Proposal:H.002868.6
Parish:Lafayette
Routes:LA 3073, US 90
Description:I-49 S: AMB CAFFERY/US 90 INTERCHANGE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGES, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, ALTERNATE AA1 (P.C.C.P): CLASS II BASE COURSE, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT; ALTERNATE AA2 (Asphalt): CLASS II BASE COURSE, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT; AND RELATED WORK.
Estimated Construction Cost:$134,518,049.02
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$18,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $136,521,559.76 | 960.00 | $153,801,559.76 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $145,490,142.93 | 1200.00 | $167,090,142.93 |
| 3 | 58134 | Johnson Bros. Corp. A Southland Co. | $148,877,668.66 | 1080.00 | $168,317,668.66 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Johnson Bros. Corp. A Southland Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 55 | LUMP | 3,000,000.00 | 3,000,000.00 | 2,100,000.00 | 2,100,000.00 | 1,100,000.00 | 1,100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 200,000.00 | 200,000.00 | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | | 0003 | 202-02-00010 | Removal of Billboard Structure (Sta. 727+46.13, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0004 | 202-02-00010 | Removal of Billboard Structure (Sta. 733+12.64, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0005 | 202-02-00010 | Removal of Billboard Structure (Sta. 735+18.32, US 90, Lt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0006 | 202-02-00010 | Removal of Billboard Structure (Sta. 737+75.30, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0007 | 202-02-00010 | Removal of Billboard Structure (Sta. 740+77.11, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0008 | 202-02-00010 | Removal of Billboard Structure (Sta. 742+04.36, US 90, Lt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0009 | 202-02-00010 | Removal of Billboard Structure (Sta. 748+43.80, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0010 | 202-02-00010 | Removal of Billboard Structure (Sta. 768+52.65, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0011 | 202-02-00010 | Removal of Billboard Structure (Sta. 781+81.38, US 90, Rt.) | 1 | EACH | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0012 | 202-02-00030 | Removal of Barrier | 80 | LNFT | 200.00 | 16,000.00 | 65.00 | 5,200.00 | 35.00 | 2,800.00 | | 0013 | 202-02-02020 | Removal of Asphalt Pavement | 32,175.4 | SQYD | 3.00 | 96,526.20 | 5.00 | 160,877.00 | 10.00 | 321,754.00 | | 0014 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,763.3 | SQYD | 15.00 | 26,449.50 | 6.00 | 10,579.80 | 4.00 | 7,053.20 | | 0015 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 78,619 | SQYD | 6.00 | 471,714.00 | 4.50 | 353,785.50 | 3.50 | 275,166.50 | | 0016 | 202-02-05000 | Removal of Building (Sta. 649+06, Ambassador Caffery, Lt.) (Metal) | 1 | EACH | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | | 0017 | 202-02-05000 | Removal of Building (Sta. 651+16, Ambassador Caffery, Rt.)(Metal/Brick) | 1 | EACH | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | | 0018 | 202-02-06020 | Removal of Concrete Box Culverts (Sta. 732+69.39, US 90, 171 LNFT.)(7' x 6') | 1 | EACH | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | | 0019 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 704+13.00, US 90, Lt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0020 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 704+95.83, US 90, Rt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0021 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 727+14.94, US 90, Rt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0022 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 727+15.23, US 90, Lt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0023 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 732+69.38, US 90, Rt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0024 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 732+69.50, US 90, Lt.) | 1 | EACH | 7,000.00 | 7,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | | 0025 | 202-02-06100 | Removal of Concrete Walks and Drives | 7,105 | SQYD | 15.00 | 106,575.00 | 9.00 | 63,945.00 | 30.00 | 213,150.00 | | 0026 | 202-02-06102 | Removal of Incidental Concrete Paving (4" Thick) | 361 | SQYD | 15.00 | 5,415.00 | 14.00 | 5,054.00 | 25.00 | 9,025.00 | | 0027 | 202-02-14500 | Removal of Guard Rail | 3,028.8 | LNFT | 7.50 | 22,716.00 | 14.00 | 42,403.20 | 12.00 | 36,345.60 | | 0028 | 202-02-26000 | Removal of Manholes | 1 | EACH | 2,500.00 | 2,500.00 | 2,100.00 | 2,100.00 | 2,000.00 | 2,000.00 | | 0029 | 202-02-32000 | Removal of Paved Ditches | 39.3 | SQYD | 32.00 | 1,257.60 | 115.00 | 4,519.50 | 25.00 | 982.50 | | 0030 | 202-02-32180 | Removal of Pipe Headwalls | 26 | EACH | 1,600.00 | 41,600.00 | 3,000.00 | 78,000.00 | 1,200.00 | 31,200.00 | | 0031 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 43,593 | SQYD | 7.00 | 305,151.00 | 7.50 | 326,947.50 | 15.00 | 653,895.00 | | 0032 | 202-02-38100 | Removal of Shoulder Drains | 2,260 | LNFT | 4.00 | 9,040.00 | 12.00 | 27,120.00 | 35.00 | 79,100.00 | | 0033 | 202-02-38220 | Removal of Sign Supports | 11 | EACH | 150.00 | 1,650.00 | 155.00 | 1,705.00 | 175.00 | 1,925.00 | | 0034 | 