Proposal:H.014694.6
Parish:East Baton Rouge
Routes:LA 426
Description:LA 426: LA 73 - SHERWOOD FOREST
Type Construction:GUARDRAIL, CONCRETE WALK, HANDICAPPED CURB RAMP, PLASTIC PAVEMENT STRIPING, AND RELATED WORK.
Estimated Construction Cost:$1,264,207.50
| Rank | License | Bidder | Construction Bid |
| 1 | 54663 | CAPE Construction, LLC | $1,853,728.40 |
| 2 | 21982 | Forby Contracting, Inc. | $1,885,903.30 |
| 3 | 24901 | Hard Rock Construction LLC | $1,935,197.50 |
| 4 | 30774 | Progressive Construction Co., LLC | $2,214,168.61 |
| 5 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $2,221,121.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - CAPE Construction, LLC | - 2 - Forby Contracting, Inc. | - 3 - Hard Rock Construction LLC | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 930 | SQYD | 33.65 | 31,294.50 | 25.00 | 23,250.00 | 21.00 | 19,530.00 | 22.00 | 20,460.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,383 | LNFT | 24.00 | 33,192.00 | 7.50 | 10,372.50 | 11.00 | 15,213.00 | 17.85 | 24,686.55 | | 0003 | 202-02-14500 | Removal of Guard Rail | 78 | LNFT | 13.80 | 1,076.40 | 25.00 | 1,950.00 | 88.00 | 6,864.00 | 88.00 | 6,864.00 | | 0004 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 16,579 | LNFT | 3.01 | 49,902.79 | 2.50 | 41,447.50 | 2.50 | 41,447.50 | 2.70 | 44,763.30 | | 0005 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 47,474 | LNFT | 3.15 | 149,543.10 | 2.95 | 140,048.30 | 2.25 | 106,816.50 | 2.70 | 128,179.80 | | 0006 | 602-03-00100 | Cleaning and Sealing Random Cracks | 829 | LNFT | 4.01 | 3,324.29 | 5.00 | 4,145.00 | 4.50 | 3,730.50 | 5.60 | 4,642.40 | | 0007 | 602-05-01240 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (11" Thick) | 811 | SQYD | 280.00 | 227,080.00 | 345.00 | 279,795.00 | 455.00 | 369,005.00 | 406.00 | 329,266.00 | | 0008 | 602-05-02240 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (11" Thick) | 460 | SQYD | 270.00 | 124,200.00 | 335.00 | 154,100.00 | 455.00 | 209,300.00 | 321.00 | 147,660.00 | | 0009 | 602-05-03240 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (11" Thick) | 250 | SQYD | 265.00 | 66,250.00 | 325.00 | 81,250.00 | 455.00 | 113,750.00 | 373.00 | 93,250.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 40.40 | 1,010.00 | 70.00 | 1,750.00 | 59.00 | 1,475.00 | 106.00 | 2,650.00 | | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 117.00 | 5,850.00 | 130.00 | 6,500.00 | 183.00 | 9,150.00 | 182.00 | 9,100.00 | | 0012 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,256.21 | 4,256.21 | 3,100.00 | 3,100.00 | 3,835.00 | 3,835.00 | 3,825.00 | 3,825.00 | | 0013 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,925.54 | 3,925.54 | 3,600.00 | 3,600.00 | 4,400.00 | 4,400.00 | 4,411.00 | 4,411.00 | | 0014 | 706-01-00300 | Concrete Walk (6" Thick) | 961.7 | SQYD | 106.32 | 102,247.94 | 115.00 | 110,595.50 | 140.00 | 134,638.00 | 104.00 | 100,016.80 | | 0015 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 73.6 | SQYD | 90.80 | 6,682.88 | 105.00 | 7,728.00 | 155.00 | 11,408.00 | 82.00 | 6,035.20 | | 0016 | 706-04-00100 | Handicapped Curb Ramps Type 10 | 1 | EACH | 3,584.53 | 3,584.53 | 2,750.00 | 2,750.00 | 2,500.00 | 2,500.00 | 5,081.00 | 5,081.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps Type 11 | 2 | EACH | 3,500.00 | 7,000.00 | 2,950.00 | 5,900.00 | 1,383.00 | 2,766.00 | 4,503.00 | 9,006.00 | | 0018 | 706-04-00100 | Handicapped Curb Ramps Type 3 | 77 | EACH | 3,000.00 | 231,000.00 | 2,000.00 | 154,000.00 | 1,900.00 | 146,300.00 | 4,165.00 | 320,705.00 | | 0019 | 706-04-00100 | Handicapped Curb Ramps TYPE 8 | 37 | EACH | 3,200.00 | 118,400.00 | 2,250.00 | 83,250.00 | 1,900.00 | 70,300.00 | 5,636.00 | 208,532.00 | | 0020 | 707-01-00100 | Concrete Curb | 1,413 | LNFT | 55.75 | 78,774.75 | 22.50 | 31,792.50 | 25.00 | 35,325.00 | 37.00 | 52,281.