 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 13,478 | INLF | 1.00 | 13,478.00 | 1.75 | 23,586.50 | 2.00 | 26,956.00 | | 0187 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 2 | EACH | 55,000.00 | 110,000.00 | 65,000.00 | 130,000.00 | 60,000.00 | 120,000.00 | | 0188 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 2 | EACH | 1,133.00 | 2,266.00 | 1,300.00 | 2,600.00 | 1,200.00 | 2,400.00 | | 0189 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,100.00 | 5,100.00 | 5,500.00 | 5,500.00 | 4,600.00 | 4,600.00 | | 0190 | NS-822-00110 | Light Pole Foundation (8.5' Length) | 27 | EACH | 4,000.00 | 108,000.00 | 4,500.00 | 121,500.00 | 4,000.00 | 108,000.00 | | 0191 | TS-601-00800 | Pre-Cast Concrete Panel Railway-Highway Grade Crossing | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 2,550,000.00 | 2,550,000.00 | 2,250,000.00 | 2,250,000.00 | | 0192 | TS-741-60035 | Insertion Gate Valve | 1 | EACH | 17,250.00 | 17,250.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 101,710,925.30 | | 105,775,843.20 | | 116,574,387.20 |
|