Proposal:H.013516.6
Parish:Lafayette, St. Martin
Routes:LA 353
Description:LA 353: LA 94 TO CYPRESS ISLAND HWY
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,671,816.70
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $11,201,521.25 |
| 2 | 33663 | Glenn Lege Construction LLC | $12,846,971.99 |
| 3 | 51821 | Elliott Construction, LLC | $16,516,794.33 |
| 4 | 06276 | Barriere Construction Co., LLC | $19,855,313.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | - 3 - Elliott Construction, LLC | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 3,196 | SQYD | 19.00 | 60,724.00 | 9.45 | 30,202.20 | 25.00 | 79,900.00 | 9.00 | 28,764.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,346.9 | SQYD | 15.00 | 20,203.50 | 11.22 | 15,112.22 | 25.00 | 33,672.50 | 31.25 | 42,090.63 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 16.5 | SQYD | 200.00 | 3,300.00 | 338.58 | 5,586.57 | 105.00 | 1,732.50 | 637.00 | 10,510.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 863.6 | SQYD | 28.00 | 24,180.80 | 19.39 | 16,745.20 | 35.00 | 30,226.00 | 26.75 | 23,101.30 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,185 | LNFT | 20.00 | 23,700.00 | 16.65 | 19,730.25 | 20.00 | 23,700.00 | 9.25 | 10,961.25 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" CMP | 140 | LNFT | 200.00 | 28,000.00 | 105.63 | 14,788.20 | 75.00 | 10,500.00 | 86.75 | 12,145.00 | | 0007 | 202-02-38200 | Removal of Signs | 34 | EACH | 30.00 | 1,020.00 | 83.24 | 2,830.16 | 200.00 | 6,800.00 | 19.00 | 646.00 | | 0008 | 202-02-38220 | Removal of Sign Supports | 31 | EACH | 35.00 | 1,085.00 | 83.24 | 2,580.44 | 285.00 | 8,835.00 | 159.00 | 4,929.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 850,000.00 | 850,000.00 | 729,606.17 | 729,606.17 | 1,500,000.00 | 1,500,000.00 | 2,500,000.00 | 2,500,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 74 | EACH | 175.00 | 12,950.00 | 166.49 | 12,320.26 | 215.00 | 15,910.00 | 191.00 | 14,134.00 | | 0011 | 302-02-04000 | Class II Base Course (4" Thick) | 98,401.3 | SQYD | 17.75 | 1,746,623.08 | 17.17 | 1,689,550.32 | 25.00 | 2,460,032.50 | 34.00 | 3,345,644.20 | | 0012 | 302-03-00100 | Base Drain Outlet | 296 | EACH | 800.00 | 236,800.00 | 241.76 | 71,560.96 | 2,500.00 | 740,000.00 | 240.00 | 71,040.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,173 | CUYD | 110.00 | 569,030.00 | 97.15 | 502,556.95 | 135.00 | 698,355.00 | 59.00 | 305,207.00 | | 0014 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 85.00 | 8,500.00 | 378.86 | 37,886.00 | 65.00 | 6,500.00 | 448.00 | 44,800.00 | | 0015 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 900 | CUYD | 85.00 | 76,500.00 | 106.38 | 95,742.00 | 65.00 | 58,500.00 | 184.00 | 165,600.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 37,781.5 | TON | 111.00 | 4,193,746.50 | 133.12 | 5,029,473.28 | 140.00 | 5,289,410.00 | 170.00 | 6,422,855.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,124.1 | TON | 111.00 | 346,775.10 | 164.72 | 514,601.75 | 185.00 | 577,958.50 | 260.00 | 812,266.