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 194,000.00 | 194,000.00 | 115,000.00 | 115,000.00 | 72,500.00 | 72,500.00 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,100 | LNFT | 0.96 | 2,016.00 | 0.50 | 1,050.00 | 0.60 | 1,260.00 | 0.60 | 1,260.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,310 | LNFT | 2.60 | 6,006.00 | 0.50 | 1,155.00 | 0.60 | 1,386.00 | 0.60 | 1,386.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.28 | MILE | 825.00 | 5,181.00 | 1,000.00 | 6,280.00 | 1,200.00 | 7,536.00 | 2,353.00 | 14,776.84 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.28 | MILE | 1,475.63 | 9,266.96 | 1,000.00 | 6,280.00 | 1,200.00 | 7,536.00 | 1,177.00 | 7,391.56 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.32 | MILE | 1,657.53 | 23,735.83 | 1,000.00 | 14,320.00 | 1,700.00 | 24,344.00 | 1,177.00 | 16,854.64 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 210,000.00 | 210,000.00 | 122,000.00 | 122,000.00 | 226,000.00 | 226,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 150.00 | 300.00 | 105.00 | 210.00 | 112.00 | 224.00 | 112.00 | 224.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,850 | EACH | 8.20 | 23,370.00 | 7.50 | 21,375.00 | 9.00 | 25,650.00 | 8.80 | 25,080.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,100 | LNFT | 3.96 | 8,316.00 | 5.00 | 10,500.00 | 6.00 | 12,600.00 | 5.90 | 12,390.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,782 | LNFT | 17.05 | 47,433.10 | 17.00 | 47,294.00 | 20.00 | 55,640.00 | 20.00 | 55,640.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.32 | MILE | 4,950.50 | 70,891.16 | 4,800.00 | 68,736.00 | 5,600.00 | 80,192.00 | 5,650.00 | 80,908.00 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.28 | MILE | 1,980.25 | 12,435.97 | 1,100.00 | 6,908.00 | 1,300.00 | 8,164.00 | 1,294.00 | 8,126.32 | | 0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.4 | MILE | 906.60 | 362.64 | 7,500.00 | 3,000.00 | 8,500.00 | 3,400.00 | 8,824.00 | 3,529.60 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 57 | EACH | 380.50 | 21,688.50 | 475.00 | 27,075.00 | 560.00 | 31,920.00 | 559.00 | 31,863.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 415.80 | 4,158.00 | 475.00 | 4,750.00 | 560.00 | 5,600.00 | 559.00 | 5,590.00 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 450.21 | 8,103.78 | 650.00 | 11,700.00 | 767.00 | 13,806.00 | 765.00 | 13,770.00 | | 0038 | 732-05-00100 | Removal of Existing Markings | 3.14 | MILE | 9,203.80 | 28,899.93 | 15,000.00 | 47,100.00 | 17,700.00 | 55,578.00 | 17,650.00 | 55,421.00 | | 0039 | 737-04-00001 | Painted Curbs and Islands | 834 | LNFT | 13.90 | 11,592.60 | 5.00 | 4,170.00 | 6.00 | 5,004.00 | 5.90 | 4,920.60 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 55,000.00 | 55,000.00 | 15,000.00 | 15,000.00 | 3,500.00 | 3,500.00 | 25,000.00 | 25,000.00 | | 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,488 | INLF | 2.00 | 14,976.00 | 2.00 | 14,976.00 | 1.75 | 13,104.00 | 1.50 | 11,232.00 | | 0042 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 4,800.00 | 9,600.00 | 10,000.00 | 20,000.00 | 15,200.00 | 30,400.00 | 7,825.00 | 15,650.00 | | 0043 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 6 | EACH | 300.00 | 1,800.00 | 450.00 | 2,700.00 | 600.00 | 3,600.00 | 540.00 | 3,240.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,853,728.40 | | 1,885,903.30 | | 1,935,197.50 | | 2,214,168.