Proposal:H.011965.6
Parish:Orleans
Routes:LA 47
Description:LA 47: IWGO BRIDGE REHABILITATION (HBI)
Type Construction:CLEARING AND GRUBBING, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$42,938,865.28
Maximum Number of Days Allowed for Construction:800
Calculated Daily User Cost:$14,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 56419 | Vimas Painting Company Inc. | $44,772,305.00 | 650.00 | $53,872,305.00 |
| 2 | C0001 | Cekra, Inc | $49,067,326.30 | 600.00 | $57,467,326.30 |
| 3 | 37457 | ROYAL BRIDGE, INC. | $47,972,891.20 | 720.00 | $58,052,891.20 |
| 4 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $52,583,180.00 | 650.00 | $61,683,180.00 |
| 5 | 28182 | Liberty Maintenance, Inc. | $53,488,999.99 | 595.00 | $61,818,999.99 |
| 6 | C0013 | Corcon, Inc. | $66,247,088.49 | 700.00 | $76,047,088.49 |
| 7 | 24429 | Abhe & Svoboda, Inc. | $66,681,937.94 | 800.00 | $77,881,937.94 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Vimas Painting Company Inc. | - 2 - Cekra, Inc | - 3 - ROYAL BRIDGE, INC. | - 4 - SOUTHERN ROAD & BRIDGE, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 10 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-02-00010 | Removal of Debris (Bridge Drains) | 125 | EACH | 456.00 | 57,000.00 | 250.00 | 31,250.00 | 501.60 | 62,700.00 | 650.00 | 81,250.00 | | 0003 | 202-02-00010 | Removal of Debris (Bridge Substructure) | 17 | EACH | 3,080.00 | 52,360.00 | 1,500.00 | 25,500.00 | 3,388.00 | 57,596.00 | 3,200.00 | 54,400.00 | | 0004 | 202-02-00010 | Removal of Existing Speed Reduction Signs | 4 | EACH | 30,250.00 | 121,000.00 | 5,000.00 | 20,000.00 | 33,275.00 | 133,100.00 | 30,000.00 | 120,000.00 | | 0005 | 202-02-00010 | Removal of Existing Vertical Clearance Gauges | 2 | EACH | 30,250.00 | 60,500.00 | 5,000.00 | 10,000.00 | 33,275.00 | 66,550.00 | 30,000.00 | 60,000.00 | | 0006 | 202-02-00030 | Removal of Bridge Joint Seals | 3,471 | LNFT | 5.00 | 17,355.00 | 50.00 | 173,550.00 | 5.50 | 19,090.50 | 25.00 | 86,775.00 | | 0007 | 202-02-04510 | Removal of Bridge Deck (Hydrodemolition) (For Joint Repair) | 104 | SFIN | 66.00 | 6,864.00 | 200.00 | 20,800.00 | 72.60 | 7,550.40 | 500.00 | 52,000.00 | | 0008 | 202-02-04510 | Removal of Bridge Deck (Hydrodemolition) (For LMC installation) | 1,988 | SFIN | 66.00 | 131,208.00 | 50.00 | 99,400.00 | 72.60 | 144,328.80 | 95.00 | 188,860.00 | | 0009 | 202-02-04520 | Removal of Bridge Component Concrete Barrier | 12 | LNFT | 825.00 | 9,900.00 | 2,500.00 | 30,000.00 | 907.50 | 10,890.00 | 1,000.00 | 12,000.00 | | 0010 | 202-02-38200 | Removal of Signs | 1 | EACH | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 15.00 | 15.00 | | 0011 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 500.00 | 1,000.00 | 2,000.00 | 4,000.00 | 2,000.00 | 4,000.00 | 1,500.00 | 3,000.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 2,000,000.00 | 2,000,000.00 | | 0013 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.924 | MILE | 4,500.00 | 13,158.00 | 10,000.00 | 29,240.00 | 4,500.00 | 13,158.00 | 14,000.00 | 40,936.00 | | 0014 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 5.016 | MILE | 17,500.00 | 87,780.00 | 20,000.00 | 100,320.00 | 17,500.00 | 87,780.00 | 22,000.00 | 110,352.00 | | 0015 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 620 | EACH | 1,500.00 | 930,000.00 | 1,160.00 | 719,200.00 | 1,200.00 | 744,000.00 | 800.00 | 496,000.00 | | 0016 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 620 | EACH | 50.00 | 31,000.00 | 200.00 | 124,000.00 | 100.00 | 62,000.00 | 250.00 | 155,000.00 | | 0017 | 713-11-00100 | Portable Changeable Message Signs For Detour Route Signing | 12 | EACH | 1,000.00 | 12,000.00 | 12,000.00 | 144,000.00 | 2,000.00 | 24,000.00 | 500.00 | 6,000.00 | | 0018 | 713-11-00100 | Portable Changeable Message Signs For Project Duration | 4 | EACH | 20,000.00 | 80,000.00 | 20,000.00 | 80,000.00 | 20,000.00 | 80,000.00 | 25,000.00 | 100,000.