Proposal:H.014408.6
Parish:East Baton Rouge
Routes:LA 67
Description:LA 67: RCUT @ BLOUNT RD
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$303,564.88
| Rank | License | Bidder | Construction Bid |
| 1 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $453,848.76 |
| 2 | 55950 | Brown Industrial Construction, LLC | $518,623.47 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $522,559.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRIGGS BROTHERS ENTERPRISES CORPORATION | - 2 - Brown Industrial Construction, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 342.9 | SQYD | 26.46 | 9,073.13 | 12.00 | 4,114.80 | 22.00 | 7,543.80 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 435.7 | SQYD | 12.42 | 5,411.39 | 9.00 | 3,921.30 | 22.00 | 9,585.40 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,521.43 | 1,521.43 | 790.00 | 790.00 | 1,800.00 | 1,800.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 93 | SQYD | 37.55 | 3,492.15 | 50.00 | 4,650.00 | 30.00 | 2,790.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 457.45 | 457.45 | 600.00 | 600.00 | 525.00 | 525.00 | | 0006 | 202-03-38020 | Relocation of Sign Pole . | 1 | EACH | 328.10 | 328.10 | 1,100.00 | 1,100.00 | 1,100.00 | 1,100.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 44,397.48 | 44,397.48 | 70,000.00 | 70,000.00 | 40,000.00 | 40,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 350 | LNFT | 3.71 | 1,298.50 | 2.50 | 875.00 | 2.00 | 700.00 | | 0009 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 912.8 | SQYD | 52.50 | 47,922.00 | 73.00 | 66,634.40 | 55.00 | 50,204.00 | | 0010 | 304-01-00100 | Lime | 3.22 | TON | 630.59 | 2,030.50 | 320.00 | 1,030.40 | 225.00 | 724.50 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 228 | SQYD | 75.11 | 17,125.08 | 13.00 | 2,964.00 | 8.00 | 1,824.00 | | 0012 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 922.7 | SQYD | 128.00 | 118,105.60 | 145.00 | 133,791.50 | 190.00 | 175,313.00 | | 0013 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 4 | LNFT | 143.95 | 575.80 | 450.00 | 1,800.00 | 375.00 | 1,500.00 | | 0014 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,441.13 | 1,441.13 | 1,350.00 | 1,350.00 | 4,000.00 | 4,000.00 | | 0015 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,585.76 | 4,585.76 | 4,150.00 | 4,150.00 | 5,500.00 | 5,500.00 | | 0016 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 128.2 | SQYD | 71.06 | 9,109.89 | 145.00 | 18,589.00 | 220.00 | 28,204.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 29,543.00 | 29,543.00 | 70,650.00 | 70,650.00 | 60,000.00 | 60,000.00 | | 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 255 | LNFT | 1.08 | 275.40 | 0.80 | 204.00 | 1.00 | 255.00 | | 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 822 | LNFT | 4.25 | 3,493.50 | 4.00 | 3,288.00 | 1.50 | 1,233.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.602 | MILE | 1,258.76 | 757.77 | 100.00 | 60.20 | 300.00 | 180.60 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.407 | MILE | 3,657.26 | 5,145.76 | 1,400.00 | 1,969.80 | 2,000.00 | 2,814.00 | | 0022 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 1 | EACH | 40.57 | 40.57 | 50.00 | 50.00 | 50.00 | 50.00 | | 0023 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 2 | EACH | 43.21 | 86.42 | 50.00 | 100.00 | 50.00 | 100.00 | | 0024 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 49.90 | 49.90 | 70.00 | 70.00 | 50.00 | 50.00 | | 0025 | 726-01-00100 | Bedding Material | 0.3 | CUYD | 311.06 | 93.32 | 1,625.00 | 487.50 | 750.00 | 225.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 2,500.00 | 2,500.00 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | | 0027 | 729-01-00100 | Sign (Type A) | 48 | SQFT | 31.24 | 1,499.52 | 45.00 | 2,160.00 | 42.00 | 2,016.00 | | 0028 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 59.96 | 539.64 | 50.00 | 450.00 | 48.00 | 432.00 | | 0029 | 729-02-00100 | Sign (Type B) | 16.4 | SQFT | 47.19 | 773.92 | 55.00 | 902.00 | 52.00 | 852.80 | | 0030 | 729-08-00200 | Mounting (3 1/2" Size Post) | 3 | EACH | 1,936.34 | 5,809.02 | 1,800.00 | 5,400.00 | 1,800.00 | 5,400.00 | | 0031 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 4 | EACH | 202.93 | 811.72 | 250.00 | 1,000.00 | 240.00 | 960.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 474 | EACH | 16.91 | 8,015.34 | 13.00 | 6,162.00 | 13.00 | 6,162.00 | | 0033 | 731-03-00100 | Removal of Raised Pavement Markers | 0.602 | MILE | 2,324.92 | 1,399.60 | 1,660.00 | 999.32 | 1,600.00 | 963.20 | | 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 255 | LNFT | 3.59 | 915.45 | 3.00 | 765.00 | 3.60 | 918.00 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 810 | LNFT | 15.33 | 12,417.30 | 14.00 | 11,340.00 | 21.00 | 17,010.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 26.18 | 314.16 | 27.00 | 324.00 | 26.00 | 312.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.407 | MILE | 18,538.31 | 26,083.40 | 7,500.00 | 10,552.50 | 6,800.00 | 9,567.60 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.602 | MILE | 9,301.93 | 5,599.76 | 3,400.00 | 2,046.80 | 2,100.00 | 1,264.20 | | 0039 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.237 | MILE | 7,645.23 | 1,811.92 | 6,750.00 | 1,599.75 | 4,100.00 | 971.70 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 351.28 | 351.28 | 440.00 | 440.00 | 525.00 | 525.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 2,099.21 | 4,198.42 | 440.00 | 880.00 | 525.00 | 1,050.00 | | 0042 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 5,227.50 | 10,455.00 | 770.00 | 1,540.00 | 1,100.00 | 2,200.00 | | 0043 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 419.97 | 419.97 | 660.00 | 660.00 | 525.00 | 525.00 | | 0044 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 2 | EACH | 292.62 | 585.24 | 140.00 | 280.00 | 525.00 | 1,050.00 | | 0045 | 732-05-00100 | Removal of Existing Markings | 0.602 | MILE | 27,261.55 | 16,411.45 | 16,600.00 | 9,993.20 | 20,000.00 | 12,040.00 | | 0046 | 737-06-00002 | Painted Islands | 128 | SQYD | 29.50 | 3,776.00 | 45.00 | 5,760.00 | 22.00 | 2,816.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 0.25 | ACRE | 12,904.96 | 3,226.24 | 12,500.00 | 3,125.00 | 4,000.00 | 1,000.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 27,653.00 | 27,653.00 | 5,700.00 | 5,700.00 | 8,000.00 | 8,000.00 | | 0049 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 602 | INLF | 3.19 | 1,920.38 | 2.00 | 1,204.00 | 1.50 | 903.00 | | 0050 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 5,000.00 | 10,000.00 | 1,050.00 | 2,100.00 | 2,200.00 | 4,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 453,848.76 | | 518,623.47 | | 522,559.80 |
|