Proposal:H.014347.6
Parish:Ouachita
Description:S GRAND ST: ORANGE ST - STANDIFER AVE
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,467,462.90
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,924,819.60 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,156,044.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 175,000.00 | 175,000.00 | 125,000.00 | 125,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 224,000.00 | 224,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 860 | LNFT | 32.00 | 27,520.00 | 32.00 | 27,520.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,261 | SQYD | 20.00 | 25,220.00 | 20.00 | 25,220.00 | | 0005 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 210.00 | 10,500.00 | 125.00 | 6,250.00 | | 0006 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 210.00 | 10,500.00 | 125.00 | 6,250.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 3,096.4 | TON | 150.00 | 464,460.00 | 165.00 | 510,906.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 198.9 | TON | 350.00 | 69,615.00 | 300.00 | 59,670.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 29,955 | SQYD | 3.50 | 104,842.50 | 6.00 | 179,730.00 | | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 4,400 | SQYD | 195.00 | 858,000.00 | 240.00 | 1,056,000.00 | | 0011 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 408 | LNFT | 300.00 | 122,400.00 | 200.00 | 81,600.00 | | 0012 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 24 | LNFT | 350.00 | 8,400.00 | 225.00 | 5,400.00 | | 0013 | 702-01-00100 | Junction Boxes (Conflict Box) | 3 | EACH | 8,500.00 | 25,500.00 | 12,000.00 | 36,000.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 9,000.00 | 27,000.00 | 7,500.00 | 22,500.00 | | 0015 | 702-03-00500 | Catch Basins (CB-06) | 35 | EACH | 9,500.00 | 332,500.00 | 9,000.00 | 315,000.00 | | 0016 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | | 0017 | 702-04-00100 | Adjusting Manholes | 40 | EACH | 5,700.00 | 228,000.00 | 4,000.00 | 160,000.00 | | 0018 | 706-01-00300 | Concrete Walk (6" Thick) | 3,118.4 | SQYD | 82.00 | 255,708.80 | 120.00 | 374,208.00 | | 0019 | 706-04-00100 | Handicapped Curb Ramps (Type 7) | 34 | EACH | 2,900.00 | 98,600.00 | 3,000.00 | 102,000.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 860 | LNFT | 60.00 | 51,600.00 | 65.00 | 55,900.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 250,000.00 | 250,000.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 286 | LNFT | 1.00 | 286.00 | 3.00 | 858.00 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.584 | MILE | 1,200.00 | 12,700.80 | 1,500.00 | 15,876.00 | | 0024 | 726-01-00100 | Bedding Material | 163 | CUYD | 210.00 | 34,230.00 | 175.00 | 28,525.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 385,000.00 | 385,000.00 | 400,000.00 | 400,000.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 466 | EACH | 8.00 | 3,728.00 | 9.00 | 4,194.00 | | 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 286 | LNFT | 25.00 | 7,150.00 | 30.00 | 8,580.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.065 | MILE | 4,900.00 | 34,618.50 | 5,500.00 | 38,857.50 | | 0029 | 735-01-00100 | Mailboxes | 72 | EACH | 25.00 | 1,800.00 | 10.00 | 720.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 72 | EACH | 350.00 | 25,200.00 | 220.00 | 15,840.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 6.41 | ACRE | 4,000.00 | 25,640.00 | 4,000.00 | 25,640.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0033 | 741-11-00100 | Adjusting Water Valve | 5 | EACH | 800.00 | 4,000.00 | 1,600.00 | 8,000.00 | | 0034 | 741-11-00200 | Adjusting Water Valve and Meter Box | 25 | EACH | 1,200.00 | 30,000.00 | 1,600.00 | 40,000.00 | | 0035 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 2 | EACH | 600.00 | 1,200.00 | 900.00 | 1,800.00 | | 0036 | TS-742-37000 | Adjusting Sanitary Sewer Cleanout | 9 | EACH | 2,100.00 | 18,900.00 | 4,000.00 | 36,000.00 | | 0037 | TS-742-80100 | Sewer Line Point Repair | 3 | EACH | 12,000.00 | 36,000.00 | 15,000.00 | 45,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,924,819.60 | | 4,156,044.50 |
|