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 4,300,000.00 | 4,300,000.00 | 4,700,000.00 | 4,700,000.00 | 5,200,000.00 | 5,200,000.00 | 5,500,000.00 | 5,500,000.00 | | 0020 | 729-01-00100 | Sign (Type A) | 9 | SQFT | 40.00 | 360.00 | 100.00 | 900.00 | 31.00 | 279.00 | 45.00 | 405.00 | | 0021 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 9 | SQFT | 40.00 | 360.00 | 100.00 | 900.00 | 31.00 | 279.00 | 45.00 | 405.00 | | 0022 | 729-02-00100 | Sign (Type B) | 6 | SQFT | 40.00 | 240.00 | 100.00 | 600.00 | 31.00 | 186.00 | 45.00 | 270.00 | | 0023 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,650.00 | 3,650.00 | | 0024 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,063 | EACH | 15.00 | 30,945.00 | 25.00 | 51,575.00 | 15.00 | 30,945.00 | 30.00 | 61,890.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.018 | MILE | 6,500.00 | 32,617.00 | 12,000.00 | 60,216.00 | 6,500.00 | 32,617.00 | 15,000.00 | 75,270.00 | | 0027 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.203 | MILE | 4,000.00 | 812.00 | 12,000.00 | 2,436.00 | 4,000.00 | 812.00 | 15,000.00 | 3,045.00 | | 0028 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.12 | MILE | 4,000.00 | 480.00 | 23,000.00 | 2,760.00 | 4,000.00 | 480.00 | 36,000.00 | 4,320.00 | | 0029 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 2.784 | MILE | 14,000.00 | 38,976.00 | 25,000.00 | 69,600.00 | 14,000.00 | 38,976.00 | 30,000.00 | 83,520.00 | | 0030 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 500.00 | 1,500.00 | 4,100.00 | 12,300.00 | 500.00 | 1,500.00 | 6,500.00 | 19,500.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 2.508 | MILE | 22,500.00 | 56,430.00 | 35,000.00 | 87,780.00 | 22,500.00 | 56,430.00 | 41,500.00 | 104,082.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0033 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 2 | LNFT | 2,750.00 | 5,500.00 | 600.00 | 1,200.00 | 3,025.00 | 6,050.00 | 2,500.00 | 5,000.00 | | 0034 | 811-01-00100 | Cleaning and Painting Steel Plate Girder Spans | 723,704 | LUMP | 12,300,000.00 | 12,300,000.00 | 18,700,000.00 | 18,700,000.00 | 12,541,000.00 | 12,541,000.00 | 13,500,000.00 | 13,500,000.00 | | 0035 | 811-01-00100 | Cleaning and Painting Truss Spans | 512,354 | LUMP | 13,300,000.00 | 13,300,000.00 | 15,300,000.00 | 15,300,000.00 | 14,300,000.00 | 14,300,000.00 | 13,500,000.00 | 13,500,000.00 | | 0036 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 3 | SFIN | 3,300.00 | 9,900.00 | 5,000.00 | 15,000.00 | 3,630.00 | 10,890.00 | 15,000.00 | 45,000.00 | | 0037 | 815-03-00200 | Joint Seal (Preformed Silicone) | 2,223 | LNFT | 108.00 | 240,084.00 | 150.00 | 333,450.00 | 118.80 | 264,092.40 | 115.00 | 255,645.00 | | 0038 | 815-03-00300 | Joint Seal (Poured) | 1,944 | LNFT | 55.00 | 106,920.00 | 120.00 | 233,280.00 | 60.50 | 117,612.00 | 60.00 | 116,640.00 | | 0039 | 822-01-00100 | Trenching and Backfilling | 150 | LNFT | 7.00 | 1,050.00 | 9.10 | 1,365.00 | 7.00 | 1,050.00 | 10.00 | 1,500.00 | | 0040 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (1#2 Bare Stranded Ground) (E05- Cond #8) | 15 | LNFT | 65.00 | 975.00 | 84.50 | 1,267.50 | 65.00 | 975.00 | 10.00 | 150.00 | | 0041 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (3#10) (E05- Cond #6) | 1,000 | LNFT | 80.00 | 80,000.00 | 104.00 | 104,000.00 | 90.00 | 90,000.00 | 10.00 | 10,000.00 | | 0042 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (Sched 80) (4#10) (E05- Cond #3) | 300 | LNFT | 13.00 | 3,900.00 | 16.90 | 5,070.00 | 13.00 | 3,900.00 | 12.00 | 3,600.00 | | 0043 