Proposal:H.008449.6
Parish:Washington
Routes:LA 450
Description:DRAIN BRIDGE NEAR STONEY POINT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,405,249.79
| Rank | License | Bidder | Construction Bid |
| 1 | 57931 | KCR CONTRACTORS, LLC | $1,297,706.90 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $1,424,434.01 |
| 3 | 36827 | Shavers-Whittle Construction LLC | $1,722,192.96 |
| 4 | 48896 | Command Construction Industries LLC | $1,724,849.43 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KCR CONTRACTORS, LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - Shavers-Whittle Construction LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.157 | LUMP | 16,600.00 | 16,600.00 | 10,000.00 | 10,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,600.00 | 3,600.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 487 | SQYD | 4.62 | 2,249.94 | 13.00 | 6,331.00 | 32.50 | 15,827.50 | 25.00 | 12,175.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 265.8 | SQYD | 4.62 | 1,228.00 | 25.00 | 6,645.00 | 28.50 | 7,575.30 | 25.00 | 6,645.00 | | 0005 | 202-02-04501 | Removal of Bridge STA. 109+97.35: 58' X 26.4' TREATED TIMBER TRESTLE; 1,531 SF | 1 | LUMP | 13,200.00 | 13,200.00 | 85,000.00 | 85,000.00 | 140,000.00 | 140,000.00 | 100,000.00 | 100,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 334 | LNFT | 9.35 | 3,122.90 | 17.00 | 5,678.00 | 23.50 | 7,849.00 | 25.00 | 8,350.00 | | 0007 | 203-02-00100 | Drainage Excavation | 80 | CUYD | 24.00 | 1,920.00 | 130.00 | 10,400.00 | 65.00 | 5,200.00 | 50.00 | 4,000.00 | | 0008 | 203-04-00100 | Nonplastic Embankment | 1 | CUYD | 120.00 | 120.00 | 45.00 | 45.00 | 250.00 | 250.00 | 500.00 | 500.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 185,000.00 | 185,000.00 | 25,000.00 | 25,000.00 | | 0010 | 203-08-00100 | Geotextile Fabric | 5 | SQYD | 6.00 | 30.00 | 200.00 | 1,000.00 | 12.00 | 60.00 | 5.00 | 25.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 192.50 | 2,310.00 | 225.00 | 2,700.00 | 195.00 | 2,340.00 | 0.01 | 0.12 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 1,202 | LNFT | 2.48 | 2,980.96 | 3.00 | 3,606.00 | 3.50 | 4,207.00 | 0.01 | 12.02 | | 0013 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 466.7 | SQYD | 50.40 | 23,521.68 | 155.00 | 72,338.50 | 48.50 | 22,634.95 | 100.00 | 46,670.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 220.00 | 1,100.00 | 200.00 | 1,000.00 | 95.00 | 475.00 | 250.00 | 1,250.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 249.2 | TON | 467.50 | 116,501.00 | 450.00 | 112,140.00 | 450.00 | 112,140.00 | 550.00 | 137,060.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 103.2 | TON | 313.50 | 32,353.20 | 300.00 | 30,960.00 | 345.00 | 35,604.00 | 250.00 | 25,800.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 1,213 | SQYD | 17.05 | 20,681.65 | 17.50 | 21,227.50 | 18.50 | 22,440.50 | 0.01 | 12.13 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -50.54 | CUYD | 0.11 | -5.56 | 1.00 | -50.54 | 1.50 | -75.81 | 0.01 | -0.51 | | 0019 | 510-02-00100 | Pavement Widening Thickness Varies (See Typical Sheets) | 24.4 | SQYD | 240.00 | 5,856.00 | 400.00 | 9,760.00 | 600.00 | 14,640.00 | 550.00 | 13,420.