202-02-38300 | Removal of Sign and U-Channel Post | 74 | EACH | 10.00 | 740.00 | 105.00 | 7,770.00 | 50.00 | 3,700.00 | | 0035 | 202-02-38330 | Removal of Sign Cantilever and Footing | 3 | EACH | 11,500.00 | 34,500.00 | 3,750.00 | 11,250.00 | 7,500.00 | 22,500.00 | | 0036 | 202-02-38360 | Removal of Sign Faces | 19 | EACH | 50.00 | 950.00 | 105.00 | 1,995.00 | 54.00 | 1,026.00 | | 0037 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 25,000.00 | 25,000.00 | 17,000.00 | 17,000.00 | 10,000.00 | 10,000.00 | | 0038 | 203-01-00100 | General Excavation | 66,523 | CUYD | 24.00 | 1,596,552.00 | 9.00 | 598,707.00 | 10.00 | 665,230.00 | | 0039 | 203-03-00100 | Embankment | 159,724 | CUYD | 38.00 | 6,069,512.00 | 35.00 | 5,590,340.00 | 35.00 | 5,590,340.00 | | 0040 | 203-04-00300 | Nonplastic Embankment (Stone) | 750 | CUYD | 150.00 | 112,500.00 | 400.00 | 300,000.00 | 200.00 | 150,000.00 | | 0041 | 203-08-00100 | Geotextile Fabric | 385 | SQYD | 9.00 | 3,465.00 | 3.00 | 1,155.00 | 3.50 | 1,347.50 | | 0042 | 203-11-00100 | Settlement Plate Installation and Monitoring | 9 | EACH | 2,800.00 | 25,200.00 | 5,000.00 | 45,000.00 | 2,500.00 | 22,500.00 | | 0043 | 204-02-00100 | Temporary Hay Bales | 1,687 | EACH | 55.00 | 92,785.00 | 60.00 | 101,220.00 | 25.00 | 42,175.00 | | 0044 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 25 | EACH | 300.00 | 7,500.00 | 350.00 | 8,750.00 | 150.00 | 3,750.00 | | 0045 | 204-06-00100 | Temporary Silt Fencing | 27,356 | LNFT | 5.00 | 136,780.00 | 4.00 | 109,424.00 | 2.00 | 54,712.00 | | 0046 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 8,000.00 | 16,000.00 | 10,000.00 | 20,000.00 | 5,000.00 | 10,000.00 | | 0047 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) (Waterline Relocation) | 100 | CUYD | 200.00 | 20,000.00 | 90.00 | 9,000.00 | 200.00 | 20,000.00 | | 0048 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) (Waterline Relocation) | 200 | SQYD | 70.00 | 14,000.00 | 180.00 | 36,000.00 | 130.00 | 26,000.00 | | 0049 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,803.5 | CUYD | 150.00 | 270,525.00 | 90.00 | 162,315.00 | 180.00 | 324,630.00 | | 0050 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) (Waterline Relocation) | 100 | CUYD | 200.00 | 20,000.00 | 90.00 | 9,000.00 | 140.00 | 14,000.00 | | 0051 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 610 | SQYD | 260.00 | 158,600.00 | 300.00 | 183,000.00 | 215.00 | 131,150.00 | | 0052 | 701-01-01081 | Cross Drain Pipe (48" RCP) | 508 | LNFT | 460.00 | 233,680.00 | 310.00 | 157,480.00 | 375.00 | 190,500.00 | | 0053 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 282 | LNFT | 840.00 | 236,880.00 | 675.00 | 190,350.00 | 800.00 | 225,600.00 | | 0054 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 6,258 | LNFT | 200.00 | 1,251,600.00 | 100.00 | 625,800.00 | 125.00 | 782,250.00 | | 0055 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 4,049 | LNFT | 200.00 | 809,800.00 | 165.00 | 668,085.00 | 130.00 | 526,370.00 | | 0056 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,835 | LNFT | 225.00 | 637,875.00 | 155.00 | 439,425.00 | 150.00 | 425,250.00 | | 0057 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 1,874 | LNFT | 250.00 | 468,500.00 | 185.00 | 346,690.00 | 216.00 | 404,784.00 | | 0058 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 716 | LNFT | 325.00 | 232,700.00 | 255.00 | 182,580.00 | 255.00 | 182,580.00 | | 0059 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 810 | LNFT | 425.00 | 344,250.00 | 350.00 | 283,500.00 | 340.00 | 275,400.00 | | 0060 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 292 | LNFT | 550.00 | 160,600.00 | 425.00 | 124,100.00 | 375.00 | 109,500.00 | | 0061 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 60 | LNFT | 240.00 | 14,400.00 | 90.00 | 5,400.00 | 190.00 | 11,400.00 | | 0062 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 30 | LNFT | 220.00 | 6,600.00 | 135.00 | 4,050.00 | 285.00 | 8,550.00 | | 0063 | 701-05-02141 | Side Drain Pipe (Erosion) (48" RPVCP/CPEPDW/CMP) | 30 | LNFT | 440.00 | 13,200.00 | 300.00 | 9,000.00 | 470.00 | 14,100.00 | | 0064 | 701-14-00100 | Cleaning Existing Pipes | 750 | LNFT | 40.00 | 30,000.00 | 30.00 | 22,500.00 | 45.00 | 33,750.00 | | 0065 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 17,684 | LNFT | 0.10 | 1,768.40 | 8.00 | 141,472.00 | 1.00 | 17,684.00 | | 0066 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 11,000.00 | 22,000.00 | 21,000.00 | 42,000.00 | 10,000.00 | 20,000.00 | | 0067 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 10,000.00 | 10,000.00 | 5,500.00 | 5,500.00 | 5,500.00 | 5,500.00 | | 0068 | 702-02-00900 | Manholes (MH-14X Open) | 1 | EACH | 20,000.00 | 20,000.00 | 55,000.00 | 55,000.00 | 52,000.00 | 52,000.00 | | 0069 | 702-03-00100 | Catch Basins (CB-01) | 88 | EACH | 4,500.00 | 396,000.00 | 4,500.00 | 396,000.00 | 5,900.00 | 519,200.00 | | 0070 | 702-03-00500 | Catch Basins (CB-06) | 123 | EACH | 7,000.00 | 861,000.00 | 7,200.00 | 885,600.00 | 6,900.00 | 848,700.00 | | 0071 | 702-03-00600 | Catch Basins (CB-07) | 3 | EACH | 12,000.00 | 36,000.00 | 8,000.00 | 24,000.00 | 9,000.00 | 27,000.00 | | 0072 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 20,000.00 | 260,000.00 | 16,000.00 | 208,000.00 | 14,650.00 | 190,450.00 | | 0073 | 702-04-00210 | Convert Catch Basins to Manholes | 4 | EACH | 4,800.00 | 19,200.00 | 6,500.00 | 26,000.00 | 2,500.00 | 10,000.00 | | 0074 | 702-07-00100 | Cross Drain Safety End (Type 1) | 4 | EACH | 2,900.00 | 11,600.00 | 3,800.00 | 15,200.00 | 5,850.00 | 23,400.00 | | 0075 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,900.00 | 5,800.00 | 2,800.00 | 5,600.00 | 5,850.00 | 11,700.00 | | 0076 | 703-01-00100 | Shoulder Underdrain Systems (Urban) | 15,009 | LNFT | 15.00 | 225,135.00 | 24.00 | 360,216.00 | 38.00 | 570,342.00 | | 0077 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 115.5 | LNFT | 95.00 | 10,972.50 | 77.00 | 8,893.50 | 97.00 | 11,203.50 | | 0078 | 704-02-00100 | Guard Rail (Double Faced) | 400 | LNFT | 90.00 | 36,000.00 | 56.00 | 22,400.00 | 93.00 | 37,200.00 | | 0079 | 704-03-00100 | Blocked Out Guard rail | 85.33 | LNFT | 36.00 | 3,071.88 | 31.00 | 2,645.23 | 37.00 | 3,157.21 | | 0080 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,789.3 | LNFT | 37.00 | 103,204.10 | 32.00 | 89,257.60 | 38.00 | 105,993.40 | | 0081 | 704-05-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 245.00 | 3,062.50 | 142.00 | 1,775.00 | 255.00 | 3,187.50 | | 0082 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 45.9 | LNFT | 155.00 | 7,114.50 | 155.00 | 7,114.50 | 160.00 | 7,344.00 | | 0083 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 75.00 | 1,875.00 | 78.00 | 1,950.00 | 77.00 | 1,925.00 | | 0084 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 175 | LNFT | 110.00 | 19,250.00 | 162.00 | 28,350.00 | 113.00 | 19,775.00 | | 0085 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 3,750.00 | 30,000.00 | 4,300.00 | 34,400.00 | 4,000.00 | 32,000.00 | | 0086 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 4 | EACH | 13,050.00 | 52,200.00 | 12,000.00 | 48,000.00 | 13,500.00 | 54,000.00 | | 0087 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,125.00 | 6,250.00 | 3,950.00 | 7,900.00 | 3,200.00 | 6,400.00 | | 0088 | 705-06-00500 | Chain Link Fence (8 Foot Height) | 680 | LNFT | 500.00 | 340,000.00 | 525.00 | 357,000.00 | 500.00 | 340,000.00 | | 0089 | 706-02-00200 | Concrete Drive (6" Thick) | 2,305.6 | SQYD | 95.00 | 219,032.00 | 95.00 | 219,032.00 | 75.00 | 172,920.00 | | 0090 | 708-01-00100 | Right-of-Way Monument | 43 | EACH | 450.00 | 19,350.00 | 350.00 | 15,050.00 | 315.00 | 13,545.00 | | 0091 | 708-02-00100 | Right-of-Way Monument Witness Post | 43 | EACH | 450.00 | 19,350.00 | 350.00 | 15,050.00 | 245.00 | 10,535.00 | | 0092 | 711-01-01020 | Riprap (2 lb, 12" Thick) | 56 | SQYD | 200.00 | 11,200.00 | 35.00 | 1,960.00 | 115.00 | 6,440.00 | | 0093 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 3,789 | SQYD | 100.00 | 378,900.00 | 180.00 | 682,020.00 | 120.00 | 454,680.00 | | 0094 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,500,000.00 | 1,500,000.00 | 4,000,000.00 | 4,000,000.00 | 215,000.00 | 215,000.00 | | 0095 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,291 | LNFT | 2.00 | 6,582.00 | 2.10 | 6,911.10 | 2.00 | 6,582.00 | | 0096 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 304 | LNFT | 3.50 | 1,064.00 | 3.75 | 1,140.00 | 4.00 | 1,216.00 | | 0097 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.274 | MILE | 5,200.00 | 1,424.80 | 5,500.00 | 1,507.00 | 5,600.00 | 1,534.40 | | 0098 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 15.394 | MILE | 12,000.00 | 184,728.00 | 12,000.00 | 184,728.00 | 12,500.00 | 192,425.00 | | 0099 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 21 | EACH | 100.00 | 2,100.00 | 105.00 | 2,205.00 | 100.00 | 2,100.00 | | 0100 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 10 | EACH | 175.00 | 1,750.00 | 185.00 | 1,850.00 | 188.00 | 1,880.00 | | 0101 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 17 | EACH | 150.00 | 2,550.00 | 155.00 | 2,635.00 | 161.00 | 2,737.00 | | 0102 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,595 | EACH | 10.00 | 15,950.00 | 11.00 | 17,545.00 | 11.00 | 17,545.00 | | 0103 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 2,850 | EACH | 1,900.00 | 5,415,000.00 | 250.00 | 712,500.00 | 2,500.00 | 7,125,000.00 | | 0104 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 126 | EACH | 50.00 | 6,300.00 | 150.00 | 18,900.00 | 86.00 | 10,836.00 | | 0105 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 25,000.00 | 100,000.00 | 25,000.00 | 100,000.00 | 19,500.00 | 78,000.00 | | 0106 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 144,300.00 | 144,300.00 | | 0107 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.8 | MILE | 2,500.00 | 9,500.00 | 3,000.00 | 11,400.00 | 1,860.00 | 7,068.00 | | 0108 | 725-01-00100 | Temporary Detour Roads | 10,880.5 | SQYD | 150.00 | 1,632,075.00 | 92.00 | 1,001,006.00 | 135.00 | 1,468,867.50 | | 0109 | 726-01-00100 | Bedding Material | 2,354.04 | CUYD | 100.00 | 235,404.00 | 135.00 | 317,795.40 | 105.00 | 247,174.20 | | 0110 | 727-01-00100 | Mobilization | 1 | LUMP | 13,000,000.00 | 13,000,000.00 | 14,000,000.00 | 14,000,000.00 | 14,500,000.00 | 14,500,000.00 | | 0111 | 729-01-00100 | Sign (Type A) | 1,579.6 | SQFT | 35.00 | 55,286.00 | 30.00 | 47,388.00 | 35.00 | 55,286.00 | | 0112 | 729-02-00100 | Sign (Type B) | 17.4 | SQFT | 48.00 | 835.20 | 38.00 | 661.20 | 48.00 | 835.20 | | 0113 | 729-04-00100 | Sign (Type D) | 1,082 | SQFT | 48.00 | 51,936.00 | 38.00 | 41,116.00 | 48.00 | 51,936.00 | | 0114 | 729-05-00100 | Sign (Type E) | 