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (3#8) (E05- Cond #1) | 1 | LNFT | 250.00 | 250.00 | 325.00 | 325.00 | 250.00 | 250.00 | 30.00 | 30.00 | | 0044 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (4#10) (E05- Cond #2) | 1,200 | LNFT | 30.00 | 36,000.00 | 39.00 | 46,800.00 | 30.00 | 36,000.00 | 30.00 | 36,000.00 | | 0045 | 822-02-03200 | Conduit w Conductors (Liq Tight Flexible Metal) (1") (3#10) (E05- Cond #5) | 10 | LNFT | 56.00 | 560.00 | 72.80 | 728.00 | 56.00 | 560.00 | 20.00 | 200.00 | | 0046 | 822-02-03200 | Conduit w Conductors (Liq Tight Flexible Metal) (1") (4#10) (E05- Cond #4) | 5 | LNFT | 230.00 | 1,150.00 | 299.00 | 1,495.00 | 230.00 | 1,150.00 | 20.00 | 100.00 | | 0047 | 822-09-00100 | Electrical System (Temporary Aerial Lighting) | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | | 0048 | 822-09-00100 | Electrical System (Temporary Navigation Lighting) | 1 | LUMP | 2,000.00 | 2,000.00 | 2,600.00 | 2,600.00 | 2,000.00 | 2,000.00 | 8,500.00 | 8,500.00 | | 0049 | 822-09-00100 | Electrical System Navigation Lighting and Aerial Beacon System Replacement | 1 | LUMP | 90,000.00 | 90,000.00 | 117,000.00 | 117,000.00 | 110,000.00 | 110,000.00 | 185,000.00 | 185,000.00 | | 0050 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Aerial Beacon & Controller) | 1 | LUMP | 3,000.00 | 3,000.00 | 3,900.00 | 3,900.00 | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | | 0051 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Disconnects, Conduit, Conductors, & JBs) | 1 | LUMP | 22,000.00 | 22,000.00 | 28,600.00 | 28,600.00 | 22,000.00 | 22,000.00 | 50,000.00 | 50,000.00 | | 0052 | 822-14-00100 | Removal and Disposal of Luminaire (Navigation Lighting and Floodlights) | 5 | EACH | 2,000.00 | 10,000.00 | 2,600.00 | 13,000.00 | 2,000.00 | 10,000.00 | 5,000.00 | 25,000.00 | | 0053 | 822-16-00200 | Underground Junction Box (11" x 18") (JB1) | 1 | EACH | 2,000.00 | 2,000.00 | 2,600.00 | 2,600.00 | 2,000.00 | 2,000.00 | 300.00 | 300.00 | | 0054 | 822-21-00100 | Duct Marker (Concrete) | 2 | EACH | 500.00 | 1,000.00 | 650.00 | 1,300.00 | 500.00 | 1,000.00 | 1,100.00 | 2,200.00 | | 0055 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 150 | LNFT | 0.50 | 75.00 | 0.65 | 97.50 | 0.50 | 75.00 | 2.00 | 300.00 | | 0056 | 830-01-00100 | Bridge Superstructure Repair (Access Platform Repair) | 4 | EACH | 49,000.00 | 196,000.00 | 31,500.00 | 126,000.00 | 53,542.50 | 214,170.00 | 55,000.00 | 220,000.00 | | 0057 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Repair at PP9 & PP23) | 4 | EACH | 103,000.00 | 412,000.00 | 26,700.00 | 106,800.00 | 112,530.00 | 450,120.00 | 115,000.00 | 460,000.00 | | 0058 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Repair) | 2 | EACH | 31,000.00 | 62,000.00 | 20,700.00 | 41,400.00 | 33,880.00 | 67,760.00 | 30,000.00 | 60,000.00 | | 0059 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Splice Repair) | 3 | EACH | 29,150.00 | 87,450.00 | 17,400.00 | 52,200.00 | 32,065.00 | 96,195.00 | 30,000.00 | 90,000.00 | | 0060 | 830-01-00100 | Bridge Superstructure Repair (Barrier Type 1) | 1 | EACH | 3,300.00 | 3,300.00 | 3,300.00 | 3,300.00 | 3,630.00 | 3,630.00 | 7,500.00 | 7,500.00 | | 0061 | 830-01-00100 | Bridge Superstructure Repair (Barrier Type 2) | 5 | EACH | 2,420.00 | 12,100.00 | 3,300.00 | 16,500.00 | 2,662.00 | 13,310.00 | 4,500.00 | 22,500.00 | | 0062 | 830-01-00100 | Bridge Superstructure Repair (Cross Frame Replacement Type 1) | 1 | EACH | 17,600.00 | 17,600.00 | 36,000.00 | 36,000.00 | 19,360.00 | 19,360.00 | 19,000.00 | 19,000.00 | | 0063 | 830-01-00100 | Bridge Superstructure Repair (Cross Frame Replacement Type 2) | 5 | EACH | 16,500.00 | 82,500.00 | 27,000.00 | 135,000.00 | 18,150.00 | 90,750.00 | 19,000.00 | 