Proposal:H.013758.6
Parish:St. Bernard
Routes:LA 39, LA 47
Description:LA 39: LEFT TURN LANE AT LA 47
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$529,376.00
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $743,259.90 |
| 2 | 48896 | Command Construction Industries LLC | $897,058.78 |
| 3 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $1,356,009.53 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Command Construction Industries LLC | - 3 - BRIGGS BROTHERS ENTERPRISES CORPORATION | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of STREET LIGHT PEDESTAL FOUNDATION | 3 | EACH | 750.00 | 2,250.00 | 2,500.00 | 7,500.00 | 3,000.00 | 9,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 167 | LNFT | 22.00 | 3,674.00 | 25.00 | 4,175.00 | 20.50 | 3,423.50 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 84 | SQYD | 29.00 | 2,436.00 | 25.00 | 2,100.00 | 30.00 | 2,520.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 13 | LNFT | 35.00 | 455.00 | 25.00 | 325.00 | 19.00 | 247.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 503 | SQYD | 28.00 | 14,084.00 | 15.00 | 7,545.00 | 22.00 | 11,066.00 | | 0006 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 27.00 | 54.00 | 250.00 | 500.00 | 1,250.00 | 2,500.00 | | 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,900.00 | 1,900.00 | 10,000.00 | 10,000.00 | 18,500.00 | 18,500.00 | | 0008 | 202-03-00010 | Relocation of Junction Box | 1 | EACH | 650.00 | 650.00 | 2,500.00 | 2,500.00 | 1,700.00 | 1,700.00 | | 0009 | 202-03-38020 | Relocation of Sign Pole INCLUDING SIGNS | 4 | EACH | 55.00 | 220.00 | 2,500.00 | 10,000.00 | 150.00 | 600.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 90,000.00 | 90,000.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 146 | CUYD | 35.00 | 5,110.00 | 25.00 | 3,650.00 | 60.00 | 8,760.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 2.00 | 600.00 | 1.00 | 300.00 | 9.06 | 2,718.00 | | 0013 | 302-02-03000 | Class II Base Course (3" Thick) | 147.8 | SQYD | 42.00 | 6,207.60 | 40.00 | 5,912.00 | 55.00 | 8,129.00 | | 0014 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 75.3 | SQYD | 130.00 | 9,789.00 | 550.00 | 41,415.00 | 55.00 | 4,141.50 | | 0015 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 658.3 | SQYD | 80.00 | 52,664.00 | 60.00 | 39,498.00 | 52.50 | 34,560.75 | | 0016 | 502-01-00100 | Asphalt Concrete | 70.6 | TON | 300.00 | 21,180.00 | 1,900.00 | 134,140.00 | 246.00 | 17,367.60 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 415 | SQYD | 13.00 | 5,395.00 | 50.00 | 20,750.00 | 17.00 | 7,055.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -22 | CUYD | 0.00 | 0.00 | 0.01 | -0.22 | 0.01 | -0.22 | | 0019 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 738.6 | SQYD | 130.00 | 96,018.00 | 200.00 | 147,720.00 | 175.00 | 129,255.00 | | 0020 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 23 | SQYD | 500.00 | 11,500.00 | 450.00 | 10,350.00 | 410.00 | 9,430.00 | | 0021 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 38 | SQYD | 350.00 | 13,300.00 | 400.00 | 15,200.00 | 385.00 | 14,630.00 | | 0022 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 148.7 | SQYD | 250.00 | 37,175.00 | 350.00 | 52,045.00 | 200.00 | 29,740.00 | | 0023 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 17 | LNFT | 400.00 | 6,800.00 | 250.00 | 4,250.00 | 159.00 | 2,703.00 | | 0024 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 9,000.00 | 9,000.00 | 10,000.00 | 10,000.00 | 7,400.00 | 7,400.00 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 51.7 | SQYD | 150.00 | 7,755.00 | 100.00 | 5,170.00 | 140.00 | 7,238.00 | | 0026 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 7.2 | SQYD | 450.00 | 3,240.00 | 150.00 | 1,080.00 | 185.00 | 1,332.00 | | 0027 | 706-04-00100 | Handicapped Curb Ramps TYPE 13 | 1 | EACH | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | 5,037.50 | 5,037.50 | | 0028 | 706-04-00100 | Handicapped Curb Ramps TYPE 2 | 3 | EACH | 4,800.00 | 14,400.00 | 2,500.00 | 7,500.00 | 3,370.00 | 10,110.00 | | 0029 | 707-01-00100 | Concrete Curb | 785 | LNFT | 40.00 | 31,400.00 | 15.00 | 11,775.00 | 50.00 | 39,250.00 | | 0030 | 707-03-00100 | Combination Concrete Curb and Gutter | 100 | LNFT | 80.00 | 8,000.00 | 50.00 | 5,000.00 | 65.00 | 6,500.