Proposal:H.014198.6
Parish:Vermilion
Routes:LA 14-X
Description:DOWNTOWN ABBEVILLE STREETSCAPING, PH. II
Type Construction:GRADING, DRAINAGE STRUCTURES, ASPHALT CONCRETE PAVEMENT, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$383,817.80
| Rank | License | Bidder | Construction Bid |
| 1 | 54206 | Southern Constructors, LLC | $480,890.72 |
| 2 | 33663 | Glenn Lege Construction LLC | $646,904.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Southern Constructors, LLC | - 2 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 7.2 | SQYD | 270.00 | 1,944.00 | 135.00 | 972.00 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 7.2 | SQYD | 545.00 | 3,924.00 | 135.00 | 972.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 447.47 | SQYD | 66.00 | 29,533.02 | 61.00 | 27,295.67 | | 0004 | 202-03-38000 | Relocation of Sign (Remove, Store, & Re-Install Signs) | 3 | EACH | 900.00 | 2,700.00 | 125.00 | 375.00 | | 0005 | 203-01-00100 | General Excavation | 30 | CUYD | 145.00 | 4,350.00 | 41.00 | 1,230.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 60 | CUYD | 100.00 | 6,000.00 | 45.50 | 2,730.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 5.5 | TON | 1,745.00 | 9,597.50 | 385.00 | 2,117.50 | | 0008 | 706-01-00100 | Concrete Walk (4" Thick) | 337.5 | SQYD | 150.00 | 50,625.00 | 110.00 | 37,125.00 | | 0009 | 706-04-00100 | Handicapped Curb Ramps Type Three Ramps | 3 | EACH | 4,180.00 | 12,540.00 | 3,400.00 | 10,200.00 | | 0010 | 707-01-00100 | Concrete Curb (Barrier)(6") | 130 | LNFT | 74.00 | 9,620.00 | 56.00 | 7,280.00 | | 0011 | 707-01-00100 | Concrete Curb (Barrier)(8") | 70 | LNFT | 86.00 | 6,020.00 | 58.00 | 4,060.00 | | 0012 | 710-01-00100 | Flowable Fill (Class R Concrete Fill) | 12 | CUYD | 360.00 | 4,320.00 | 220.00 | 2,640.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades (Includes Temporary Business Entrances) | 1 | LUMP | 38,600.00 | 38,600.00 | 89,600.00 | 89,600.00 | | 0014 | 715-01-00100 | Topsoil | 2 | CUYD | 400.00 | 800.00 | 275.00 | 550.00 | | 0015 | 719-01-02020 | Plants (Tree) (Container) (1-1/2 inch cal) (Ilex Cassine, 'STD Dahoon Holly', Male Type) | 4 | EACH | 1,400.00 | 5,600.00 | 735.00 | 2,940.00 | | 0016 | 719-02-00100 | Top Dressing Mulch (3" Depth) | 7 | SQYD | 140.00 | 980.00 | 37.00 | 259.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 177,290.00 | 177,290.00 | | 0018 | 728-01-00050 | Jacked or Bored Pipe (1") (1" PE Water Line) | 40 | LNFT | 150.00 | 6,000.00 | 75.00 | 3,000.00 | | 0019 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 150 | LNFT | 8.50 | 1,275.00 | 24.00 | 3,600.00 | | 0020 | 732-04-08000 | Plastic Pavement Legends and Symbols (Handicap Markings) (4" Width - Blue) | 20 | LNFT | 25.00 | 500.00 | 52.00 | 1,040.00 | | 0021 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 820.00 | 1,640.00 | 2,205.00 | 4,410.