Proposal:H.011721.6
Parish:St. Tammany
Routes:LA 22, US 190
Description:US 190/LA 22 IMPROVEMENTS
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$5,645,203.00
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $10,327,935.25 |
| 2 | 06276 | Barriere Construction Co., LLC | $11,953,943.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,000.00 | 35,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 105 | SQYD | 100.00 | 10,500.00 | 130.00 | 13,650.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 9,873 | SQYD | 25.00 | 246,825.00 | 150.00 | 1,480,950.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 2,722 | LNFT | 25.00 | 68,050.00 | 39.00 | 106,158.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 481 | SQYD | 37.00 | 17,797.00 | 14.50 | 6,974.50 | | 0006 | 202-02-26300 | Removal of Median / Island | 100 | SQYD | 100.00 | 10,000.00 | 165.00 | 16,500.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 105 | LNFT | 30.00 | 3,150.00 | 37.00 | 3,885.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" Eq. RCPA | 160 | LNFT | 30.00 | 4,800.00 | 37.00 | 5,920.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 42" Eq. RCPA | 670 | LNFT | 30.00 | 20,100.00 | 37.00 | 24,790.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 28 | EACH | 750.00 | 21,000.00 | 535.00 | 14,980.00 | | 0011 | 202-02-38300 | Removal of Sign and U-Channel Post | 21 | EACH | 50.00 | 1,050.00 | 35.00 | 735.00 | | 0012 | 202-02-38360 | Removal of Sign Faces | 50 | EACH | 50.00 | 2,500.00 | 35.00 | 1,750.00 | | 0013 | 203-01-00100 | General Excavation | 11,016 | CUYD | 65.00 | 716,040.00 | 1.00 | 11,016.00 | | 0014 | 203-03-00100 | Embankment | 16,412 | CUYD | 25.00 | 410,300.00 | 1.00 | 16,412.00 | | 0015 | 203-04-00200 | Nonplastic Embankment (Sand) | 4,717 | CUYD | 125.00 | 589,625.00 | 175.00 | 825,475.00 | | 0016 | 203-08-00100 | Geotextile Fabric | 14,156 | SQYD | 2.50 | 35,390.00 | 2.00 | 28,312.00 | | 0017 | 203-10-00100 | Cleaning Existing Ditches | 700 | LNFT | 15.00 | 10,500.00 | 25.00 | 17,500.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 10 | EACH | 100.00 | 1,000.00 | 40.00 | 400.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 6,418 | LNFT | 3.00 | 19,254.00 | 3.00 | 19,254.00 | | 0020 | 302-02-10075 | Class II Base Course (10" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 14,156 | SQYD | 65.00 | 920,140.00 | 66.00 | 934,296.00 | | 0021 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 120 | SQYD | 150.00 | 18,000.00 | 525.00 | 63,000.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2,000 | CUYD | 125.00 | 250,000.00 | 100.00 | 200,000.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 7,902 | TON | 160.00 | 1,264,320.00 | 205.00 | 1,619,910.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 30 | TON | 700.00 | 21,000.00 | 645.00 | 19,350.00 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 26,038 | SQYD | 7.00 | 182,266.00 | 5.50 | 143,209.00 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,447 | CUYD | 0.25 | -361.75 | 0.01 | -14.47 | | 0027 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 105 | LNFT | 200.00 | 21,000.00 | 300.00 | 31,500.00 | | 0028 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 160 | LNFT | 300.00 | 48,000.00 | 450.00 | 72,000.00 | | 0029 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 670 | LNFT | 500.00 | 335,000.00 | 600.00 | 402,000.00 | | 0030 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 10 | LNFT | 200.00 | 2,000.00 | 420.00 | 4,200.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 8,000.00 | 16,000.00 | 10,500.00 | 21,000.00 | | 0032 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 5,500.00 | 11,000.00 | 11,250.00 | 22,500.00 | | 0033 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 1,200 | LNFT | 100.00 | 120,000.00 | 72.00 | 86,400.