156 | SQFT | 40.00 | 6,240.00 | 47.00 | 7,332.00 | 40.00 | 6,240.00 | | 0115 | 729-06-00100 | Sign (Overhead Mounted) | 1,069.5 | SQFT | 48.00 | 51,336.00 | 40.00 | 42,780.00 | 48.00 | 51,336.00 | | 0116 | 729-08-00100 | Mounting (2 1/2" Size Post) | 1 | EACH | 1,700.00 | 1,700.00 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | | 0117 | 729-08-00200 | Mounting (3 1/2" Size Post) | 19 | EACH | 1,700.00 | 32,300.00 | 1,800.00 | 34,200.00 | 1,725.00 | 32,775.00 | | 0118 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 5 | EACH | 4,900.00 | 24,500.00 | 5,100.00 | 25,500.00 | 5,000.00 | 25,000.00 | | 0119 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 5 | EACH | 6,400.00 | 32,000.00 | 6,600.00 | 33,000.00 | 6,500.00 | 32,500.00 | | 0120 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 26 | EACH | 1,900.00 | 49,400.00 | 2,000.00 | 52,000.00 | 2,000.00 | 52,000.00 | | 0121 | 729-08-00700 | Mounting (W8 x 18 Size Post) | 2 | EACH | 2,500.00 | 5,000.00 | 2,200.00 | 4,400.00 | 2,500.00 | 5,000.00 | | 0122 | 729-08-00900 | Mounting (W10 x 33 Size Post) | 4 | EACH | 5,250.00 | 21,000.00 | 5,700.00 | 22,800.00 | 5,500.00 | 22,000.00 | | 0123 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 4 | EACH | 62,000.00 | 248,000.00 | 70,000.00 | 280,000.00 | 70,000.00 | 280,000.00 | | 0124 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 16,000.00 | 32,000.00 | 14,000.00 | 28,000.00 | 17,000.00 | 34,000.00 | | 0125 | 729-16-00300 | Object Marker Assembly (Type 3) | 13 | EACH | 100.00 | 1,300.00 | 110.00 | 1,430.00 | 105.00 | 1,365.00 | | 0126 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 1 | EACH | 225.00 | 225.00 | 1,100.00 | 1,100.00 | 250.00 | 250.00 | | 0127 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 3 | EACH | 250.00 | 750.00 | 600.00 | 1,800.00 | 250.00 | 750.00 | | 0128 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 2 | EACH | 250.00 | 500.00 | 550.00 | 1,100.00 | 250.00 | 500.00 | | 0129 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 4 | EACH | 62,000.00 | 248,000.00 | 90,000.00 | 360,000.00 | 70,000.00 | 280,000.00 | | 0130 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 92 | EACH | 240.00 | 22,080.00 | 375.00 | 34,500.00 | 245.00 | 22,540.00 | | 0131 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,224 | EACH | 10.00 | 52,240.00 | 11.00 | 57,464.00 | 12.00 | 62,688.00 | | 0132 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 6,400 | LNFT | 23.00 | 147,200.00 | 24.00 | 153,600.00 | 25.00 | 160,000.00 | | 0133 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 365 | LNFT | 25.00 | 9,125.00 | 27.00 | 9,855.00 | 25.00 | 9,125.00 | | 0134 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.232 | MILE | 7,400.00 | 149,716.80 | 7,500.00 | 151,740.00 | 8,000.00 | 161,856.00 | | 0135 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 3.499 | MILE | 22,000.00 | 76,978.00 | 22,500.00 | 78,727.50 | 24,000.00 | 83,976.00 | | 0136 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.969 | MILE | 3,200.00 | 31,900.80 | 2,400.00 | 23,925.60 | 3,500.00 | 34,891.50 | | 0137 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.39 | MILE | 3,200.00 | 1,248.00 | 3,300.00 | 1,287.00 | 3,500.00 | 1,365.00 | | 0138 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.245 | MILE | 20,000.00 | 4,900.00 | 20,000.00 | 4,900.00 | 22,000.00 | 5,390.00 | | 0139 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.962 | MILE | 21,000.00 | 41,202.00 | 22,000.00 | 43,164.00 | 23,000.00 | 45,126.00 | | 0140 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 800.00 | 2,400.00 | 850.00 | 2,550.00 | 860.00 | 2,580.00 | | 0141 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 500.00 | 2,500.00 | 550.00 | 2,750.00 | 540.00 | 2,700.00 | | 0142 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 500.00 | 5,000.00 | 550.00 | 5,500.00 | 540.00 | 5,400.00 | | 0143 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 1,000.00 | 2,000.00 | 1,050.00 | 2,100.00 | 1,100.00 | 2,200.00 | | 0144 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 3 | EACH | 1,000.00 | 3,000.00 | 1,050.00 | 3,150.00 | 1,100.00 | 3,300.00 | | 0145 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 11 | EACH | 1,500.00 | 16,500.00 | 1,600.00 | 17,600.00 | 1,100.00 | 12,100.00 | | 0146 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 600.00 | 1,800.00 | 650.00 | 1,950.00 | 1,600.00 | 4,800.00 | | 0147 | 732-05-00100 | Removal of Existing Markings | 2.519 | MILE | 15,000.00 | 37,785.00 | 16,000.00 | 40,304.00 | 17,000.00 | 42,823.00 | | 0148 | 736-01-00100 | Trenching and Backfilling | 182 | LNFT | 6.00 | 1,092.00 | 6.25 | 1,137.50 | 6.00 | 1,092.00 | | 0149 | 736-03-00100 | Jacking or Boring | 263 | LNFT | 12.00 | 3,156.00 | 12.50 | 3,287.50 | 18.00 | 4,734.00 | | 0150 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 2 | EACH | 14,000.00 | 28,000.00 | 15,000.00 | 30,000.00 | 14,000.00 | 28,000.00 | | 0151 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 2 | EACH | 16,000.00 | 32,000.00 | 16,000.00 | 32,000.00 | 16,000.00 | 32,000.00 | | 0152 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 2 | EACH | 18,000.00 | 36,000.00 | 19,000.00 | 38,000.00 | 18,000.00 | 36,000.00 | | 0153 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 9 | EACH | 1,000.00 | 9,000.00 | 1,000.00 | 9,000.00 | 995.00 | 8,955.00 | | 0154 