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,245.00 | 30,245.00 | 9,900.00 | 9,900.00 | | 0023 | 741-02-00050 | Gate Valve (1") | 1 | EACH | 1,500.00 | 1,500.00 | 350.00 | 350.00 | | 0024 | 741-05-02040 | Water Service Line (1" Polyethylene) (Or 1" Copper) | 310 | LNFT | 22.00 | 6,820.00 | 7.00 | 2,170.00 | | 0025 | 741-11-00200 | Adjusting Water Valve and Meter Box | 7 | EACH | 750.00 | 5,250.00 | 180.00 | 1,260.00 | | 0026 | 741-18-00001 | Valve Box (For 1" Gate Valve) | 1 | EACH | 1,300.00 | 1,300.00 | 550.00 | 550.00 | | 0027 | 805-01-00900 | Class A1 Concrete (Connection with Concrete Walk) | 48.36 | CUYD | 1,375.00 | 66,495.00 | 1,960.00 | 94,785.60 | | 0028 | 822-01-00100 | Trenching and Backfilling | 240 | LNFT | 14.00 | 3,360.00 | 15.00 | 3,600.00 | | 0029 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (3 - #12 AWG) | 25 | LNFT | 11.00 | 275.00 | 12.00 | 300.00 | | 0030 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (3-#8 AWG) | 490 | LNFT | 10.50 | 5,145.00 | 11.00 | 5,390.00 | | 0031 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (4 - #8 AWG) | 185 | LNFT | 15.50 | 2,867.50 | 16.00 | 2,960.00 | | 0032 | 822-03-00100 | Conductors (3 - #10 AWG) (Installed in Existing Conduit) | 170 | LNFT | 7.50 | 1,275.00 | 8.00 | 1,360.00 | | 0033 | 822-04-00400 | Jacked or Bored Casing (1" PVC or Sch 80) (Electrical) | 365 | LNFT | 22.00 | 8,030.00 | 24.00 | 8,760.00 | | 0034 | 822-07-02800 | Luminaire (36 Watt) (LED Lamp Modified and Installed) | 5 | EACH | 745.00 | 3,725.00 | 785.00 | 3,925.00 | | 0035 | 822-15-02100 | Relocate Light Poles (14' Ground Mounted) | 5 | EACH | 1,580.00 | 7,900.00 | 1,660.00 | 8,300.00 | | 0036 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 240 | LNFT | 1.00 | 240.00 | 1.00 | 240.00 | | 0037 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,590 | INLF | 2.80 | 4,452.00 | 2.20 | 3,498.00 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,530 | INLF | 5.00 | 22,650.00 | 2.60 | 11,778.00 | | 0039 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 1 | EACH | 850.00 | 850.00 | 3,400.00 | 3,400.00 | | 0040 | TS-700-00200 | Trench Drains (18" Wide) | 70 | LF | 270.00 | 18,900.00 | 225.00 | 15,750.00 | | 0041 | TS-700-00200 | Trench Drains (30" Wide) | 14 | LF | 300.00 | 4,200.00 | 1,025.00 | 14,350.00 | | 0042 | TS-706-02000 | Concrete (Decorative Surface Treatment) (Cleaning Concrete Surfaces) | 441 | SQYD | 9.70 | 4,277.70 | 7.00 | 3,087.00 | | 0043 | TS-719-00020 | Pavers (Brick) (Furnished and Installed) | 150 | SQFT | 46.00 | 6,900.00 | 70.00 | 10,500.00 | | 0044 | TS-719-00050 | Irrigation System (Furnished and Installed) | 1 | LUMP | 15,265.00 | 15,265.00 | 14,680.00 | 14,680.00 | | 0045 | TS-800-00300 | Handrail (Furnished and Installed) | 14 | LNFT | 350.00 | 4,900.00 | 320.00 | 4,480.00 | | 0046 | TS-822-05020 | Electrical Appurtenance (120 V, 20-Amp GFI Receptacle) | 5 | EACH | 420.00 | 2,100.00 | 445.00 | 2,225.00 | | 0047 | TS-MSC-20080 | Tree Well Planter (Located at Ramps) | 4 | EACH | 3,850.00 | 15,400.00 | 9,905.00 | 39,620.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 480,890.72 | | 646,904.77 |
|