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 484 | SQYD | 175.00 | 84,700.00 | 112.00 | 54,208.00 | | 0035 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,337 | SQYD | 110.00 | 147,070.00 | 98.00 | 131,026.00 | | 0036 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,374 | LNFT | 76.00 | 256,424.00 | 56.00 | 188,944.00 | | 0037 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 20 | SQYD | 450.00 | 9,000.00 | 161.00 | 3,220.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 950,000.00 | 950,000.00 | 1,180,000.00 | 1,180,000.00 | | 0039 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 5,173 | LNFT | 0.50 | 2,586.50 | 0.50 | 2,586.50 | | 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,174 | LNFT | 1.50 | 7,761.00 | 1.50 | 7,761.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,594 | LNFT | 3.00 | 4,782.00 | 2.75 | 4,383.50 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.82 | MILE | 1,750.00 | 1,435.00 | 0.01 | 0.01 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.85 | MILE | 3,000.00 | 2,550.00 | 2,750.00 | 2,337.50 | | 0044 | 726-01-00100 | Bedding Material | 188.17 | CUYD | 125.00 | 23,521.25 | 1.50 | 282.26 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,180,000.00 | 1,180,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 60.5 | SQFT | 45.00 | 2,722.50 | 44.00 | 2,662.00 | | 0047 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 307.35 | SQFT | 55.00 | 16,904.25 | 53.00 | 16,289.55 | | 0048 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 140.8 | SQFT | 90.00 | 12,672.00 | 85.00 | 11,968.00 | | 0049 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 361 | SQFT | 70.00 | 25,270.00 | 65.00 | 23,465.00 | | 0050 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 100 | SQFT | 75.00 | 7,500.00 | 70.00 | 7,000.00 | | 0051 | 729-08-00200 | Mounting (3 1/2" Size Post) | 9 | EACH | 2,500.00 | 22,500.00 | 2,125.00 | 19,125.00 | | 0052 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 10 | EACH | 3,000.00 | 30,000.00 | 3,000.00 | 30,000.00 | | 0053 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 1 | EACH | 15,000.00 | 15,000.00 | 16,000.00 | 16,000.00 | | 0054 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 7 | EACH | 350.00 | 2,450.00 | 950.00 | 6,650.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 94 | EACH | 75.00 | 7,050.00 | 70.00 | 6,580.00 | | 0056 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,080 | LNFT | 45.00 | 48,600.00 | 42.00 | 45,360.00 | | 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.59 | MILE | 14,000.00 | 50,260.00 | 13,900.00 | 49,901.00 | | 0058 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 1.18 | MILE | 7,000.00 | 8,260.00 | 6,900.00 | 8,142.00 | | 0059 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.56 | MILE | 14,000.00 | 7,840.00 | 14,000.00 | 7,840.00 | | 0060 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 1,000.00 | 6,000.00 | 1,050.00 | 6,300.00 | | 0061 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 11 | EACH | 1,000.00 | 11,000.00 | 1,050.00 | 11,550.00 | | 0062 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 16 | EACH | 1,000.00 | 16,000.00 | 1,050.00 | 16,800.00 | | 0063 | 736-01-00100 | Trenching and Backfilling | 1,623 | LNFT | 12.50 | 20,287.50 | 15.00 | 24,345.00 | | 0064 | 736-03-00100 | Jacking or Boring | 700 | LNFT | 100.00 | 70,000.00 | 66.00 | 46,200.00 | | 0065 | 736-04-01300 | Signal Pole (30 foot Steel Strain Pole) | 1 | EACH | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0066 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 1 | EACH | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0067 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 32,500.00 | 32,500.00 | 50,500.00 | 50,500.00 | | 0068 | 736-04-25540 | Signal Pole (Dual Mast Arm, 55ft-Arm 1, 40ft-Arm 2) | 2 | EACH | 55,000.00 | 110,000.00 | 83,000.00 | 166,000.00 | | 0069 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 14 | EACH | 2,000.00 | 28,000.00 | 2,750.00 | 38,500.00 | | 0070 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 5 | EACH | 2,000.00 | 10,000.00 | 2,650.00 | 13,250.00 | | 0071 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 2,000.00 | 2,000.00 | 3,150.00 | 3,150.00 | | 0072 | 736-06-00100 | Signal Service | 2 | EACH | 12,000.00 | 24,000.00 | 4,800.00 | 9,600.00 | | 0073 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 5,500.00 | 11,000.00 | 5,200.00 | 10,400.00 | | 0074 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 15,000.00 | 30,000.00 | 13,500.00 | 27,000.00 | | 0075 | 736-09-00100 | Loop Detector | 1,855 | LNFT | 60.00 | 111,300.00 | 45.00 | 83,475.00 | | 0076 | 736-10-00200 | Underground Junction Box (Type E) | 9 | EACH | 3,500.00 | 31,500.00 | 2,500.00 | 22,500.00 | | 0077 | 736-10-00300 | Underground Junction Box (Type F) | 19 | EACH | 3,500.00 | 66,500.00 | 3,400.00 | 64,600.00 | | 0078 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 5,500.00 | 11,000.00 | 5,700.00 | 11,400.00 | | 0079 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 110 | LNFT | 10.00 | 1,100.00 | 22.00 | 2,420.00 | | 0080 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 1,918 | LNFT | 20.00 | 38,360.00 | 22.00 | 42,196.00 | | 0081 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 446 | LNFT | 25.00 | 11,150.00 | 28.00 | 12,488.00 | | 0082 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 2,738 | LNFT | 10.00 | 27,380.00 | 5.00 | 13,690.00 | | 0083 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 264 | LNFT | 10.00 | 2,640.00 | 12.00 | 3,168.00 | | 0084 | 736-12-06014 | Conductor (6c, #14 awg) | 696 | LNFT | 6.00 | 4,176.00 | 5.25 | 3,654.00 | | 0085 | 736-12-10014 | Conductor (10c, #14 awg) | 2,156 | LNFT | 6.00 | 12,936.00 | 5.50 | 11,858.00 | | 0086 | 736-13-00002 | Cable (3/8") | 70 | LNFT | 15.00 | 1,050.00 | 50.00 | 3,500.00 | | 0087 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 3 | EACH | 25,000.00 | 75,000.00 | 17,500.00 | 52,500.00 | | 0088 | 736-15-04200 | Signal Support (Foundation, 42 inch Minimum Diameter) | 2 | EACH | 35,000.00 | 70,000.00 | 26,300.00 | 52,600.00 | | 0089 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 5,000.00 | 10,000.00 | 3,500.00 | 7,000.00 | | 0090 | 740-01-00100 | Construction Layout | 1 | LUMP | 180,000.00 | 180,000.00 | 300,000.00 | 300,000.00 | | 0091 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 17,048 | INLF | 1.50 | 25,572.00 | 1.00 | 17,048.00 | | 0092 | NS-702-00100 | Paved Gutter Drain | 20 | EACH | 5,500.00 | 110,000.00 | 9,700.00 | 194,000.00 | | 0093 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 12,000.00 | 48,000.00 | 16,000.00 | 64,000.00 | | 0094 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 19 | EACH | 1,200.00 | 22,800.00 | 1,200.00 | 22,800.00 | | 0095 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 5 | EACH | 1,000.00 | 5,000.00 | 900.00 | 4,500.00 | | 0096 | NS-736-00001 | GPS | 2 | EACH | 5,000.00 | 10,000.00 | 1,300.00 | 2,600.00 | | 0097 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 40,000.00 | 80,000.00 | 43,000.00 | 86,000.00 | | 0098 | 302-02-05010 | Class II Base Course (5" Thick) (Asphalt Concrete Base) | 14,156 | SQYD | 55.00 | 778,580.00 | 68.00 | 962,608.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,327,935.25 | | 11,953,943.35 |
|