Proposal:H.009489.6
Parish:East Baton Rouge
Routes:US 61
Description:US 61: JEFFERSON HIGHWAY OVERPASS REPAIR
Type Construction:STEEL PILES, BRIDGE REPAIRS AND RELATED WORK.
Estimated Construction Cost:$666,830.00
| Rank | License | Bidder | Construction Bid |
| 1 | 00009 | Coastal Contractors, LLC | $762,095.00 |
| 2 | 26435 | C.E.C., Inc. | $810,648.00 |
| 3 | 06323 | Hemphill Construction Co., Inc. | $859,525.00 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $967,950.00 |
| 5 | 55519 | Key, LLC Of Mississippi | $989,046.00 |
| 6 | 55950 | Brown Industrial Construction, LLC | $1,384,585.00 |
| 7 | 36827 | Shavers-Whittle Construction LLC | $1,829,795.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Coastal Contractors, LLC | - 2 - C.E.C., Inc. | - 3 - Hemphill Construction Co., Inc. | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 640 | LNFT | 8.50 | 5,440.00 | 8.40 | 5,376.00 | 11.75 | 7,520.00 | 10.00 | 6,400.00 | | 0003 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 640 | LNFT | 55.00 | 35,200.00 | 55.80 | 35,712.00 | 60.00 | 38,400.00 | 65.00 | 41,600.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 57,000.00 | 57,000.00 | 50,000.00 | 50,000.00 | 82,500.00 | 82,500.00 | 85,000.00 | 85,000.00 | | 0005 | 713-11-00100 | Portable Changeable Message Signs | 5 | EACH | 4,000.00 | 20,000.00 | 2,300.00 | 11,500.00 | 6,750.00 | 33,750.00 | 2,500.00 | 12,500.00 | | 0006 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 80,000.00 | 80,000.00 | 143,975.00 | 143,975.00 | 100,000.00 | 100,000.00 | | 0007 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 | 7,525.00 | 7,525.00 | 40,000.00 | 40,000.00 | | 0008 | 804-03-00600 | Steel Piles (HP 12x74) | 480 | LNFT | 185.00 | 88,800.00 | 310.00 | 148,800.00 | 145.00 | 69,600.00 | 160.00 | 76,800.00 | | 0009 | 807-01-00200 | Structural Metalwork (Grade 50) (ESTIMATED QTY = 40,986 LBS) | 40,986 | LUMP | 300,000.00 | 300,000.00 | 300,000.00 | 300,000.00 | 323,125.00 | 323,125.00 | 400,000.00 | 400,000.00 | | 0010 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 17 | SFIN | 515.00 | 8,755.00 | 760.00 | 12,920.00 | 940.00 | 15,980.00 | 700.00 | 11,900.00 | | 0011 | 815-03-00200 | Joint Seal (Preformed Silicone) | 60 | LNFT | 65.00 | 3,900.00 | 179.00 | 10,740.00 | 60.00 | 3,600.00 | 100.00 | 6,000.00 | | 0012 | 830-01-00100 | Bridge Superstructure Repair (Base Plate Replacement) | 6 | EACH | 4,000.00 | 24,000.00 | 2,400.00 | 14,400.00 | 1,975.00 | 11,850.00 | 4,625.00 | 27,750.00 | | 0013 | 830-01-00100 | Bridge Superstructure Repair (Shim Replacement) | 12 | EACH | 4,500.00 | 54,000.00 | 2,100.00 | 25,200.00 | 4,225.00 | 50,700.00 | 7,250.00 | 87,000.00 | | 0014 | 830-09-00100 | Structure Jacking | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 58,500.00 | 58,500.00 | 48,000.00 | 48,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 762,095.00 | | 810,648.00 | | 859,525.00 | | 967,950.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Key, LLC Of Mississippi | - 6 - Brown Industrial Construction, LLC | - 7 - Shavers-Whittle Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 26,300.00 | 26,300.00 | 8,000.00 | 8,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 640 | LNFT | 8.00 | 5,120.00 | 12.00 | 7,680.00 | 9.50 | 6,080.00 | | 0003 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 640 | LNFT | 47.00 | 30,080.00 | 60.00 | 38,400.00 | 50.00 | 32,000.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,600.00 | 130,600.00 | 320,000.00 | 320,000.00 | 175,000.00 | 175,000.00 | | 0005 | 713-11-00100 | Portable Changeable Message Signs | 5 | EACH | 3,300.00 | 16,500.00 | 2,750.00 | 13,750.00 | 14,500.00 | 72,500.00 | | 0006 | 727-01-00100 | Mobilization | 1 | LUMP | 121,100.00 | 121,100.00 | 130,000.00 | 130,000.00 | 180,000.00 | 180,000.00 | | 0007 | 740-01-00100 | Construction Layout | 1 | LUMP | 28,500.00 | 28,500.00 | 11,200.00 | 11,200.00 | 95,000.00 | 95,000.00 | | 0008 | 804-03-00600 | Steel Piles (HP 12x74) | 480 | LNFT | 195.00 | 93,600.00 | 500.00 | 240,000.00 | 450.00 | 216,000.00 | | 0009 | 807-01-00200 | Structural Metalwork (Grade 50) (ESTIMATED QTY = 40,986 LBS) | 40,986 | LUMP | 345,000.00 | 345,000.00 | 405,000.00 | 405,000.00 | 485,000.00 | 485,000.00 | | 0010 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 17 | SFIN | 473.00 | 8,041.00 | 635.00 | 10,795.00 | 895.00 | 15,215.00 | | 0011 | 815-03-00200 | Joint Seal (Preformed Silicone) | 60 | LNFT | 50.00 | 3,000.00 | 76.00 | 4,560.00 | 2,850.00 | 171,000.00 | | 0012 | 830-01-00100 | Bridge Superstructure Repair (Base Plate Replacement) | 6 | EACH | 8,050.00 | 48,300.00 | 5,400.00 | 32,400.00 | 9,500.00 | 57,000.00 | | 0013 | 830-01-00100 | Bridge Superstructure Repair (Shim Replacement) | 12 | EACH | 6,345.00 | 76,140.00 | 3,400.00 | 40,800.00 | 12,500.00 | 150,000.00 | | 0014 | 830-09-00100 | Structure Jacking | 1 | LUMP | 56,765.00 | 56,765.00 | 122,000.00 | 122,000.00 | 100,000.00 | 100,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 989,046.00 | | 1,384,585.00 | | 1,829,795.00 |
|