Proposal:H.013955.6
Parish:East Feliciana
Routes:LA 961
Description:LA 961: SANDY CREEK BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, INPLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,486,276.38
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $2,255,649.59 |
| 2 | 36827 | Shavers-Whittle Construction LLC | $2,791,595.25 |
| 3 | 00044 | Guinn Construction, LLC | $2,989,751.40 |
| 4 | 56994 | Matt L. Guinn Construction, LLC | $3,296,359.35 |
| 5 | 00009 | Coastal Contractors, LLC | $3,373,166.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Shavers-Whittle Construction LLC | - 3 - Guinn Construction, LLC | - 4 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.46 | LUMP | 300,000.00 | 300,000.00 | 195,000.00 | 195,000.00 | 80,000.00 | 80,000.00 | 165,000.00 | 165,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,157.4 | SQYD | 4.50 | 5,208.30 | 14.00 | 16,203.60 | 8.00 | 9,259.20 | 28.00 | 32,407.20 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,157.4 | SQYD | 6.50 | 7,523.10 | 22.00 | 25,462.80 | 8.00 | 9,259.20 | 25.00 | 28,935.00 | | 0004 | 202-02-04501 | Removal of Bridge PRECAST CONCRETE 27' W X 76' L WITH TIMBER HEADWALLS) | 2,052 | LUMP | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | 125,000.00 | 125,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 400 | LNFT | 8.00 | 3,200.00 | 12.00 | 4,800.00 | 10.00 | 4,000.00 | 16.00 | 6,400.00 | | 0006 | 203-02-00100 | Drainage Excavation | 715 | CUYD | 12.00 | 8,580.00 | 30.00 | 21,450.00 | 25.00 | 17,875.00 | 45.00 | 32,175.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 135,000.00 | 135,000.00 | 90,000.00 | 90,000.00 | 110,000.00 | 110,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 240.00 | 960.00 | 225.00 | 900.00 | 500.00 | 2,000.00 | 200.00 | 800.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,063 | LNFT | 3.00 | 3,189.00 | 5.00 | 5,315.00 | 4.00 | 4,252.00 | 5.00 | 5,315.00 | | 0010 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 1,098.9 | SQYD | 40.00 | 43,956.00 | 37.00 | 40,659.30 | 100.00 | 109,890.00 | 70.00 | 76,923.00 | | 0011 | 304-01-00100 | Lime | 16.49 | TON | 1.00 | 16.49 | 395.00 | 6,513.55 | 500.00 | 8,245.00 | 400.00 | 6,596.00 | | 0012 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 1,098 | SQYD | 1.00 | 1,098.00 | 34.50 | 37,881.00 | 50.00 | 54,900.00 | 25.00 | 27,450.00 | | 0013 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 1,098 | SQYD | 24.00 | 26,352.00 | 37.00 | 40,626.00 | 60.00 | 65,880.00 | 65.00 | 71,370.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 247.5 | TON | 230.00 | 56,925.00 | 260.00 | 64,350.00 | 275.00 | 68,062.50 | 372.50 | 92,193.75 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40.6 | TON | 390.00 | 15,834.00 | 450.00 | 18,270.00 | 350.00 | 14,210.00 | 875.00 | 35,525.00 | | 0016 | 510-01-00001 | Pavement Patching 14.5" MINIMUM THICKNESS | 80 | SQYD | 390.00 | 31,200.00 | 410.00 | 32,800.00 | 325.00 | 26,000.00 | 400.00 | 32,000.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 31.00 | 1,937.50 | 50.00 | 3,125.00 | 45.00 | 2,812.50 | 45.00 | 2,812.50 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 120.00 | 12,000.00 | 125.00 | 12,500.00 | 135.00 | 13,500.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,800.00 | 15,200.00 | 3,800.00 | 15,200.00 | 4,750.00 | 19,000.00 | 4,125.00 | 16,500.00 | | 0020 | 711-03-00400 | Riprap (55 lb) | 912.2 | TON | 110.00 | 100,342.00 | 120.00 | 109,464.00 | 90.00 | 82,098.00 | 91.50 | 83,466.30 | | 0021 | 711-04-00100 | Geotextile Fabric | 1,308 | SQYD | 2.50 | 3,270.00 | 4.00 | 5,232.00 | 8.00 | 10,464.00 | 4.00 | 5,232.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 44,000.00 | 44,000.00 | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 85,000.00 | 85,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 1.4 | TON | 2,400.00 | 3,360.00 | 2,000.00 | 2,800.00 | 3,500.00 | 4,900.00 | 2,850.00 | 3,990.00 | | 0024 | 717-01-00100 | Seeding | 60 | LB | 23.00 | 1,380.00 | 30.00 | 1,800.00 | 50.00 | 3,000.00 | 35.00 | 2,100.00 | | 0025 | 718-01-00100 | Fertilizer | 1,200 | LB | 1.60 | 1,920.00 | 1.10 | 1,320.00 | 2.00 | 2,400.00 | 2.00 | 2,400.00 | | 0026 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,649 | SQYD | 1.50 | 2,473.50 | 3.50 | 5,771.50 | 5.00 | 8,245.00 | 6.50 | 10,718.50 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 220,000.00 | 220,000.00 | 279,000.00 | 279,000.00 | 250,000.00 | 250,000.00 | 290,000.00 | 290,000.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 90.00 | 360.00 | 150.00 | 600.00 | 250.00 | 1,000.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 27 | EACH | 50.00 | 1,350.00 | 55.00 | 1,485.00 | 100.00 | 2,700.00 | 50.00 | 1,350.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.402 | MILE | 15,000.00 | 6,030.00 | 16,000.00 | 6,432.00 | 25,000.00 | 10,050.00 | 20,000.00 | 8,040.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | | 0033 | 804-01-00400 | Precast Concrete Piles (18") | 2,560 | LNFT | 115.00 | 294,400.00 | 165.00 | 422,400.00 | 175.00 | 448,000.00 | 190.00 | 486,400.00 | | 0034 | 804-10-00400 | Precast Concrete Indicator Piles (18") | 1 | EACH | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 85,000.00 | 85,000.00 | | 0035 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 4,000.00 | 28,000.00 | 4,800.00 | 33,600.00 | 2,000.00 | 14,000.00 | 4,500.00 | 31,500.