95,000.00 | | 0064 | 830-01-00100 | Bridge Superstructure Repair (Diaphragm Repair at L23) | 1 | EACH | 20,000.00 | 20,000.00 | 0.00 | 0.00 | 21,780.00 | 21,780.00 | 45,000.00 | 45,000.00 | | 0065 | 830-01-00100 | Bridge Superstructure Repair (Drain Trough Repair Type 1) | 9 | EACH | 1,760.00 | 15,840.00 | 1,020.00 | 9,180.00 | 1,936.00 | 17,424.00 | 2,000.00 | 18,000.00 | | 0066 | 830-01-00100 | Bridge Superstructure Repair (Drain Trough Repair Type 2) | 8 | EACH | 6,050.00 | 48,400.00 | 1,470.00 | 11,760.00 | 6,655.00 | 53,240.00 | 9,500.00 | 76,000.00 | | 0067 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 34 East) | 1 | EACH | 220,000.00 | 220,000.00 | 147,600.00 | 147,600.00 | 242,000.00 | 242,000.00 | 300,000.00 | 300,000.00 | | 0068 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 34 West) | 1 | EACH | 220,000.00 | 220,000.00 | 147,600.00 | 147,600.00 | 242,000.00 | 242,000.00 | 300,000.00 | 300,000.00 | | 0069 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 37 East) | 1 | EACH | 220,000.00 | 220,000.00 | 147,600.00 | 147,600.00 | 242,000.00 | 242,000.00 | 300,000.00 | 300,000.00 | | 0070 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 37 West) | 1 | EACH | 220,000.00 | 220,000.00 | 147,600.00 | 147,600.00 | 242,000.00 | 242,000.00 | 300,000.00 | 300,000.00 | | 0071 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L23) | 1 | EACH | 682,000.00 | 682,000.00 | 210,000.00 | 210,000.00 | 750,200.00 | 750,200.00 | 800,000.00 | 800,000.00 | | 0072 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L32) | 1 | EACH | 341,000.00 | 341,000.00 | 102,000.00 | 102,000.00 | 375,100.00 | 375,100.00 | 450,000.00 | 450,000.00 | | 0073 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L9) | 1 | EACH | 682,000.00 | 682,000.00 | 210,000.00 | 210,000.00 | 750,200.00 | 750,200.00 | 800,000.00 | 800,000.00 | | 0074 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at U0) | 1 | EACH | 341,000.00 | 341,000.00 | 102,000.00 | 102,000.00 | 375,100.00 | 375,100.00 | 450,000.00 | 450,000.00 | | 0075 | 830-01-00100 | Bridge Superstructure Repair (False Chord Bearing Repair) | 4 | EACH | 31,000.00 | 124,000.00 | 21,600.00 | 86,400.00 | 33,880.00 | 135,520.00 | 55,000.00 | 220,000.00 | | 0076 | 830-01-00100 | Bridge Superstructure Repair (Floor Beam Stiffener Repair Type 1) | 1 | EACH | 1,100.00 | 1,100.00 | 1,110.00 | 1,110.00 | 1,210.00 | 1,210.00 | 2,500.00 | 2,500.00 | | 0077 | 830-01-00100 | Bridge Superstructure Repair (Floor Beam Stiffener Repair Type 2) | 6 | EACH | 2,200.00 | 13,200.00 | 1,590.00 | 9,540.00 | 2,420.00 | 14,520.00 | 4,500.00 | 27,000.00 | | 0078 | 830-01-00100 | Bridge Superstructure Repair (Girder End Repair) | 9 | EACH | 1,650.00 | 14,850.00 | 1,320.00 | 11,880.00 | 1,815.00 | 16,335.00 | 1,800.00 | 16,200.00 | | 0079 | 830-01-00100 | Bridge Superstructure Repair (Girder Splice Repair Type 1) | 3 | EACH | 12,100.00 | 36,300.00 | 7,290.00 | 21,870.00 | 13,310.00 | 39,930.00 | 15,850.00 | 47,550.00 | | 0080 | 830-01-00100 | Bridge Superstructure Repair (Girder Splice Repair Type 2) | 1 | EACH | 10,450.00 | 10,450.00 | 7,290.00 | 7,290.00 | 11,495.00 | 11,495.00 | 15,000.00 | 15,000.00 | | 0081 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 1) | 3 | EACH | 3,850.00 | 11,550.00 | 4,380.00 | 13,140.00 | 4,235.00 | 12,705.00 | 4,000.00 | 12,000.00 | | 0082 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 2) | 2 | EACH | 8,250.00 | 16,500.00 | 6,420.00 | 12,840.00 | 9,075.00 | 18,150.00 | 8,000.00 | 16,000.00 | | 0083 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 3) | 16 | EACH | 4,400.00 | 70,400.00 | 9,300.00 | 148,800.00 | 4,840.00 | 77,440.00 | 6,500.00 | 104,000.00 | | 0084 | 830-01-00100 | Bridge Superstructure Repair (Lateral Bracing Repair) | 1 | EACH | 16,000.00 | 16,000.00 | 16,620.00 | 16,620.00 | 17,545.00 | 17,545.00 | 14,500.00 | 14,500.00 | | 0085 | 830-01-00100 | Bridge Superstructure Repair (Lower Lateral Strut Repair) | 2 | EACH | 89,100.00 | 178,200.00 | 45,000.00 | 90,000.00 | 98,010.00 | 196,020.00 | 85,000.00 | 170,000.00 | | 0086 | 830-01-00100 | Bridge Superstructure Repair (Pin & Hanger Repair at U32) | 1 | EACH | 123,200.00 | 123,200.00 | 444,000.00 | 444,000.00 | 135,520.00 | 135,520.00 | 175,000.00 | 175,000.00 | | 0087 | 830-01-00100 | Bridge Superstructure Repair (Pin Joint Modification at L23) | 1 | EACH | 26,000.00 | 26,000.00 | 2,700.00 | 2,700.00 | 28,435.00 | 28,435.00 | 45,000.00 | 45,000.00 | | 0088 | 830-01-00100 | Bridge Superstructure Repair (Pin Joint Modification at L9) | 1 | EACH | 26,000.00 | 26,000.00 | 2,700.00 | 2,700.00 | 28,435.00 | 28,435.00 | 45,000.00 | 45,000.00 | | 0089 | 830-01-00100 | Bridge Superstructure Repair (Safety Cable System Installation) | 1 | EACH | 4,136,000.00 | 4,136,000.00 | 750,000.00 | 750,000.00 | 4,549,600.00 | 4,549,600.00 | 4,150,000.00 | 4,150,000.00 | | 0090 | 830-01-00100 | Bridge Superstructure Repair (Stringer Anchor Bolt Replacement) | 2 | EACH | 2,750.00 | 5,500.00 | 555.00 | 1,110.00 | 3,025.00 | 6,050.00 | 4,000.00 | 8,000.00 | | 0091 | 830-01-00100 | Bridge Superstructure Repair (Stringer Seat Angle Replacement Type 1) | 60 | EACH | 1,155.00 | 69,300.00 | 1,110.00 | 66,600.00 | 1,270.50 | 76,230.00 | 1,500.00 | 90,000.00 | | 0092 | 830-01-00100 | Bridge Superstructure Repair (Stringer Seat Angle Replacement Type 2) | 15 | EACH | 1,100.00 | 16,500.00 | 795.00 | 11,925.00 | 1,210.00 | 18,150.00 | 1,500.00 | 22,500.00 | | 0093 | 830-01-00100 | Bridge Superstructure Repair (Stringer Shim Plate Repair) | 1 | EACH | 1,650.00 | 1,650.00 | 480.00 | 480.00 | 1,815.00 | 1,815.00 | 5,000.00 | 5,000.00 | | 0094 | 830-01-00100 | Bridge Superstructure Repair (Top Chord End Plate Repair) | 4 | EACH | 6,050.00 | 24,200.00 | 5,550.00 | 22,200.00 | 6,655.00 | 26,620.00 | 17,000.00 | 68,000.00 | | 0095 | 830-01-00100 | Bridge Superstructure Repair (Top Chord Flange Repair) | 4 | EACH | 5,830.00 | 23,320.00 | 2,130.00 | 8,520.00 | 6,413.00 | 25,652.00 | 7,500.00 | 30,000.00 | | 0096 | 830-01-00100 | Bridge Superstructure Repair (Upper Lateral Strut Impact Repair) | 1 | EACH | 26,400.00 | 26,400.00 | 25,500.00 | 25,500.00 | 29,040.00 | 29,040.00 | 88,000.00 | 88,000.00 | | 0097 | 830-01-00100 | Bridge Superstructure Repair (Upper Lateral Strut Repair) | 10 | EACH | 47,300.00 | 473,000.00 | 19,680.00 | 196,800.00 | 52,030.00 | 520,300.00 | 33,000.00 | 330,000.00 | | 0098 | 830-01-00100 | Bridge Superstructure Repair (Wind Lock Repair) | 2 | EACH | 20,000.00 | 40,000.00 | 6,000.00 | 12,000.00 | 21,780.00 | 43,560.00 | 22,000.00 | 44,000.00 | | 0099 | 830-02-00100 | Bridge Substructure Repair (Access Door) | 4 | EACH | 7,150.00 | 28,600.00 | 12,000.00 | 48,000.00 | 7,865.00 | 31,460.00 | 8,000.00 | 32,000.00 | | 0100 | 830-02-00100 | Bridge Substructure Repair (Anchor Nut Replacement) | 6 | EACH | 550.00 | 3,300.00 | 3,600.00 | 21,600.00 | 605.00 | 3,630.00 | 1,250.00 | 7,500.00 | | 0101 | 830-02-00100 | Bridge Substructure Repair (Anchor Nut Tightening) | 2 | EACH | 275.00 | 550.00 | 2,880.00 | 5,760.00 | 302.50 | 605.00 | 500.00 | 1,000.00 | | 0102 | 830-02-00100 | Bridge Substructure Repair (Riser Repair) | 4 | EACH | 8,250.00 | 33,000.00 | 3,510.00 | 14,040.00 | 9,075.00 | 36,300.00 | 9,000.00 | 36,000.00 | | 0103 | 830-07-00100 | Structural Concrete Patching (Barrier) | 16 | SQFT | 407.00 | 6,512.00 | 1,000.00 | 16,000.00 | 447.70 | 7,163.20 | 1,000.00 | 16,000.00 | | 0104 | 830-07-00100 | Structural Concrete Patching (Bent