Proposal:H.014480.6
Parish:Jefferson
Routes:LA 48
Description:LA 48: HUEY P - LA 49
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,939,854.30
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $14,876,235.07 |
| 2 | 06276 | Barriere Construction Co., LLC | $19,826,418.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Concrete Posts | 5 | EACH | 280.00 | 1,400.00 | 100.00 | 500.00 | | 0002 | 202-02-00010 | Removal of Timber Bulkhead | 3 | EACH | 550.00 | 1,650.00 | 200.00 | 600.00 | | 0003 | 202-02-00030 | Removal of Sheet Pile | 30 | LNFT | 37.00 | 1,110.00 | 50.00 | 1,500.00 | | 0004 | 202-02-00030 | Removal of Utility Pipe | 6 | LNFT | 93.00 | 558.00 | 25.00 | 150.00 | | 0005 | 202-02-02000 | Removal of Asphalt Drives | 31 | SQYD | 100.00 | 3,100.00 | 25.00 | 775.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 1,005 | SQYD | 20.00 | 20,100.00 | 25.00 | 25,125.00 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 786 | SQYD | 30.00 | 23,580.00 | 20.00 | 15,720.00 | | 0008 | 202-02-06020 | Removal of Concrete Box Culverts 8' of 3'x6' | 1 | EACH | 1,750.00 | 1,750.00 | 1,500.00 | 1,500.00 | | 0009 | 202-02-06020 | Removal of Concrete Box Culverts 9' of 2'x3' | 1 | EACH | 705.00 | 705.00 | 1,500.00 | 1,500.00 | | 0010 | 202-02-06060 | Removal of Concrete Catch Basin | 11 | EACH | 2,350.00 | 25,850.00 | 500.00 | 5,500.00 | | 0011 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,155 | SQYD | 47.00 | 54,285.00 | 30.00 | 34,650.00 | | 0012 | 202-02-06140 | Removal of Curbs (Concrete) | 1,429 | LNFT | 32.00 | 45,728.00 | 10.00 | 14,290.00 | | 0013 | 202-02-26000 | Removal of Manholes | 4 | EACH | 2,650.00 | 10,600.00 | 500.00 | 2,000.00 | | 0014 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 10 | LNFT | 35.00 | 350.00 | 20.00 | 200.00 | | 0015 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" RCP | 10 | LNFT | 25.00 | 250.00 | 20.00 | 200.00 | | 0016 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 86 | LNFT | 35.00 | 3,010.00 | 20.00 | 1,720.00 | | 0017 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 72 | LNFT | 50.00 | 3,600.00 | 20.00 | 1,440.00 | | 0018 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP/ RCPA | 755 | LNFT | 50.00 | 37,750.00 | 20.00 | 15,100.00 | | 0019 | 202-02-32140 | Removal of Pipe (Storm Drain) 48" EQ. RCPA | 262 | LNFT | 60.00 | 15,720.00 | 30.00 | 7,860.00 | | 0020 | 202-02-32140 | Removal of Pipe (Storm Drain) 72" RCPA | 9 | LNFT | 78.00 | 702.00 | 100.00 | 900.00 | | 0021 | 202-02-32160 | Removal of Pipe (Yard Drain) 8" RCP | 8 | LNFT | 25.00 | 200.00 | 20.00 | 160.00 | | 0022 | 202-02-32180 | Removal of Pipe Headwalls | 19 | EACH | 2,200.00 | 41,800.00 | 2,000.00 | 38,000.00 | | 0023 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 468 | SQYD | 55.00 | 25,740.00 | 15.00 | 7,020.00 | | 0024 | 202-02-38300 | Removal of Sign and U-Channel Post | 11 | EACH | 250.00 | 2,750.00 | 30.00 | 330.00 | | 0025 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | 5,000.00 | 5,000.00 | | 0026 | 203-10-00100 | Cleaning Existing Ditches L.M. 0.525 | 400 | LNFT | 25.00 | 10,000.00 | 40.00 | 16,000.00 | | 0027 | 204-06-00100 | Temporary Silt Fencing | 5,900 | LNFT | 3.50 | 20,650.00 | 3.00 | 17,700.00 | | 0028 | 502-01-00100 | Asphalt Concrete | 26,891.8 | TON | 135.00 | 3,630,393.00 | 235.75 | 6,339,741.85 | | 0029 