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | | 0155 | 736-05-35001 | Signal Heads (3 Sec, 12 inch Led Lens, RT. R, RT. Y, RT. G) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | | 0156 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 1 | EACH | 1,300.00 | 1,300.00 | 1,400.00 | 1,400.00 | 1,350.00 | 1,350.00 | | 0157 | 736-05-51000 | Signal Heads (5 Section, 12 inch Led Lens, R, LT. Y, Y, LT. G, G) | 3 | EACH | 1,700.00 | 5,100.00 | 1,700.00 | 5,100.00 | 1,700.00 | 5,100.00 | | 0158 | 736-06-00100 | Signal Service | 2 | EACH | 5,800.00 | 11,600.00 | 6,000.00 | 12,000.00 | 5,750.00 | 11,500.00 | | 0159 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 1,600.00 | 3,200.00 | 1,700.00 | 3,400.00 | 1,700.00 | 3,400.00 | | 0160 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 6,600.00 | 13,200.00 | 7,000.00 | 14,000.00 | 6,400.00 | 12,800.00 | | 0161 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 650.00 | 1,300.00 | 700.00 | 1,400.00 | 660.00 | 1,320.00 | | 0162 | 736-10-00300 | Underground Junction Box (Type F) | 6 | EACH | 760.00 | 4,560.00 | 800.00 | 4,800.00 | 766.00 | 4,596.00 | | 0163 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 1,400.00 | 2,800.00 | 1,600.00 | 3,200.00 | 1,450.00 | 2,900.00 | | 0164 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 370 | LNFT | 6.00 | 2,220.00 | 6.00 | 2,220.00 | 6.00 | 2,220.00 | | 0165 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 117 | LNFT | 10.00 | 1,170.00 | 10.00 | 1,170.00 | 10.00 | 1,170.00 | | 0166 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 50 | LNFT | 7.00 | 350.00 | 7.00 | 350.00 | 7.00 | 350.00 | | 0167 | 736-12-06014 | Conductor (6c, #14 awg) | 491 | LNFT | 5.00 | 2,455.00 | 5.00 | 2,455.00 | 6.00 | 2,946.00 | | 0168 | 736-12-10014 | Conductor (10c, #14 awg) | 1,258 | LNFT | 5.00 | 6,290.00 | 5.50 | 6,919.00 | 5.00 | 6,290.00 | | 0169 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 6 | EACH | 6,600.00 | 39,600.00 | 7,000.00 | 42,000.00 | 6,600.00 | 39,600.00 | | 0170 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 2 | EACH | 75,000.00 | 150,000.00 | 75,000.00 | 150,000.00 | 75,000.00 | 150,000.00 | | 0171 | 739-01-00100 | Hydro-Seeding | 63.75 | ACRE | 4,500.00 | 286,875.00 | 4,500.00 | 286,875.00 | 4,500.00 | 286,875.00 | | 0172 | 740-01-00100 | Construction Layout | 1 | LUMP | 900,000.00 | 900,000.00 | 2,000,000.00 | 2,000,000.00 | 1,000,000.00 | 1,000,000.00 | | 0173 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 80,000.00 | 80,000.00 | 1,000,000.00 | 1,000,000.00 | 50,000.00 | 50,000.00 | | 0174 | 802-01-00100 | Structural Excavation (Bents) | 7,367 | CUYD | 40.00 | 294,680.00 | 95.00 | 699,865.00 | 125.00 | 920,875.00 | | 0175 | 802-04-00100 | Mechanically Stabilized Earth Wall (Concrete Panel) | 11,286 | SQFT | 51.00 | 575,586.00 | 114.00 | 1,286,604.00 | 56.00 | 632,016.00 | | 0176 | 802-05-00100 | MSEW Structural Excavation and Backfill | 1 | LUMP | 630,000.00 | 630,000.00 | 1,500,000.00 | 1,500,000.00 | 100,000.00 | 100,000.00 | | 0177 | 804-01-00300 | Precast Concrete Piles (16") | 55,257 | LNFT | 90.00 | 4,973,130.00 | 115.00 | 6,354,555.00 | 160.00 | 8,841,120.00 | | 0178 | 804-01-00400 | Precast Concrete Piles (18") | 4,372 | LNFT | 140.00 | 612,080.00 | 145.00 | 633,940.00 | 160.00 | 699,520.00 | | 0179 | 804-03-00900 | Steel Piles (HP 14x89) (Eastbound Only) | 1,512 | LNFT | 140.00 | 211,680.00 | 140.00 | 211,680.00 | 170.00 | 257,040.00 | | 0182 | 804-10-00300 | Precast Concrete Indicator Piles (16") | 4 | EACH | 60,000.00 | 240,000.00 | 175,000.00 | 700,000.00 | 10,000.00 | 40,000.00 | | 0183 | 804-10-00400 | Precast Concrete Indicator Piles (18") | 4 | EACH | 60,000.00 | 240,000.00 | 175,000.00 | 700,000.00 | 12,000.00 | 48,000.00 | | 0184 | 804-14-00100 | Dynamic Monitoring Assistance | 86 | EACH | 1,700.00 | 146,200.00 | 4,500.00 | 387,000.00 | 5,000.00 | 430,000.00 | | 0185 | 805-01-00200 | Class A1 Concrete (Deck) | 9,280.72 | CUYD | 1,100.00 | 10,208,792.00 | 1,300.00 | 12,064,936.00 | 790.00 | 7,331,768.80 | | 0186 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 328.45 | CUYD | 1,300.00 | 426,985.00 | 2,500.00 | 821,125.00 | 1,250.00 | 410,562.50 | | 0187 | 805-01-00900 | Class A1 Concrete (Reinforced Concrete Slab) | 30.8 | CUYD | 1,000.00 | 30,800.00 | 900.00 | 27,720.00 | 555.00 | 17,094.00 | | 0189 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 2,371.47 | CUYD | 1,300.00 | 3,082,911.00 | 1,500.00 | 3,557,205.00 | 1,500.00 | 3,557,205.00 | | 0190 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 925.26 | CUYD | 1,100.00 | 1,017,786.00 | 2,600.00 | 2,405,676.00 | 1,400.00 | 1,295,364.00 | | 0191 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 3,382.59 | CUYD | 1,400.00 | 4,735,626.00 | 1,000.00 | 3,382,590.00 | 790.00 | 2,672,246.10 | | 0192 | 805-08-00900 | Precast-Prestressed Concrete Girders (Type BT-72) | 11,191 | LNFT | 320.00 | 3,581,120.00 | 375.00 | 4,196,625.00 | 575.00 | 6,434,825.00 | | 0193 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) Class P3 | 12,670 | LNFT | 435.00 | 5,511,450.00 | 450.00 | 5,701,500.00 | 625.00 | 7,918,750.00 | | 0194 | 805-08-01700 | Precast-Prestressed Concrete Girders (Type LG-78) Class P3 | 11,322 | LNFT | 435.00 | 4,925,070.00 | 450.00 | 5,094,900.00 | 650.00 | 7,359,300.00 | | 0195 | 805-15-00400 | Reinforced Concrete Box Culverts (Precast) (7' x 4') | 662 | LNFT | 1,200.00 | 794,400.00 | 1,300.00 | 860,600.00 | 900.00 | 595,800.00 | | 0196 | 805-15-00800 | Reinforced Concrete Box Culverts (Precast) (7' x 5') | 436 | LNFT | 1,400.00 | 610,400.00 | 1,500.00 | 654,000.00 | 1,100.00 | 479,600.00 | | 0197 | 805-15-01300 | Reinforced Concrete Box Culverts (Precast) (7' x 6') | 226 | LNFT | 1,500.00 | 339,000.00 | 1,700.00 | 384,200.00 | 1,100.00 | 248,600.00 | | 0198 | 805-15-01400 | Reinforced Concrete Box Culverts (Precast) (8' x 6') | 320 | LNFT | 1,500.00 | 480,000.00 | 1,800.00 | 576,000.00 | 1,150.00 | 368,000.00 | | 0199 | 805-16-00800 | Reinforced Concrete Box Culverts (Extension) (7' x 5') | 121 | LNFT | 1,600.00 | 193,600.00 | 1,300.00 | 157,300.00 | 5,000.00 | 605,000.00 | | 0200 | 805-16-01300 | Reinforced Concrete Box Culverts (Extension) (7' x 6') | 48 | LNFT | 2,000.00 | 96,000.00 | 1,700.00 | 81,600.00 | 5,500.00 | 264,000.00 | | 0201 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 10a and 10b) | 1 | EACH | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 | 60,000.00 | 60,000.00 | | 0202 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 10d) | 1 | EACH | 60,000.00 | 60,000.00 | 27,000.00 | 27,000.00 | 62,000.00 | 62,000.00 | | 0203 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 20) | 2 | EACH | 40,000.00 | 80,000.00 | 28,000.00 | 56,000.00 | 60,000.00 | 120,000.00 | | 0204 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 21a and 24a) | 1 | EACH | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | 60,000.00 | 60,000.00 | | 0205 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 21b and 24c) | 1 | EACH | 60,000.00 | 60,000.00 | 130,000.00 | 130,000.00 | 23,000.00 | 23,000.00 | | 0206 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 31) | 2 | EACH | 40,000.00 | 80,000.00 | 28,000.00 | 56,000.00 | 25,000.00 | 50,000.00 | | 0207 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 32) | 2 | EACH | 40,000.00 | 80,000.00 | 28,000.00 | 56,000.00 | 25,000.00 | 50,000.00 | | 0208 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 50a) | 1 | EACH | 50,000.00 | 50,000.00 | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | | 0209 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 50b) | 1 | EACH | 40,000.00 | 40,000.00 | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | | 0210 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 60a) | 1 | EACH | 40,000.00 | 40,000.00 | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | | 0211 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (For Structures 60c) | 1 | EACH | 40,000.00 | 40,000.00 | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | | 0212 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 102,952.6 | SQFT | 1.00 | 102,952.60 | 2.00 | 205,905.20 | 1.60 | 164,724.16 | | 0213 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 258,072.6 | SQFT | 1.00 | 258,072.60 | 2.00 | 516,145.20 | 0.88 | 227,103.89 | | 0214 | 806-01-00100 | Deformed Reinforcing Steel | 3,527,335 | LB | 1.90 | 6,701,936.50 | 2.00 | 7,054,670.00 | 2.25 | 7,936,503.75 | | 0215 | 807-01-00100 | Structural Metalwork (Grade 36) | 5,057 | LUMP | 60,000.00 | 60,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0216 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 122 | LUMP | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | 15,000.00 | 15,000.00 | | 0217 | 810-01-00100 | Concrete Bridge Railing (Standard) | 3,960 | LNFT | 130.00 | 514,800.00 | 150.00 | 594,000.00 | 80.00 | 316,800.00 | | 0218 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 3,516 | LNFT | 140.00 | 492,240.00 | 160.00 | 562,560.00 | 120.00 | 421,920.00 | | 0219 | 810-01-00320 | Concrete Bridge Railing (Double Face) (36 inch Height) | 1,802 | LNFT | 150.00 | 270,300.00 | 180.00 | 324,360.00 | 100.00 | 180,200.00 | | 0220 | 810-05-00110 | Concrete Roadway Barrier (32 inch Height) | 90 | LNFT | 150.00 | 13,500.00 | 450.00 | 40,500.00 | 125.00 | 11,250.00 | | 0221 | 810-05-00330 | Concrete Roadway Barrier (Double Face) (42 inch Height) | 3,626 | LNFT | 200.00 | 725,200.00 | 260.00 | 942,760.00 | 125.00 | 453,250.00 | | 0222 | 810-06-00100 | Concrete Pier Protection System (Vehicle) (Bent No. 8-9, U-turn, and Hwy. 182) | 1,846 | LNFT | 700.00 | 1,292,200.00 | 900.00 | 1,661,400.00 | 750.00 | 1,384,500.00 | | 0223 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (Frontage) | 6,907.95 | SQFT | 55.00 | 379,937.25 | 82.00 | 566,451.90 | 55.00 | 379,937.25 | | 0224 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (Mainline) | 9,853 | SQFT | 100.00 | 985,300.00 | 100.00 | 985,300.00 | 65.00 | 640,445.00 | | 0225 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 2,215 | SFIN | 100.00 | 221,500.00 | 105.00 | 232,575.00 | 80.00 | 177,200.00 | | 0226 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 677 | LNFT | 400.00 | 270,800.00 | 450.00 | 304,650.00 | 200.00 | 135,400.00 | | 0227 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 1,846 | LNFT | 340.00 | 627,640.00 | 200.00 | 369,200.00 | 200.00 | 369,200.00 | | 0228 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,089.86 | LNFT | 28.00 | 30,516.08 | 100.00 | 108,986.00 | 35.00 | 38,145.10 | | 0229 | 816-01-00100 | Bridge Deck Drainage System (Collection) | 1 | LUMP | 500,000.00 | 500,000.00 | 600,000.00 | 600,000.00 | 335,000.00 | 335,000.00 | | 0230 