Cap) | 87 | SQFT | 407.00 | 35,409.00 | 1,500.00 | 130,500.00 | 447.70 | 38,949.90 | 650.00 | 56,550.00 | | 0105 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 1) | 325 | SQFT | 407.00 | 132,275.00 | 1,500.00 | 487,500.00 | 447.70 | 145,502.50 | 1,000.00 | 325,000.00 | | 0106 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 2) | 4 | SQFT | 410.00 | 1,640.00 | 4,000.00 | 16,000.00 | 447.70 | 1,790.80 | 2,000.00 | 8,000.00 | | 0107 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 3) | 19 | SQFT | 410.00 | 7,790.00 | 4,000.00 | 76,000.00 | 447.70 | 8,506.30 | 1,000.00 | 19,000.00 | | 0108 | 830-07-00100 | Structural Concrete Patching (Girder End Repair) | 5 | SQFT | 410.00 | 2,050.00 | 1,500.00 | 7,500.00 | 447.70 | 2,238.50 | 1,850.00 | 9,250.00 | | 0109 | 830-07-00100 | Structural Concrete Patching (Girder) | 14 | SQFT | 410.00 | 5,740.00 | 1,500.00 | 21,000.00 | 447.70 | 6,267.80 | 650.00 | 9,100.00 | | 0110 | 830-07-00100 | Structural Concrete Patching (Pile or Column) | 20 | SQFT | 410.00 | 8,200.00 | 1,500.00 | 30,000.00 | 447.70 | 8,954.00 | 500.00 | 10,000.00 | | 0111 | 830-07-00100 | Structural Concrete Patching (Riser Repair) | 2 | SQFT | 410.00 | 820.00 | 1,500.00 | 3,000.00 | 447.70 | 895.40 | 2,000.00 | 4,000.00 | | 0112 | 830-07-00100 | Structural Concrete Patching (Top of Deck) | 96 | SQFT | 410.00 | 39,360.00 | 1,500.00 | 144,000.00 | 447.70 | 42,979.20 | 325.00 | 31,200.00 | | 0113 | 830-09-00100 | Structure Jacking | 1 | LUMP | 47,000.00 | 47,000.00 | 50,000.00 | 50,000.00 | 51,425.00 | 51,425.00 | 228,000.00 | 228,000.00 | | 0114 | 830-10-00100 | Epoxy Injection | 78 | LNFT | 330.00 | 25,740.00 | 500.00 | 39,000.00 | 363.00 | 28,314.00 | 155.00 | 12,090.00 | | 0115 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 6,000 | EACH | 160.00 | 960,000.00 | 200.00 | 1,200,000.00 | 175.45 | 1,052,700.00 | 138.00 | 828,000.00 | | 0116 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 2 | EACH | 5,000.00 | 10,000.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | 15,000.00 | 30,000.00 | | 0117 | NS-818-00001 | Navigation Clearance Gauge (Mounted) | 2 | EACH | 82,500.00 | 165,000.00 | 68,500.00 | 137,000.00 | 90,750.00 | 181,500.00 | 115,000.00 | 230,000.00 | | 0118 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 10 | LNFT | 1,375.00 | 13,750.00 | 2,500.00 | 25,000.00 | 1,512.50 | 15,125.00 | 1,500.00 | 15,000.00 | | 0119 | NS-830-00800 | Latex Modified Concrete Overlay | 1,988 | SFIN | 55.00 | 109,340.00 | 100.00 | 198,800.00 | 60.50 | 120,274.00 | 85.00 | 168,980.00 | | 0120 | NS-830-01000 | Bridge Deck Joint Repair (One Side of Joint) | 8 | LNFT | 2,035.00 | 16,280.00 | 3,000.00 | 24,000.00 | 2,238.50 | 17,908.00 | 3,500.00 | 28,000.00 | | 0121 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs (Girder) | 102 | SQFT | 611.00 | 62,322.00 | 500.00 | 51,000.00 | 671.55 | 68,498.10 | 350.00 | 35,700.00 | | 0122 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs (Pile or Column) | 88 | SQFT | 611.00 | 53,768.00 | 500.00 | 44,000.00 | 671.55 | 59,096.40 | 450.00 | 39,600.00 | | 0123 | NS-830-01800 | Methyl Methacrylate Concrete Sealer | 451,670 | SQFT | 2.00 | 903,340.00 | 1.89 | 853,656.30 | 2.00 | 903,340.00 | 5.00 | 2,258,350.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 44,772,305.00 | | 49,067,326.30 | | 47,972,891.20 | | 52,583,180.