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 1,250.00 | 279,912.50 | 1,750.00 | 391,877.50 | 3,000.00 | 671,790.00 | 2,200.00 | 492,646.00 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 2,000.00 | 127,000.00 | 2,000.00 | 127,000.00 | 3,500.00 | 222,250.00 | 4,000.00 | 254,000.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 1.50 | 2,823.00 | 3.00 | 5,646.00 | 3.00 | 5,646.00 | 1.00 | 1,882.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 2.00 | 3,764.00 | 3.00 | 5,646.00 | 3.00 | 5,646.00 | 1.00 | 1,882.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 1.80 | 94,120.20 | 2.00 | 104,578.00 | 3.00 | 156,867.00 | 2.90 | 151,638.10 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 300.00 | 84,000.00 | 375.00 | 105,000.00 | 350.00 | 98,000.00 | 355.00 | 99,400.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,307 | SQFT | 125.00 | 163,375.00 | 145.00 | 189,515.00 | 115.00 | 150,305.00 | 155.00 | 202,585.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 120.00 | 21,000.00 | 200.00 | 35,000.00 | 300.00 | 52,500.00 | 215.00 | 37,625.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 276 | LNFT | 7.00 | 1,932.00 | 28.00 | 7,728.00 | 25.00 | 6,900.00 | 16.00 | 4,416.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 188 | LNFT | 7.00 | 1,316.00 | 12.50 | 2,350.00 | 15.00 | 2,820.00 | 18.50 | 3,478.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 312 | LNFT | 7.00 | 2,184.00 | 3.00 | 936.00 | 15.00 | 4,680.00 | 10.00 | 3,120.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 549 | INLF | 2.00 | 1,098.00 | 2.00 | 1,098.00 | 5.00 | 2,745.00 | 12.00 | 6,588.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,255,649.59 | | 2,791,595.25 | | 2,989,751.40 | | 3,296,359.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Coastal Contractors, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.46 | LUMP | 75,000.00 | 75,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,157.4 | SQYD | 40.00 | 46,296.00 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,157.4 | SQYD | 40.00 | 46,296.00 | | 0004 | 202-02-04501 | Removal of Bridge PRECAST CONCRETE 27' W X 76' L WITH TIMBER HEADWALLS) | 2,052 | LUMP | 155,000.00 | 155,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 400 | LNFT | 10.00 | 4,000.00 | | 0006 | 203-02-00100 | Drainage Excavation | 715 | CUYD | 85.00 | 60,775.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 175,000.00 | 175,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 300.00 | 1,200.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,063 | LNFT | 4.00 | 4,252.00 | | 0010 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 1,098.9 | SQYD | 45.00 | 49,450.50 | | 0011 | 304-01-00100 | Lime | 16.49 | TON | 480.00 | 7,915.20 | | 0012 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 1,098 | SQYD | 40.00 | 43,920.00 | | 0013 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 1,098 | SQYD | 42.00 | 46,116.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 247.5 | TON | 290.00 | 71,775.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40.6 | TON | 480.00 | 19,488.00 | | 0016 | 510-01-00001 | Pavement Patching 14.5" MINIMUM THICKNESS | 80 | SQYD | 480.00 | 38,400.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 40.00 | 2,500.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 138.00 | 13,800.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,250.00 | 17,000.00 | | 0020 | 711-03-00400 | Riprap (55 lb) | 912.2 | TON | 115.00 | 104,903.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 1,308 | SQYD | 6.00 | 7,848.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 1.4 | TON | 3,000.00 | 4,200.00 | | 0024 | 717-01-00100 | Seeding | 60 | LB | 30.00 | 1,800.00 | | 0025 | 718-01-00100 | Fertilizer | 1,200 | LB | 3.00 | 3,600.00 | | 0026 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,649 | SQYD | 2.00 | 3,298.00 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 120.00 | 480.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 27 | EACH | 50.00 | 1,350.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.402 | MILE | 25,000.00 | 10,050.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | | 0033 | 804-01-00400 | Precast Concrete Piles (18") | 2,560 | LNFT | 135.00 | 345,600.00 | | 0034 | 804-10-00400 | Precast Concrete Indicator Piles (18") | 1 | EACH | 68,000.00 | 68,000.00 | | 0035 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 2,500.00 | 17,500.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 3,450.00 | 772,558.50 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 3,900.00 | 247,650.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 3.50 | 6,587.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 2.75 | 143,794.75 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 330.00 | 92,400.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,307 | SQFT | 140.00 | 182,980.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 115.00 | 20,125.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 276 | LNFT | 38.00 | 10,488.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 188 | LNFT | 19.00 | 3,572.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 312 | LNFT | 9.00 | 2,808.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 549 | INLF | 5.00 | 2,745.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,373,166.95 |
|