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | 300,000.00 | 300,000.00 | | 0032 | 717-01-00100 | Seeding | 14 | LB | 30.00 | 420.00 | 25.00 | 350.00 | 31.00 | 434.00 | | 0033 | 718-01-00100 | Fertilizer | 107 | LB | 5.00 | 535.00 | 5.00 | 535.00 | 3.40 | 363.80 | | 0034 | 719-01-06160 | Plants (Plant) (Container) (30 gallon) LAGERSTROEMIA INDICA, CRAPE MYRTLE, 'NATCHEZ WHITE', 'STANDARD' | 4 | EACH | 700.00 | 2,800.00 | 750.00 | 3,000.00 | 250.00 | 1,000.00 | | 0035 | 726-01-00100 | Bedding Material | 5.3 | CUYD | 150.00 | 795.00 | 200.00 | 1,060.00 | 174.50 | 924.85 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 100,000.00 | 100,000.00 | 230,000.00 | 230,000.00 | | 0037 | 729-01-00100 | Sign (Type A) | 22.5 | SQFT | 90.00 | 2,025.00 | 100.00 | 2,250.00 | 50.00 | 1,125.00 | | 0038 | 729-21-00100 | U-Channel Post | 3 | EACH | 400.00 | 1,200.00 | 300.00 | 900.00 | 190.00 | 570.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 126 | EACH | 16.00 | 2,016.00 | 20.00 | 2,520.00 | 65.00 | 8,190.00 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 507 | LNFT | 6.30 | 3,194.10 | 6.00 | 3,042.00 | 15.00 | 7,605.00 | | 0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 170 | LNFT | 21.00 | 3,570.00 | 25.00 | 4,250.00 | 55.00 | 9,350.00 | | 0042 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 395 | LNFT | 7.50 | 2,962.50 | 6.00 | 2,370.00 | 18.00 | 7,110.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 96 | LNFT | 27.00 | 2,592.00 | 25.00 | 2,400.00 | 70.00 | 6,720.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.536 | MILE | 7,900.00 | 4,234.40 | 10,000.00 | 5,360.00 | 28,000.00 | 15,008.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.246 | MILE | 3,100.00 | 762.60 | 5,000.00 | 1,230.00 | 19,000.00 | 4,674.00 | | 0046 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.121 | MILE | 4,200.00 | 508.20 | 5,000.00 | 605.00 | 39,000.00 | 4,719.00 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 530.00 | 2,650.00 | 500.00 | 2,500.00 | 2,000.00 | 10,000.00 | | 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 530.00 | 530.00 | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | | 0049 | 732-05-00100 | Removal of Existing Markings | 0.264 | MILE | 25,000.00 | 6,600.00 | 25,000.00 | 6,600.00 | 79,500.00 | 20,988.00 | | 0050 | 736-01-00100 | Trenching and Backfilling | 190 | LNFT | 10.00 | 1,900.00 | 10.00 | 1,900.00 | 40.00 | 7,600.00 | | 0051 | 736-03-00100 | Jacking or Boring | 210 | LNFT | 18.00 | 3,780.00 | 20.00 | 4,200.00 | 51.00 | 10,710.00 | | 0052 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 1,900.00 | 1,900.00 | 2,500.00 | 2,500.00 | 2,100.00 | 2,100.00 | | 0053 | 736-09-00100 | Loop Detector | 580 | LNFT | 31.00 | 17,980.00 | 30.00 | 17,400.00 | 32.50 | 18,850.00 | | 0054 | 736-10-00300 | Underground Junction Box (Type F) | 5 | EACH | 865.00 | 4,325.00 | 1,500.00 | 7,500.00 | 1,342.00 | 6,710.00 | | 0055 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 145 | LNFT | 7.00 | 1,015.00 | 10.00 | 1,450.00 | 14.00 | 2,030.00 | | 0056 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 210 | LNFT | 11.25 | 2,362.50 | 15.00 | 3,150.00 | 14.00 | 2,940.00 | | 0057 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 2,160 | LNFT | 3.00 | 6,480.00 | 5.00 | 10,800.00 | 6.50 | 14,040.00 | | 0058 | 736-12-02014 | Conductor (2c, #14 awg) | 580 | LNFT | 3.75 | 2,175.00 | 5.00 | 2,900.00 | 5.00 | 2,900.00 | | 0059 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 160 | LNFT | 7.85 | 1,256.00 | 10.00 | 1,600.00 | 10.00 | 1,600.00 | | 0060 | 736-12-06014 | Conductor (6c, #14 awg) | 580 | LNFT | 5.60 | 3,248.00 | 10.00 | 5,800.00 | 8.00 | 4,640.00 | | 0061 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 3,600.00 | 3,600.00 | 2,500.00 | 2,500.00 | 5,500.00 | 5,500.00 | | 0062 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 950.00 | 1,900.00 | 1,000.00 | 2,000.00 | 1,860.00 | 3,720.00 | | 0063 | 736-22-00000 | Pedestrian Push Button | 2 | EACH | 350.00 | 700.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 68,400.00 | 68,400.00 | | 0065 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 1,600.00 | 1,600.00 | | 0066 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 2 | EACH | 5,500.00 | 11,000.00 | 5,000.00 | 10,000.00 | 3,500.00 | 7,000.00 | | 0067 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 486 | INLF | 1.00 | 486.00 | 1.00 | 486.00 | 2.00 | 972.00 | | 0068 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,001 | INLF | 1.00 | 8,001.00 | 1.00 | 8,001.00 | 2.25 | 18,002.25 | | 0069 | NS-719-00002 | Tree Trimming | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 743,259.90 | | 897,058.78 | | 1,356,009.53 |
|