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 184 | LNFT | 19.57 | 3,600.88 | 75.00 | 13,800.00 | 10.00 | 1,840.00 | 0.01 | 1.84 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 368.75 | LNFT | 41.25 | 15,210.94 | 40.00 | 14,750.00 | 98.00 | 36,137.50 | 50.00 | 18,437.50 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 129.80 | 3,245.00 | 150.00 | 3,750.00 | 165.00 | 4,125.00 | 150.00 | 3,750.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,070.00 | 8,140.00 | 4,500.00 | 9,000.00 | 3,950.00 | 7,900.00 | 2,500.00 | 5,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,498.00 | 3,498.00 | 4,000.00 | 4,000.00 | 3,850.00 | 3,850.00 | 2,500.00 | 2,500.00 | | 0025 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 121 | SQYD | 126.00 | 15,246.00 | 200.00 | 24,200.00 | 195.00 | 23,595.00 | 250.00 | 30,250.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 137 | SQYD | 3.07 | 420.59 | 7.00 | 959.00 | 25.00 | 3,425.00 | 5.00 | 685.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,600.00 | 17,600.00 | 25,000.00 | 25,000.00 | 38,500.00 | 38,500.00 | 50,000.00 | 50,000.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.5 | MILE | 3,850.00 | 1,925.00 | 4,500.00 | 2,250.00 | 4,250.00 | 2,125.00 | 1,000.00 | 500.00 | | 0029 | 720-01-02060 | Erosion Control System, Flexible (Channel Liner) (Type F) | 20 | SQYD | 11.00 | 220.00 | 12.00 | 240.00 | 15.00 | 300.00 | 25.00 | 500.00 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.22 | MILE | 440.00 | 96.80 | 500.00 | 110.00 | 500.00 | 110.00 | 2,500.00 | 550.00 | | 0031 | 726-01-00100 | Bedding Material | 479.76 | CUYD | 141.23 | 67,756.50 | 180.00 | 86,356.80 | 89.50 | 42,938.52 | 50.00 | 23,988.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 104,900.00 | 104,900.00 | 65,000.00 | 65,000.00 | 135,000.00 | 135,000.00 | 150,000.00 | 150,000.00 | | 0033 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 13.5 | SQFT | 33.00 | 445.50 | 35.00 | 472.50 | 30.00 | 405.00 | 50.00 | 675.00 | | 0034 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 1,320.00 | 2,640.00 | 1,500.00 | 3,000.00 | 3,850.00 | 7,700.00 | 2,500.00 | 5,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 82.50 | 330.00 | 95.00 | 380.00 | 105.00 | 420.00 | 250.00 | 1,000.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 29 | EACH | 44.00 | 1,276.00 | 50.00 | 1,450.00 | 50.00 | 1,450.00 | 25.00 | 725.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.432 | MILE | 19,250.00 | 8,316.00 | 18,000.00 | 7,776.00 | 22,100.00 | 9,547.20 | 2,500.00 | 1,080.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 0.59 | ACRE | 3,850.00 | 2,271.50 | 4,000.00 | 2,360.00 | 4,250.00 | 2,507.50 | 2,500.00 | 1,475.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0040 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 184 | LNFT | 3,290.03 | 605,365.52 | 3,200.00 | 588,800.00 | 3,150.00 | 579,600.00 | 4,200.00 | 772,800.00 | | 0041 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Class A1 Concrete: 58.30 Cu Yds
Deformed Reinforcing Steel: 4,748 Lbs | 2 | EACH | 34,980.00 | 69,960.00 | 52,000.00 | 104,000.00 | 30,000.00 | 60,000.00 | 50,000.00 | 100,000.00 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,333 | INLF | 1.30 | 1,732.90 | 2.25 | 2,999.25 | 0.60 | 799.80 | 0.01 | 13.33 | | 0043 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 41,140.00 | 41,140.00 | 40,000.00 | 40,000.00 | 38,750.00 | 38,750.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,297,706.90 | | 1,424,434.01 | | 1,722,192.96 | | 1,724,849.43 |
|