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 8,000.00 | 32,000.00 | 20,000.00 | 80,000.00 | 2,500.00 | 10,000.00 | | 0231 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 128,487 | INLF | 0.40 | 51,394.80 | 1.25 | 160,608.75 | 1.00 | 128,487.00 | | 0232 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 40,097 | INLF | 0.85 | 34,082.45 | 1.80 | 72,174.60 | 1.50 | 60,145.50 | | 0233 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 10 | EACH | 9,500.00 | 95,000.00 | 12,500.00 | 125,000.00 | 10,000.00 | 100,000.00 | | 0234 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 6 | EACH | 2,000.00 | 12,000.00 | 2,000.00 | 12,000.00 | 2,060.00 | 12,360.00 | | 0235 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 36,000.00 | 36,000.00 | | 0236 | NS-704-00001 | High Tension Cable Barrier | 2,080 | LNFT | 50.00 | 104,000.00 | 27.00 | 56,160.00 | 25.00 | 52,000.00 | | 0237 | NS-704-00002 | Cable Barrier Gated End Terminal | 2 | EACH | 11,000.00 | 22,000.00 | 7,000.00 | 14,000.00 | 5,100.00 | 10,200.00 | | 0238 | NS-704-00003 | Concrete Strip | 924.45 | SQYD | 80.00 | 73,956.00 | 100.00 | 92,445.00 | 60.00 | 55,467.00 | | 0239 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 21 | EACH | 600.00 | 12,600.00 | 1,100.00 | 23,100.00 | 650.00 | 13,650.00 | | 0240 | NS-736-00001 | GPS | 2 | EACH | 460.00 | 920.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | | 0241 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) | 6 | EACH | 6,400.00 | 38,400.00 | 6,500.00 | 39,000.00 | 6,500.00 | 39,000.00 | | 0242 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) | 2 | EACH | 5,500.00 | 11,000.00 | 6,000.00 | 12,000.00 | 5,500.00 | 11,000.00 | | 0243 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) | 634 | LNFT | 2.50 | 1,585.00 | 3.00 | 1,902.00 | 3.00 | 1,902.00 | | 0244 | NS-736-00124 | Signal Radar Vehicle Detection System (Training) | 1 | LUMP | 1,800.00 | 1,800.00 | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | | 0245 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 22,000.00 | 44,000.00 | 22,000.00 | 44,000.00 | 22,000.00 | 44,000.00 | | 0246 | NS-744-00518 | Modular Glare Screen (Complete System) (18” Blade) | 1,810 | LNFT | 40.00 | 72,400.00 | 18.00 | 32,580.00 | 30.00 | 54,300.00 | | 0247 | TS-741-10006 | New Fire Hydrant (Type 1) | 18 | EACH | 6,500.00 | 117,000.00 | 3,800.00 | 68,400.00 | 6,600.00 | 118,800.00 | | 0248 | TS-741-10018 | Typical Offset (12" PVC) | 20 | EACH | 800.00 | 16,000.00 | 14,000.00 | 280,000.00 | 800.00 | 16,000.00 | | 0249 | TS-741-10023 | Adjust Valve Boxes | 9 | EACH | 500.00 | 4,500.00 | 1,000.00 | 9,000.00 | 510.00 | 4,590.00 | | 0250 | TS-741-10024 | Remove Water Valves Including Box | 21 | EACH | 550.00 | 11,550.00 | 2,000.00 | 42,000.00 | 555.00 | 11,655.00 | | 0251 | TS-741-37117 | Relocate Water Meter and Water Box | 2 | EACH | 800.00 | 1,600.00 | 17,000.00 | 34,000.00 | 865.00 | 1,730.00 | | 0252 | TS-741-37140 | Tie-Ins (12")(PVC Water Main) | 7 | EACH | 10,000.00 | 70,000.00 | 120,000.00 | 840,000.00 | 10,000.00 | 70,000.00 | | 0253 | TS-741-37140 | Tie-Ins (8")(PVC Water Main) | 2 | EACH | 8,500.00 | 17,000.00 | 11,000.00 | 22,000.00 | 9,000.00 | 18,000.00 | | 0254 | TS-741-60001 | Water Main (12" FPVC) | 1,564 | LNFT | 185.00 | 289,340.00 | 170.00 | 265,880.00 | 200.00 | 312,800.00 | | 0255 | TS-741-60001 | Water Main (12" PVC) | 7,082 | LNFT | 120.00 | 849,840.00 | 92.00 | 651,544.00 | 120.00 | 849,840.00 | | 0256 | TS-741-60001 | Water Main (8" PVC) | 18 | LNFT | 82.50 | 1,485.00 | 78.00 | 1,404.00 | 85.00 | 1,530.00 | | 0257 | TS-741-60003 | Ductile Iron Mechanical Joint Water Main Fittings | 7.67 | TON | 32,000.00 | 245,440.00 | 32,000.00 | 245,440.00 | 18,000.00 | 138,060.00 | | 0258 | TS-741-60017 | Remove Existing Fire Hydrant | 7 | EACH | 600.00 | 4,200.00 | 2,500.00 | 17,500.00 | 625.00 | 4,375.00 | | 0259 | TS-741-60018 | Install Water Main by Conventional Boring and Jacking (12") | 1,524 | LNFT | 120.00 | 182,880.00 | 52.00 | 79,248.00 | 580.00 | 883,920.00 | | 0260 | TS-741-60023 | Restrained Joint Ductile Iron Water Main (12") | 30 | LNFT | 165.00 | 4,950.00 | 225.00 | 6,750.00 | 240.00 | 7,200.00 | | 0261 | TS-741-60026 | Water Main Removal (12") | 6,530 | LNFT | 58.00 | 378,740.00 | 26.00 | 169,780.00 | 60.00 | 391,800.00 | | 0262 | TS-741-60026 | Water Main Removal (8") | 570 | LNFT | 28.00 | 15,960.00 | 26.00 | 14,820.00 | 30.00 | 17,100.00 | | 0263 | TS-741-60027 | Valve and Box (12")(Gate Valve) | 20 | EACH | 4,200.00 | 84,000.00 | 5,500.00 | 110,000.00 | 4,500.00 | 90,000.00 | | 0264 | TS-741-60027 | Valve and Box (6")(Gate Valve) | 18 | EACH | 1,650.00 | 29,700.00 | 1,500.00 | 27,000.00 | 2,000.00 | 36,000.00 | | 0265 | TS-741-60027 | Valve and Box (8")(Gate Valve) | 2 | EACH | 2,750.00 | 5,500.00 | 2,600.00 | 5,200.00 | 2,800.00 | 5,600.00 | | 0266 | TS-741-60028 | Joint Restraint (12") | 26 | EACH | 480.00 | 12,480.00 | 450.00 | 11,700.00 | 500.00 | 13,000.00 | | 0267 | TS-741-60029 | Tapping Sleeve, Valve and Box (12" x 12" Tapped Tee) | 4 | EACH | 9,275.00 | 37,100.00 | 1,600.00 | 6,400.00 | 9,400.00 | 37,600.00 | | 0268 | TS-741-60029 | Tapping Sleeve, Valve and Box (12" x 8" Tapped Tee) | 1 | EACH | 6,575.00 | 6,575.00 | 5,100.00 | 5,100.00 | 6,600.00 | 6,600.00 | | 0269 | TS-741-60033 | Casing Removal | 259 | LNFT | 138.00 | 35,742.00 | 70.00 | 18,130.00 | 140.00 | 36,260.00 | | 0270 | TS-741-60034 | Grouting of Pipes | 331 | LNFT | 75.00 | 24,825.00 | 30.00 | 9,930.00 | 76.00 | 25,156.00 | | | | SUBTOTAL GENERAL | | | | 107,262,940 | | 115,733,600 | | 113,403,063 | | | | | | | | | | | | | | | Alternate AA1 | Alternate AA1 (P.C.C.P.) | | | | | | | | | | | | | | | | | | | | | | 0271 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 177,834.6 | SQYD | 18.00 | 3,201,022.80 | 0.00 | 0.00 | 0.00 | 0.00 | | 0272 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 177,834.6 | SQYD | 22.00 | 3,912,361.20 | 0.00 | 0.00 | 0.00 | 0.00 | | 0273 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 377.9 | SQYD | 55.00 | 20,784.