Proposal:H.012863.6
Parish:St. Martin
Description:CYPRESS ISLAND HWY PAVEMENT PRESERVATION
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,505,477.20
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $1,657,194.17 |
| 2 | 34356 | Prairie Contractors LLC | $1,695,044.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 1,291.9 | SQYD | 25.00 | 32,297.50 | 42.50 | 54,905.75 | | 0002 | 202-02-14500 | Removal of Guard Rail | 229 | LNFT | 32.00 | 7,328.00 | 20.00 | 4,580.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 131 | CUYD | 60.00 | 7,860.00 | 200.00 | 26,200.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 225.00 | 4,500.00 | 225.00 | 4,500.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 28,638 | LNFT | 1.00 | 28,638.00 | 1.10 | 31,501.80 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 101 | CUYD | 185.00 | 18,685.00 | 200.00 | 20,200.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 135.00 | 13,500.00 | 150.00 | 15,000.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 4,241.9 | TON | 135.00 | 572,656.50 | 136.00 | 576,898.40 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 257.9 | TON | 200.00 | 51,580.00 | 245.00 | 63,185.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 38,589 | SQYD | 2.75 | 106,119.75 | 3.00 | 115,767.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,030 | SQYD | 135.00 | 409,050.00 | 170.00 | 515,100.00 | | 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 120 | LNFT | 70.00 | 8,400.00 | 90.00 | 10,800.00 | | 0013 | 704-03-00100 | Blocked Out Guard rail | 43.8 | LNFT | 40.00 | 1,752.00 | 65.00 | 2,847.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 218.8 | LNFT | 40.00 | 8,752.00 | 45.00 | 9,846.00 | | 0015 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 9.9 | LNFT | 198.00 | 1,960.20 | 250.00 | 2,475.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 138.00 | 13,800.00 | 130.00 | 13,000.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,370.00 | 13,110.00 | 4,500.00 | 13,500.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 5,000.00 | 5,000.00 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.424 | MILE | 1,265.00 | 6,861.36 | 1.00 | 5.42 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.848 | MILE | 1,785.00 | 19,363.68 | 1.00 | 10.85 | | 0021 | 724-01-00100 | Rumble Strips (Centerline) | 3 | MILE | 1,095.00 | 3,285.00 | 1,200.00 | 3,600.00 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.424 | MILE | 1,095.00 | 5,939.28 | 1,200.00 | 6,508.80 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 65.00 | 780.00 | 125.00 | 1,500.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 150.00 | 600.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 613 | EACH | 13.00 | 7,969.00 | 9.00 | 5,517.00 | | 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 35.00 | 420.00 | 40.00 | 480.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.038 | MILE | 7,150.00 | 71,771.70 | 5,000.00 | 50,190.00 | | 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.947 | MILE | 4,600.00 | 4,356.20 | 1,500.00 | 1,420.50 | | 0030 | 735-01-00100 | Mailboxes | 89 | EACH | 23.00 | 2,047.00 | 25.00 | 2,225.00 | | 0031 | 735-02-00100 | Mailbox Supports (Single) | 89 | EACH | 288.00 | 25,632.00 | 300.00 | 26,700.00 | | 0032 | 739-01-00100 | Hydro-Seeding | 1.96 | ACRE | 4,000.00 | 7,840.00 | 3,000.00 | 5,880.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 100.00 | 100.00 | | 0034 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 100 | INLF | 5.00 | 500.00 | 50.00 | 5,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,657,194.17 | | 1,695,044.02 |
|