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 101,130 | SQYD | 2.50 | 252,825.00 | 3.91 | 395,418.30 | 3.00 | 303,390.00 | 3.75 | 379,237.50 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,213 | CUYD | 0.01 | -42.13 | 0.12 | -505.56 | 0.01 | -42.13 | 0.01 | -42.13 | | 0020 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,750 | SQYD | 134.00 | 770,500.00 | 158.66 | 912,295.00 | 200.00 | 1,150,000.00 | 245.00 | 1,408,750.00 | | 0021 | 510-02-00100 | Pavement Widening 24" Minimum Thickness | 46 | SQYD | 320.00 | 14,720.00 | 366.76 | 16,870.96 | 400.00 | 18,400.00 | 577.00 | 26,542.00 | | 0022 | 601-01-01300 | Portland Cement Concrete Pavement (14" Thick) | 32.3 | SQYD | 300.00 | 9,690.00 | 362.64 | 11,713.27 | 395.00 | 12,758.50 | 99.00 | 3,197.70 | | 0023 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 8 | LNFT | 240.00 | 1,920.00 | 585.14 | 4,681.12 | 500.00 | 4,000.00 | 355.00 | 2,840.00 | | 0024 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 136 | LNFT | 400.00 | 54,400.00 | 765.10 | 104,053.60 | 325.00 | 44,200.00 | 242.00 | 32,912.00 | | 0025 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 104 | LNFT | 500.00 | 52,000.00 | 995.72 | 103,554.88 | 350.00 | 36,400.00 | 266.00 | 27,664.00 | | 0026 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 56 | LNFT | 525.00 | 29,400.00 | 1,016.14 | 56,903.84 | 375.00 | 21,000.00 | 298.00 | 16,688.00 | | 0027 | 701-15-00100 | Concrete Collar | 41 | EACH | 1,600.00 | 65,600.00 | 2,922.91 | 119,839.31 | 4,050.00 | 166,050.00 | 2,995.00 | 122,795.00 | | 0028 | 701-16-02020 | Plastic Pipe (Extension) (18" CPEPDW) | 48 | LNFT | 400.00 | 19,200.00 | 482.91 | 23,179.68 | 275.00 | 13,200.00 | 123.00 | 5,904.00 | | 0029 | 701-16-02040 | Plastic Pipe (Extension) (24" CPEPDW) | 24 | LNFT | 475.00 | 11,400.00 | 852.66 | 20,463.84 | 400.00 | 9,600.00 | 305.00 | 7,320.00 | | 0030 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 84 | LNFT | 15.00 | 1,260.00 | 562.65 | 47,262.60 | 20.00 | 1,680.00 | 100.00 | 8,400.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 8,500.00 | 8,500.00 | 10,406.93 | 10,406.93 | 5,950.00 | 5,950.00 | 7,710.00 | 7,710.00 | | 0032 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 762.5 | LNFT | 200.00 | 152,500.00 | 194.23 | 148,100.38 | 185.00 | 141,062.50 | 210.00 | 160,125.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 175 | LNFT | 40.00 | 7,000.00 | 38.85 | 6,798.75 | 45.00 | 7,875.00 | 47.00 | 8,225.00 | | 0034 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 3 | EACH | 4,500.00 | 13,500.00 | 4,439.60 | 13,318.80 | 2,750.00 | 8,250.00 | 3,186.00 | 9,558.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 5 | EACH | 4,750.00 | 23,750.00 | 4,717.08 | 23,585.40 | 4,250.00 | 21,250.00 | 4,907.00 | 24,535.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 863.6 | SQYD | 125.00 | 107,950.00 | 74.03 | 63,932.31 | 110.00 | 94,996.00 | 140.00 | 120,904.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 73,195.69 | 73,195.69 | 300,000.00 | 300,000.00 | 1,029,780.00 | 1,029,780.00 | | 0038 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 200 | LNFT | 0.01 | 2.00 | 6.67 | 1,334.00 | 7.00 | 1,400.00 | 0.75 | 150.00 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.815 | MILE | 500.00 | 13,907.50 | 363.24 | 10,103.52 | 700.00 | 19,470.50 | 166.00 | 4,617.29 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 27.815 | MILE | 1.00 | 27.82 | 2,053.32 | 57,113.10 | 2,050.00 | 57,020.75 | 892.00 | 24,810.98 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 87.375 | MILE | 1.00 | 87.38 | 2,108.81 | 184,257.27 | 2,100.00 | 183,487.50 | 1,401.00 | 122,412.38 | | 0042 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 20,000.00 | 80,000.00 | 60,540.00 | 242,160.00 | 12,000.00 | 48,000.00 | 20,000.00 | 80,000.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 19,978.20 | 19,978.20 | 25,000.00 | 25,000.00 | 18,500.00 | 18,500.