Proposal:H.012955.6
Parish:Richland
Routes:LA 15
Description:LA 15: US 425 - OUACHITA PL
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, GUARDRAIL, AND RELATED WORK.
Estimated Construction Cost:$1,388,566.40
| Rank | License | Bidder | Construction Bid |
| 1 | 05635 | Dreher Contracting, LLC | $1,649,752.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Dreher Contracting, LLC | | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 2,764 | LNFT | 22.00 | 60,808.00 | | 0002 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 93,914 | GAL | 3.60 | 338,090.40 | | 0003 | 507-02-00300 | Aggregate (S3) | 302,945 | SQYD | 1.70 | 515,006.50 | | 0004 | 509-01-00100 | Milling Asphalt Pavement | 366 | SQYD | 40.00 | 14,640.00 | | 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10 | CUYD | 1.00 | -10.00 | | 0006 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 366 | SQYD | 190.00 | 69,540.00 | | 0007 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 880 | LNFT | 80.00 | 70,400.00 | | 0008 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,050 | LNFT | 40.00 | 42,000.00 | | 0009 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 125.00 | 50,000.00 | | 0010 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 16 | EACH | 3,850.00 | 61,600.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | | 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.864 | MILE | 900.00 | 9,777.60 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.898 | MILE | 1,600.00 | 54,236.80 | | 0014 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 3,460 | EACH | 3.00 | 10,380.00 | | 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 153,000.00 | 153,000.00 | | 0016 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 175.00 | 2,800.00 | | 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,350 | EACH | 9.00 | 21,150.00 | | 0018 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 33.898 | MILE | 1,800.00 | 61,016.40 | | 0019 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 10.864 | MILE | 1,200.00 | 13,036.80 | | 0020 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 201 | LNFT | 2.00 | 402.00 | | 0021 | 737-03-00300 | Painted Traffic Striping (Solid Line) (8" Width) | 297 | LNFT | 6.00 | 1,782.00 | | 0022 | 737-03-00500 | Painted Traffic Striping (Solid Line) (24" Width) | 12 | LNFT | 8.00 | 96.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,649,752.50 |
|