Proposal:H.014370.6
Parish:Calcasieu
Description:POST OAK ROAD: BURTON TO AUBRIANNA
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$3,100,642.20
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $4,143,343.92 |
| 2 | 14648 | McManus Construction, LLC | $4,441,851.21 |
| 3 | 27239 | Apeck Construction, LLC | $4,849,214.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - McManus Construction, LLC | - 3 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03030 | Removal of Pavement Structure | 17,820.2 | SQYD | 18.00 | 320,763.60 | 40.00 | 712,808.00 | 24.14 | 430,179.63 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 540 | SQYD | 55.00 | 29,700.00 | 40.00 | 21,600.00 | 117.67 | 63,541.80 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 254 | CUYD | 45.00 | 11,430.00 | 34.00 | 8,636.00 | 84.58 | 21,483.32 | | 0004 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 19,062 | SQYD | 80.00 | 1,524,960.00 | 49.00 | 934,038.00 | 92.70 | 1,767,047.40 | | 0005 | 304-01-00100 | Lime | 100.1 | TON | 350.00 | 35,035.00 | 300.00 | 30,030.00 | 503.06 | 50,356.31 | | 0006 | 304-05-00100 | Lime Treatment (Type E) | 9,531 | SQYD | 5.50 | 52,420.50 | 9.00 | 85,779.00 | 10.12 | 96,453.72 | | 0007 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 165 | CUYD | 75.00 | 12,375.00 | 130.00 | 21,450.00 | 381.58 | 62,960.70 | | 0008 | 502-01-00100 | Asphalt Concrete | 7,087.2 | TON | 140.00 | 992,208.00 | 148.00 | 1,048,905.60 | 167.79 | 1,189,161.29 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 997 | TON | 225.00 | 224,325.00 | 300.00 | 299,100.00 | 179.50 | 178,961.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 11,024 | SQYD | 5.00 | 55,120.00 | 5.00 | 55,120.00 | 5.20 | 57,324.80 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -468 | CUYD | 0.01 | -4.68 | 0.01 | -4.68 | 0.01 | -4.68 | | 0012 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 154 | SQYD | 250.00 | 38,500.00 | 138.00 | 21,252.00 | 156.09 | 24,037.86 | | 0013 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 21 | EACH | 1,000.00 | 21,000.00 | 1,500.00 | 31,500.00 | 1,437.30 | 30,183.30 | | 0014 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 7,000.00 | 7,000.00 | 3,000.00 | 3,000.00 | 9,557.17 | 9,557.17 | | 0015 | 703-03-00100 | Perforated Pipe Underdrains | 10,142 | LNFT | 25.00 | 253,550.00 | 44.00 | 446,248.00 | 38.76 | 393,103.92 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 58,705.17 | 58,705.17 | | 0017 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.753 | MILE | 2,000.00 | 3,506.00 | 26,400.00 | 46,279.20 | 11,239.32 | 19,702.53 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 255,000.00 | 255,000.00 | 400,000.00 | 400,000.00 | 188,179.76 | 188,179.76 | | 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 855 | EACH | 12.00 | 10,260.00 | 10.00 | 8,550.00 | 10.41 | 8,900.55 | | 0020 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 356 | LNFT | 6.00 | 2,136.00 | 5.00 | 1,780.00 | 5.20 | 1,851.20 | | 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 801 | LNFT | 25.00 | 20,025.00 | 22.00 | 17,622.00 | 24.71 | 19,792.71 | | 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.377 | MILE | 7,000.00 | 44,639.00 | 6,009.00 | 38,319.39 | 6,799.49 | 43,360.35 | | 0023 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.189 | MILE | 3,500.00 | 661.50 | 2,875.00 | 543.38 | 3,268.99 | 617.84 | | 0024 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.159 | MILE | 25,000.00 | 3,975.00 | 17,882.50 | 2,843.32 | 20,353.46 | 3,236.20 | | 0025 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 600.00 | 4,200.00 | 460.00 | 3,220.00 | 520.29 | 3,642.03 | | 0026 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,800.00 | 3,600.00 | 1,500.00 | 3,000.00 | 1,690.95 | 3,381.90 | | 0027 | 735-01-00100 | Mailboxes | 80 | EACH | 25.00 | 2,000.00 | 300.00 | 24,000.00 | 1.30 | 104.00 | | 0028 | 735-02-00100 | Mailbox Supports (Single) | 53 | EACH | 350.00 | 18,550.00 | 150.00 | 7,950.00 | 338.19 | 17,924.07 | | 0029 | 735-03-00100 | Mailbox Supports (Double) | 7 | EACH | 375.00 | 2,625.00 | 150.00 | 1,050.00 | 377.21 | 2,640.47 | | 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 59,061.25 | 59,061.25 | | 0032 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,496 | INLF | 3.50 | 8,736.00 | 4.00 | 9,984.00 | 1.13 | 2,820.48 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 14,562 | INLF | 4.00 | 58,248.00 | 4.00 | 58,248.00 | 1.43 | 20,823.66 | | 0034 | 741-35-00100 | Adjust Valve or Meter Box | 14 | EACH | 1,200.00 | 16,800.00 | 1,000.00 | 14,000.00 | 1,437.30 | 20,122.20 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,143,343.92 | | 4,441,851.21 | | 4,849,214.41 |
|