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Liberty Maintenance, Inc. | - 6 - Corcon, Inc. | - 7 - Abhe & Svoboda, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 10 | LUMP | 89,124.75 | 89,124.75 | 50,000.00 | 50,000.00 | 65,165.00 | 65,165.00 | | 0002 | 202-02-00010 | Removal of Debris (Bridge Drains) | 125 | EACH | 564.46 | 70,557.50 | 460.56 | 57,570.00 | 153.00 | 19,125.00 | | 0003 | 202-02-00010 | Removal of Debris (Bridge Substructure) | 17 | EACH | 4,753.32 | 80,806.44 | 3,110.80 | 52,883.60 | 153.00 | 2,601.00 | | 0004 | 202-02-00010 | Removal of Existing Speed Reduction Signs | 4 | EACH | 118.84 | 475.36 | 30,552.50 | 122,210.00 | 2,074.00 | 8,296.00 | | 0005 | 202-02-00010 | Removal of Existing Vertical Clearance Gauges | 2 | EACH | 17,824.95 | 35,649.90 | 30,552.50 | 61,105.00 | 4,148.00 | 8,296.00 | | 0006 | 202-02-00030 | Removal of Bridge Joint Seals | 3,471 | LNFT | 53.48 | 185,629.08 | 5.05 | 17,528.55 | 13.00 | 45,123.00 | | 0007 | 202-02-04510 | Removal of Bridge Deck (Hydrodemolition) (For Joint Repair) | 104 | SFIN | 451.57 | 46,963.28 | 66.66 | 6,932.64 | 110.00 | 11,440.00 | | 0008 | 202-02-04510 | Removal of Bridge Deck (Hydrodemolition) (For LMC installation) | 1,988 | SFIN | 24.96 | 49,620.48 | 66.66 | 132,520.08 | 206.00 | 409,528.00 | | 0009 | 202-02-04520 | Removal of Bridge Component Concrete Barrier | 12 | LNFT | 819.95 | 9,839.40 | 833.25 | 9,999.00 | 730.00 | 8,760.00 | | 0010 | 202-02-38200 | Removal of Signs | 1 | EACH | 59.42 | 59.42 | 101.50 | 101.50 | 13.00 | 13.00 | | 0011 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 891.25 | 1,782.50 | 507.50 | 1,015.00 | 1,288.00 | 2,576.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 349,556.66 | 349,556.66 | 589,578.67 | 589,578.67 | 760,924.00 | 760,924.00 | | 0013 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.924 | MILE | 5,347.49 | 15,636.06 | 4,635.00 | 13,552.74 | 7,728.00 | 22,596.67 | | 0014 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 5.016 | MILE | 20,795.78 | 104,311.63 | 18,025.00 | 90,413.40 | 19,320.00 | 96,909.12 | | 0015 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 620 | EACH | 1,247.75 | 773,605.00 | 1.00 | 620.00 | 352.00 | 218,240.00 | | 0016 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 620 | EACH | 148.55 | 92,101.00 | 1.00 | 620.00 | 193.00 | 119,660.00 | | 0017 | 713-11-00100 | Portable Changeable Message Signs For Detour Route Signing | 12 | EACH | 1,829.76 | 21,957.12 | 3,500.00 | 42,000.00 | 1,868.00 | 22,416.00 | | 0018 | 713-11-00100 | Portable Changeable Message Signs For Project Duration | 4 | EACH | 25,009.00 | 100,036.00 | 25,000.00 | 100,000.00 | 24,795.00 | 99,180.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 5,300,000.00 | 5,300,000.00 | 7,500,000.00 | 7,500,000.00 | 6,650,000.00 | 6,650,000.00 | | 0020 | 729-01-00100 | Sign (Type A) | 9 | SQFT | 47.54 | 427.86 | 40.60 | 365.40 | 40.00 | 360.00 | | 0021 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 9 | SQFT | 47.54 | 427.86 | 40.60 | 365.40 | 40.00 | 360.00 | | 0022 | 729-02-00100 | Sign (Type B) | 6 | SQFT | 53.48 | 320.88 | 40.60 | 243.60 | 40.00 | 240.00 | | 0023 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 2,733.16 | 2,733.16 | 3,552.50 | 3,552.50 | 3,607.00 | 3,607.00 | | 0024 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 9,090.73 | 9,090.73 | 10,150.00 | 10,150.00 | 7,664.00 | 7,664.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,063 | EACH | 17.83 | 36,783.29 | 15.45 | 31,873.35 | 27.00 | 55,701.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.018 | MILE | 7,724.15 | 38,759.78 | 6,995.00 | 35,100.91 | 12,880.00 | 64,631.84 | | 0027 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.203 | MILE | 4,753.32 | 964.92 | 4,120.00 | 836.36 | 12,880.00 | 2,614.64 | | 0028 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.12 | MILE | 4,753.32 | 570.40 | 4,120.00 | 494.40 | 25,762.00 | 3,091.44 | | 0029 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 2.784 | MILE | 16,636.62 | 46,316.35 | 14,420.00 | 40,145.28 | 28,338.00 | 78,892.99 | | 0030 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 594.17 | 1,782.51 | 515.00 | 1,545.00 | 4,508.00 | 13,524.