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,041.7 | TON | 210.00 | 638,757.00 | 400.00 | 1,216,680.00 | | 0030 | 509-01-00100 | Milling Asphalt Pavement | 269,001 | SQYD | 5.00 | 1,345,005.00 | 12.50 | 3,362,512.50 | | 0031 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -11,213 | CUYD | 0.01 | -112.13 | 1.00 | -11,213.00 | | 0032 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,164 | SQYD | 200.00 | 432,800.00 | 450.00 | 973,800.00 | | 0033 | 602-16-00100 | High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching | 437.3 | SQYD | 310.00 | 135,563.00 | 300.00 | 131,190.00 | | 0034 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 796 | LNFT | 205.00 | 163,180.00 | 220.00 | 175,120.00 | | 0035 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 70 | LNFT | 275.00 | 19,250.00 | 260.00 | 18,200.00 | | 0036 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 820 | LNFT | 345.00 | 282,900.00 | 360.00 | 295,200.00 | | 0037 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 8 | LNFT | 560.00 | 4,480.00 | 510.00 | 4,080.00 | | 0038 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 314 | LNFT | 315.00 | 98,910.00 | 280.00 | 87,920.00 | | 0039 | 701-04-01160 | Storm Drain Pipe Arch (60" Equiv. RCPA) | 262 | LNFT | 915.00 | 239,730.00 | 670.00 | 175,540.00 | | 0040 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 24 | LNFT | 490.00 | 11,760.00 | 250.00 | 6,000.00 | | 0041 | 701-09-00100 | Pipe Fittings | 2 | EACH | 1,900.00 | 3,800.00 | 300.00 | 600.00 | | 0042 | 701-15-00100 | Concrete Collar | 11 | EACH | 2,400.00 | 26,400.00 | 2,000.00 | 22,000.00 | | 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,978 | LNFT | 58.00 | 172,724.00 | 0.01 | 29.78 | | 0044 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 3 | EACH | 1,825.00 | 5,475.00 | 2,500.00 | 7,500.00 | | 0045 | 702-02-00100 | Manholes (MH-06) | 6 | EACH | 16,500.00 | 99,000.00 | 22,000.00 | 132,000.00 | | 0046 | 702-02-00900 | Manholes (MH-14X Open) 14'x8' | 2 | EACH | 33,000.00 | 66,000.00 | 60,000.00 | 120,000.00 | | 0047 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,700.00 | 2,700.00 | 4,000.00 | 4,000.00 | | 0048 | 702-03-00100 | Catch Basins (CB-01) | 39 | EACH | 5,000.00 | 195,000.00 | 9,000.00 | 351,000.00 | | 0049 | 702-03-00200 | Catch Basins (CB-02) | 16 | EACH | 9,000.00 | 144,000.00 | 12,000.00 | 192,000.00 | | 0050 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 5,800.00 | 5,800.00 | 2,500.00 | 2,500.00 | | 0051 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 34,000.00 | 34,000.00 | 25,000.00 | 25,000.00 | | 0052 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 3,400.00 | 6,800.00 | 1,600.00 | 3,200.00 | | 0053 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 23 | EACH | 300.00 | 6,900.00 | 350.00 | 8,050.00 | | 0054 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 5,800.00 | 23,200.00 | 1,600.00 | 6,400.00 | | 0055 | 706-01-00100 | Concrete Walk (4" Thick) | 792.9 | SQYD | 134.00 | 106,248.60 | 100.00 | 79,290.00 | | 0056 | 706-02-00200 | Concrete Drive (6" Thick) | 224.3 | SQYD | 143.00 | 32,074.90 | 110.00 | 24,673.00 | | 0057 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 60 | SQYD | 425.00 | 25,500.00 | 100.00 | 6,000.00 | | 0058 | 706-04-00100 | Handicapped Curb Ramps TYPE 1 | 10 | EACH | 3,800.00 | 38,000.00 | 3,000.00 | 30,000.00 | | 0059 | 