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 6.562 | MILE | 950.00 | 6,233.90 | 943.42 | 6,190.72 | 950.00 | 6,233.90 | 337.00 | 2,211.39 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 13.124 | MILE | 950.00 | 12,467.80 | 943.42 | 12,381.44 | 950.00 | 12,467.80 | 337.00 | 4,422.79 | | 0046 | 726-01-00100 | Bedding Material | 49.4 | CUYD | 150.00 | 7,410.00 | 200.47 | 9,903.22 | 150.00 | 7,410.00 | 280.00 | 13,832.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 521,915.34 | 521,915.34 | 1,500,000.00 | 1,500,000.00 | 1,589,000.00 | 1,589,000.00 | | 0048 | 729-01-00100 | Sign (Type A) | 167.5 | SQFT | 50.00 | 8,375.00 | 37.18 | 6,227.65 | 40.00 | 6,700.00 | 44.00 | 7,370.00 | | 0049 | 729-16-00200 | Object Marker Assembly (Type 2) | 52 | EACH | 85.00 | 4,420.00 | 110.99 | 5,771.48 | 65.00 | 3,380.00 | 70.00 | 3,640.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 120.00 | 1,440.00 | 122.09 | 1,465.08 | 105.00 | 1,260.00 | 121.00 | 1,452.00 | | 0051 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 23 | EACH | 275.00 | 6,325.00 | 138.74 | 3,191.02 | 235.00 | 5,405.00 | 267.00 | 6,141.00 | | 0052 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,019 | EACH | 10.00 | 10,190.00 | 11.10 | 11,310.90 | 11.00 | 11,209.00 | 10.00 | 10,190.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 35.00 | 1,400.00 | 27.75 | 1,110.00 | 28.00 | 1,120.00 | 37.00 | 1,480.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.475 | MILE | 5,500.00 | 96,112.50 | 6,881.38 | 120,252.12 | 6,825.00 | 119,266.88 | 6,250.00 | 109,218.75 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.563 | MILE | 1,300.00 | 7,231.90 | 3,995.64 | 22,227.75 | 3,975.00 | 22,112.93 | 1,401.00 | 7,793.76 | | 0056 | 735-01-00100 | Mailboxes | 56 | EACH | 25.00 | 1,400.00 | 16.65 | 932.40 | 25.00 | 1,400.00 | 25.50 | 1,428.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 56 | EACH | 300.00 | 16,800.00 | 305.22 | 17,092.32 | 275.00 | 15,400.00 | 318.00 | 17,808.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 23.88 | ACRE | 2,650.00 | 63,282.00 | 2,774.75 | 66,261.03 | 3,115.00 | 74,386.20 | 3,187.00 | 76,105.56 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 36,324.00 | 36,324.00 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0060 | 805-15-01400 | Reinforced Concrete Box Culverts (Precast) (8' x 6') | 84 | LNFT | 2,500.00 | 210,000.00 | 2,225.98 | 186,982.32 | 2,800.00 | 235,200.00 | 2,860.00 | 240,240.00 | | 0061 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Steel = 1,575 LBS
Concrete = 22 CUYD | 2 | EACH | 35,000.00 | 70,000.00 | 68,564.28 | 137,128.56 | 50,000.00 | 100,000.00 | 53,526.00 | 107,052.00 | | 0062 | 812-01-00200 | Treated Timber (Coastal Treatment) | 4 | MFBM | 12,000.00 | 48,000.00 | 8,251.10 | 33,004.40 | 5,000.00 | 20,000.00 | 14,700.00 | 58,800.00 | | 0063 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 572 | LNFT | 6.00 | 3,432.00 | 24.22 | 13,853.84 | 10.00 | 5,720.00 | 32.00 | 18,304.00 | | 0064 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 572 | LNFT | 4.00 | 2,288.00 | 14.53 | 8,311.16 | 6.00 | 3,432.00 | 63.75 | 36,465.00 | | 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 11,304 | INLF | 1.90 | 21,477.60 | 14.53 | 164,247.12 | 2.50 | 28,260.00 | 1.25 | 14,130.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,201,521.25 | | 12,846,971.99 | | 16,516,794.33 | | 19,855,313.85 |
|