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0274 | 302-02-12080 | Class II Base Course (12" Thick) (Asphalt Concrete Base) | 2,377.5 | SQYD | 65.00 | 154,537.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0275 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 180,212.2 | SQYD | 17.00 | 3,063,607.40 | 0.00 | 0.00 | 0.00 | 0.00 | | 0276 | 502-01-00100 | Asphalt Concrete | 7,123.7 | TON | 205.00 | 1,460,358.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0277 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course (2" Thick) | 1,411.9 | TON | 280.00 | 395,332.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0278 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 211 | SQYD | 110.00 | 23,210.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0279 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 78,622.5 | SQYD | 100.00 | 7,862,250.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0280 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 41,036.9 | SQYD | 105.00 | 4,308,874.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0281 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 842.5 | SQYD | 110.00 | 92,675.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0282 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 18,988 | SQYD | 95.00 | 1,803,860.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0283 | 601-03-01500 | Portland Cement Concrete Shoulder (12" Thick) | 24,745.3 | SQYD | 105.00 | 2,598,256.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0284 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 220 | EACH | 260.00 | 57,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0285 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 2,577.4 | SQYD | 84.00 | 216,501.60 | 0.00 | 0.00 | 0.00 | 0.00 | | 0286 | 707-01-00100 | Concrete Curb | 20,153.3 | LNFT | 4.00 | 80,613.20 | 0.00 | 0.00 | 0.00 | 0.00 | | 0303 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 35 | TON | 205.00 | 7,175.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA1 | | | | 29,258,620 | | 00 | | 00 | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt) | | | | | | | | | | | | | | | | | | | | | | 0287 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 177,834.6 | SQYD | 0.00 | 0.00 | 12.00 | 2,134,015.20 | 25.00 | 4,445,865.00 | | 0288 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 177,834.6 | SQYD | 0.00 | 0.00 | 24.00 | 4,268,030.40 | 23.00 | 4,090,195.80 | | 0289 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 377.9 | SQYD | 0.00 | 0.00 | 50.00 | 18,895.00 | 65.00 | 24,563.50 | | 0290 | 302-02-12080 | Class II Base Course (12" Thick) (Asphalt Concrete Base) | 2,377.5 | SQYD | 0.00 | 0.00 | 100.00 | 237,750.00 | 100.00 | 237,750.00 | | 0291 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 180,212.2 | SQYD | 0.00 | 0.00 | 21.00 | 3,784,456.20 | 38.00 | 6,848,063.60 | | 0292 | 502-01-00100 | Asphalt Concrete | 51,785.3 | TON | 0.00 | 0.00 | 146.00 | 7,560,653.80 | 150.00 | 7,767,795.00 | | 0293 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course (2" Thick) | 1,411.9 | TON | 0.00 | 0.00 | 250.00 | 352,975.00 | 150.00 | 211,785.00 | | 0294 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 211 | SQYD | 0.00 | 0.00 | 200.00 | 42,200.00 | 112.00 | 23,632.00 | | 0295 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 12,750.1 | SQYD | 0.00 | 0.00 | 128.00 | 1,632,012.80 | 125.00 | 1,593,762.50 | | 0296 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 41,036.9 | SQYD | 0.00 | 0.00 | 130.00 | 5,334,797.00 | 140.00 | 5,745,166.00 | | 0297 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 1,050 | SQYD | 0.00 | 0.00 | 128.00 | 134,400.00 | 135.00 | 141,750.00 | | 0298 | 601-03-01500 | Portland Cement Concrete Shoulder (12" Thick) | 24,745.3 | SQYD | 0.00 | 0.00 | 130.00 | 3,216,889.00 | 140.00 | 3,464,342.00 | | 0299 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 120 | EACH | 0.00 | 0.00 | 300.00 | 36,000.00 | 500.00 | 60,000.00 | | 0300 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,564.2 | SQYD | 0.00 | 0.00 | 100.00 | 156,420.00 | 90.00 | 140,778.00 | | 0301 | 707-01-00100 | Concrete Curb | 7,238.3 | LNFT | 0.00 | 0.00 | 12.50 | 90,478.75 | 25.00 | 180,957.50 | | 0302 | 707-03-00100 | Combination Concrete Curb and Gutter | 12,915 | LNFT | 0.00 | 0.00 | 50.00 | 645,750.00 | 35.00 | 452,025.00 | | 0304 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 369.4 | TON | 0.00 | 0.00 | 300.00 | 110,820.00 | 125.00 | 46,175.00 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 29,756,543.15 | | 35,474,605.90 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 136,521,559.76 | | 145,490,142.93 | | 148,877,668.66 |
|