706-04-00100 | Handicapped Curb Ramps TYPE 2 | 31 | EACH | 3,600.00 | 111,600.00 | 3,000.00 | 93,000.00 | | 0060 | 706-04-00100 | Handicapped Curb Ramps TYPE 3 | 2 | EACH | 3,900.00 | 7,800.00 | 4,500.00 | 9,000.00 | | 0061 | 706-04-00100 | Handicapped Curb Ramps TYPE 4 | 2 | EACH | 4,000.00 | 8,000.00 | 4,500.00 | 9,000.00 | | 0062 | 706-04-00100 | Handicapped Curb Ramps TYPE 5 | 2 | EACH | 3,800.00 | 7,600.00 | 4,500.00 | 9,000.00 | | 0063 | 706-04-00100 | Handicapped Curb Ramps TYPE 6 | 5 | EACH | 3,600.00 | 18,000.00 | 4,500.00 | 22,500.00 | | 0064 | 706-04-00100 | Handicapped Curb Ramps TYPE 7 | 19 | EACH | 3,800.00 | 72,200.00 | 5,000.00 | 95,000.00 | | 0065 | 707-01-00100 | Concrete Curb | 1,154 | LNFT | 77.00 | 88,858.00 | 45.00 | 51,930.00 | | 0066 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,175,000.00 | 1,175,000.00 | 1,176,000.00 | 1,176,000.00 | | 0067 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 15,778 | LNFT | 0.75 | 11,833.50 | 0.50 | 7,889.00 | | 0068 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,786 | LNFT | 1.50 | 8,679.00 | 1.05 | 6,075.30 | | 0069 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 49.848 | MILE | 250.00 | 12,462.00 | 500.00 | 24,924.00 | | 0070 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.612 | MILE | 1,000.00 | 25,612.00 | 750.00 | 19,209.00 | | 0071 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 114.122 | MILE | 2,300.00 | 262,480.60 | 1,760.00 | 200,854.72 | | 0072 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 100.00 | 600.00 | 75.00 | 450.00 | | 0073 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 112 | EACH | 75.00 | 8,400.00 | 50.00 | 5,600.00 | | 0074 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 36 | EACH | 75.00 | 2,700.00 | 50.00 | 1,800.00 | | 0075 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 38 | EACH | 75.00 | 2,850.00 | 50.00 | 1,900.00 | | 0076 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 18 | EACH | 75.00 | 1,350.00 | 50.00 | 900.00 | | 0078 | 717-01-00100 | Seeding | 97 | LB | 30.00 | 2,910.00 | 26.00 | 2,522.00 | | 0079 | 718-01-00100 | Fertilizer | 4,848 | LB | 2.00 | 9,696.00 | 3.00 | 14,544.00 | | 0080 | 726-01-00100 | Bedding Material | 809.2 | CUYD | 148.00 | 119,761.60 | 130.00 | 105,196.00 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 1,400,000.00 | 1,400,000.00 | 1,272,000.00 | 1,272,000.00 | | 0082 | 729-01-00100 | Sign (Type A) | 3,686 | SQFT | 30.00 | 110,580.00 | 28.00 | 103,208.00 | | 0083 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 490 | EACH | 275.00 | 134,750.00 | 130.00 | 63,700.00 | | 0084 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,000 | EACH | 20.00 | 40,000.00 | 16.00 | 32,000.00 | | 0085 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 5,731 | LNFT | 8.00 | 45,848.00 | 7.00 | 40,117.00 | | 0086 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,057 | LNFT | 25.00 | 26,425.00 | 22.00 | 23,254.00 | | 0087 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,158 | LNFT | 10.00 | 21,580.00 | 7.00 | 15,106.00 | | 0088 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,836 | LNFT | 35.00 | 64,260.00 | 25.00 | 45,900.00 | | 0089 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 700 | LNFT | 4.00 | 2,800.00 | 3.00 | 2,100.00 | | 0090 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 57.061 | MILE | 