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - BRIGGS BROTHERS ENTERPRISES CORPORATION | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 930 | SQYD | 44.32 | 41,217.60 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,383 | LNFT | 26.28 | 36,345.24 | | 0003 | 202-02-14500 | Removal of Guard Rail | 78 | LNFT | 12.47 | 972.66 | | 0004 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 16,579 | LNFT | 4.68 | 77,589.72 | | 0005 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 47,474 | LNFT | 4.94 | 234,521.56 | | 0006 | 602-03-00100 | Cleaning and Sealing Random Cracks | 829 | LNFT | 4.94 | 4,095.26 | | 0007 | 602-05-01240 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (11" Thick) | 811 | SQYD | 192.50 | 156,117.50 | | 0008 | 602-05-02240 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (11" Thick) | 460 | SQYD | 190.00 | 87,400.00 | | 0009 | 602-05-03240 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (11" Thick) | 250 | SQYD | 180.00 | 45,000.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 38.17 | 954.25 | | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 130.82 | 6,541.00 | | 0012 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,143.40 | 4,143.40 | | 0013 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,960.56 | 3,960.56 | | 0014 | 706-01-00300 | Concrete Walk (6" Thick) | 961.7 | SQYD | 184.05 | 177,000.89 | | 0015 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 73.6 | SQYD | 85.11 | 6,264.10 | | 0016 | 706-04-00100 | Handicapped Curb Ramps Type 10 | 1 | EACH | 3,170.00 | 3,170.00 | | 0017 | 706-04-00100 | Handicapped Curb Ramps Type 11 | 2 | EACH | 1,752.13 | 3,504.26 | | 0018 | 706-04-00100 | Handicapped Curb Ramps Type 3 | 77 | EACH | 2,215.00 | 170,555.00 | | 0019 | 706-04-00100 | Handicapped Curb Ramps TYPE 8 | 37 | EACH | 2,658.13 | 98,350.81 | | 0020 | 707-01-00100 | Concrete Curb | 1,413 | LNFT | 79.78 | 112,729.14 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 190,097.58 | 190,097.58 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,100 | LNFT | 0.88 | 1,848.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,310 | LNFT | 0.99 | 2,286.90 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.28 | MILE | 877.07 | 5,508.00 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.28 | MILE | 1,226.44 | 7,702.04 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.32 | MILE | 1,700.73 | 24,354.45 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 225,143.04 | 225,143.04 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 152.81 | 305.62 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,850 | EACH | 13.52 | 38,532.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,100 | LNFT | 5.64 | 11,844.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,782 | LNFT | 25.86 | 71,942.52 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.32 | MILE | 8,325.02 | 119,214.29 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.28 | MILE | 2,221.94 | 13,953.78 | | 0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.4 | MILE | 11,841.59 | 4,736.64 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 57 | EACH | 524.91 | 29,919.87 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 555.85 | 5,558.50 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 735.33 | 13,235.94 | | 0038 | 732-05-00100 | Removal of Existing Markings | 3.14 | MILE | 22,995.02 | 72,204.36 | | 0039 | 737-04-00001 | Painted Curbs and Islands | 834 | LNFT | 19.44 | 16,212.96 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 57,464.05 | 57,464.05 | | 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,488 | INLF | 1.91 | 14,302.08 | | 0042 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 7,857.56 | 15,715.12 | | 0043 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 6 | EACH | 1,434.44 | 8,606.64 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,221,121.33 |
|