8,500.00 | 485,018.50 | 6,700.00 | 382,308.70 | | 0091 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.806 | MILE | 2,700.00 | 34,576.20 | 2,400.00 | 30,734.40 | | 0092 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.268 | MILE | 5,200.00 | 1,393.60 | 4,500.00 | 1,206.00 | | 0093 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 650.00 | 650.00 | 500.00 | 500.00 | | 0094 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 1,000.00 | 3,000.00 | 750.00 | 2,250.00 | | 0095 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 56 | EACH | 1,000.00 | 56,000.00 | 750.00 | 42,000.00 | | 0096 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 18 | EACH | 1,000.00 | 18,000.00 | 750.00 | 13,500.00 | | 0097 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 19 | EACH | 1,000.00 | 19,000.00 | 750.00 | 14,250.00 | | 0098 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 9 | EACH | 1,350.00 | 12,150.00 | 1,100.00 | 9,900.00 | | 0099 | 735-01-00100 | Mailboxes | 73 | EACH | 25.00 | 1,825.00 | 20.00 | 1,460.00 | | 0100 | 735-02-00100 | Mailbox Supports (Single) | 61 | EACH | 275.00 | 16,775.00 | 230.00 | 14,030.00 | | 0101 | 735-03-00100 | Mailbox Supports (Double) | 6 | EACH | 275.00 | 1,650.00 | 350.00 | 2,100.00 | | 0102 | 736-01-00100 | Trenching and Backfilling | 100 | LNFT | 15.00 | 1,500.00 | 12.00 | 1,200.00 | | 0103 | 736-09-00100 | Loop Detector | 10,600 | LNFT | 20.00 | 212,000.00 | 15.00 | 159,000.00 | | 0104 | 736-10-00200 | Underground Junction Box (Type E) | 10 | EACH | 2,000.00 | 20,000.00 | 1,572.00 | 15,720.00 | | 0105 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 100 | LNFT | 10.00 | 1,000.00 | 10.00 | 1,000.00 | | 0106 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 50 | LNFT | 15.00 | 750.00 | 10.00 | 500.00 | | 0107 | 740-01-00100 | Construction Layout | 1 | LUMP | 305,000.00 | 305,000.00 | 100,000.00 | 100,000.00 | | 0108 | 741-11-00100 | Adjusting Water Valve | 12 | EACH | 1,000.00 | 12,000.00 | 1,000.00 | 12,000.00 | | 0109 | 741-11-00200 | Adjusting Water Valve and Meter Box L.M. 1.023 | 1 | EACH | 2,850.00 | 2,850.00 | 1,500.00 | 1,500.00 | | 0110 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 127,634 | LNFT | 2.00 | 255,268.00 | 2.75 | 350,993.50 | | 0111 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 80,623 | LNFT | 2.00 | 161,246.00 | 2.75 | 221,713.25 | | 0112 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 45,452 | INLF | 1.50 | 68,178.00 | 1.00 | 45,452.00 | | 0113 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 742 | INLF | 1.50 | 1,113.00 | 2.00 | 1,484.00 | | 0114 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 1 | EACH | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 | | 0115 | NS-MSC-00278 | Adjusting Gas Valves L.M. 1.517 | 1 | EACH | 835.00 | 835.00 | 2,000.00 | 2,000.00 | | 0116 | TS-P26-00100 | Fire Hydrant Assembly (Jefferson Parsh) | 1 | EACH | 13,775.00 | 13,775.00 | 9,000.00 | 9,000.00 | | 0117 | TS-P26-10208 | Gate Valve and Valve Box (8") (Jefferson Parish) | 1 | EACH | 4,500.00 | 4,500.00 | 4,000.00 | 4,000.00 | | 0118 | TS-P26-10212 | Gate Valve and Valve Box (12") | 2 | EACH | 7,500.00 | 15,000.00 | 6,000.00 | 12,000.00 | | 0119 | TS-P26-10303 | Butterfly Valve and Valve Box (18") | 1 | EACH | 28,500.00 | 28,500.00 | 22,000.00 | 22,000.00 | | 0120 | TS-P26-15008 | Waterline (8") (Ductile Iron) (Jefferson Parish) | 20 | LNFT | 345.00 | 6,900.00 | 200.00 | 4,000.00 | | 0121 | TS-P26-15012 | Waterline (12" Ductile Iron) | 50 | LNFT | 350.00 | 17,500.00 | 300.00 | 15,000.00 | | 0122 | TS-P26-15014 | Water Main (14") (Ductile Iron Pipe) | 50 | LNFT | 425.00 | 21,250.00 | 350.00 | 17,500.00 | | 0123 | TS-P26-15018 | Water Main (18") (Ductile Iron Pipe) | 50 | LNFT | 565.00 | 28,250.00 | 440.00 | 22,000.00 | | 0124 | TS-P26-15108 | Waterline (8" PVC) C-900 Pipe | 65 | LNFT | 225.00 | 14,625.00 | 160.00 | 10,400.00 | | 0125 | TS-P26-15112 | Waterline (12" PVC) C-900 Pipe | 885 | LNFT | 270.00 | 238,950.00 | 260.00 | 230,100.00 | | 0126 | TS-P26-15113 | Water Main (14") (PVC) C-900 Pipe | 45 | LNFT | 425.00 | 19,125.00 | 320.00 | 14,400.00 | | 0127 | TS-P26-15114 | Water Main (18") (PVC) C-900 Pipe | 295 | LNFT | 615.00 | 181,425.00 | 420.00 | 123,900.00 | | 0128 | TS-P26-70100 | Fittings for Waterlines (DI) (Jefferson Parish) | 3,000 | LB | 12.00 | 36,000.00 | 15.00 | 45,000.00 | | 0129 | TS-P26-70102 | Transitional Coupling (12") | 3 | EACH | 190.00 | 570.00 | 9,000.00 | 27,000.00 | | 0130 | TS-P26-70103 | Removal and Disposal of Existing AC Waterline (12") | 50 | LNFT | 48.00 | 2,400.00 | 55.00 | 2,750.00 | | 0131 | TS-P26-70103 | Removal and Disposal of Existing AC Waterline (14") | 50 | LNFT | 55.00 | 2,750.00 | 60.00 | 3,000.00 | | 0132 | TS-P26-70103 | Removal and Disposal of Existing AC Waterline (8") | 50 | LNFT | 18.00 | 900.00 | 50.00 | 2,500.00 | | 0133 | TS-P26-70104 | Transitional Coupling (Long Body) (8") (Jefferson Parish) | 1 | EACH | 190.00 | 190.00 | 7,000.00 | 7,000.00 | | 0134 | TS-P26-70112 | Pipe Restraints (8") (Jefferson Parish) | 3 | EACH | 205.00 | 615.00 | 500.00 | 1,500.00 | | 0135 | TS-P26-70114 | Pipe Restraints (12") | 15 | EACH | 590.00 | 8,850.00 | 900.00 | 13,500.00 | | 0136 | TS-P26-70115 | Pipe Restraints (14") | 2 | EACH | 205.00 | 410.00 | 1,800.00 | 3,600.00 | | 0137 | TS-P26-70117 | Pipe Restraints (18") | 16 | EACH | 205.00 | 3,280.00 | 3,000.00 | 48,000.00 | | 0138 | TS-P26-70121 | Transitional Coupling (14") | 2 | EACH | 365.00 | 730.00 | 10,000.00 | 20,000.00 | | 0139 | TS-P26-70222 | PCCP Adapter (18") (Price Bros.) | 2 | EACH | 19,625.00 | 39,250.00 | 15,000.00 | 30,000.00 | | 0140 | TS-P26-74101 | Water Service Connections (<1") | 1 | EACH | 3,700.00 | 3,700.00 | 2,500.00 | 2,500.00 | | 0141 | 202-02-02020 | Removal of Asphalt Pavement | 27 | SQYD | 100.00 | 2,700.00 | 25.00 | 675.00 | | 0142 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 514 | LNFT | 275.00 | 141,350.00 | 260.00 | 133,640.00 | | 0143 | 701-07-00100 | Yard Drain Pipe (4") | 4 | LNFT | 82.00 | 328.00 | 150.00 | 600.00 | | 0144 | 702-08-00100 | Side Drain Safety End (Type 1) | 3 | EACH | 5,000.00 | 15,000.00 | 5,000.00 | 15,000.00 | | 0145 | 706-02-00200 | Concrete Drive (6" Thick) | 161.9 | SQYD | 143.00 | 23,151.70 | 115.00 | 18,618.50 | | 0146 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 24 | EACH | 1,000.00 | 24,000.00 | 900.00 | 21,600.00 | | 0147 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 219 | SQYD | 30.00 | 6,570.00 | 20.00 | 4,380.00 | | 0148 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 96 | LNFT | 475.00 | 45,600.00 | 420.00 | 40,320.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 14,876,235.07 | | 19,826,418.50 |
|