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 2.508 | MILE | 26,737.43 | 67,057.47 | 23,175.00 | 58,122.90 | 41,218.00 | 103,374.74 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 178,249.50 | 178,249.50 | 17,500.00 | 17,500.00 | 13,581.00 | 13,581.00 | | 0033 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 2 | LNFT | 10,992.06 | 21,984.12 | 2,777.50 | 5,555.00 | 9,316.00 | 18,632.00 | | 0034 | 811-01-00100 | Cleaning and Painting Steel Plate Girder Spans | 723,704 | LUMP | 14,750,026.78 | 14,750,026.78 | 15,318,122.00 | 15,318,122.00 | 19,865,420.00 | 19,865,420.00 | | 0035 | 811-01-00100 | Cleaning and Painting Truss Spans | 512,354 | LUMP | 16,911,139.39 | 16,911,139.39 | 29,356,346.00 | 29,356,346.00 | 21,693,638.00 | 21,693,638.00 | | 0036 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 3 | SFIN | 48,127.37 | 144,382.11 | 3,333.00 | 9,999.00 | 80,328.00 | 240,984.00 | | 0037 | 815-03-00200 | Joint Seal (Preformed Silicone) | 2,223 | LNFT | 62.99 | 140,026.77 | 109.08 | 242,484.84 | 120.00 | 266,760.00 | | 0038 | 815-03-00300 | Joint Seal (Poured) | 1,944 | LNFT | 28.52 | 55,442.88 | 55.55 | 107,989.20 | 73.00 | 141,912.00 | | 0039 | 822-01-00100 | Trenching and Backfilling | 150 | LNFT | 78.05 | 11,707.50 | 7.56 | 1,133.40 | 10.00 | 1,500.00 | | 0040 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (1#2 Bare Stranded Ground) (E05- Cond #8) | 15 | LNFT | 59.50 | 892.50 | 7.37 | 110.55 | 9.50 | 142.50 | | 0041 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (3#10) (E05- Cond #6) | 1,000 | LNFT | 15.07 | 15,070.00 | 6.56 | 6,560.00 | 8.50 | 8,500.00 | | 0042 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (Sched 80) (4#10) (E05- Cond #3) | 300 | LNFT | 17.43 | 5,229.00 | 8.88 | 2,664.00 | 11.27 | 3,381.00 | | 0043 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (3#8) (E05- Cond #1) | 1 | LNFT | 460.42 | 460.42 | 22.94 | 22.94 | 30.00 | 30.00 | | 0044 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (4#10) (E05- Cond #2) | 1,200 | LNFT | 39.30 | 47,160.00 | 20.95 | 25,140.00 | 26.60 | 31,920.00 | | 0045 | 822-02-03200 | Conduit w Conductors (Liq Tight Flexible Metal) (1") (3#10) (E05- Cond #5) | 10 | LNFT | 155.05 | 1,550.50 | 12.79 | 127.90 | 16.25 | 162.50 | | 0046 | 822-02-03200 | Conduit w Conductors (Liq Tight Flexible Metal) (1") (4#10) (E05- Cond #4) | 5 | LNFT | 444.24 | 2,221.20 | 13.45 | 67.25 | 17.10 | 85.50 | | 0047 | 822-09-00100 | Electrical System (Temporary Aerial Lighting) | 1 | LUMP | 6,631.48 | 6,631.48 | 3,108.44 | 3,108.44 | 3,945.00 | 3,945.00 | | 0048 | 822-09-00100 | Electrical System (Temporary Navigation Lighting) | 1 | LUMP | 34,603.14 | 34,603.14 | 7,105.00 | 7,105.00 | 9,017.00 | 9,017.00 | | 0049 | 822-09-00100 | Electrical System Navigation Lighting and Aerial Beacon System Replacement | 1 | LUMP | 103,220.49 | 103,220.49 | 154,417.03 | 154,417.03 | 195,960.00 | 195,960.00 | | 0050 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Aerial Beacon & Controller) | 1 | LUMP | 9,821.73 | 9,821.73 | 3,552.50 | 3,552.50 | 4,509.00 | 4,509.00 | | 0051 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Disconnects, Conduit, Conductors, & JBs) | 1 | LUMP | 34,101.20 | 34,101.20 | 37,940.70 | 37,940.70 | 48,148.00 | 48,148.00 | | 0052 | 822-14-00100 | Removal and Disposal of Luminaire (Navigation Lighting and Floodlights) | 5 | EACH | 9,821.73 | 49,108.65 | 2,842.00 | 14,210.00 | 3,607.00 | 18,035.00 | | 0053 | 822-16-00200 | Underground Junction Box (11" x 18") (JB1) | 1 | EACH | 1,767.29 | 1,767.29 | 223.30 | 223.30 | 284.00 | 284.00 | | 0054 | 822-21-00100 | Duct Marker (Concrete) | 2 | EACH | 3,865.77 | 7,731.54 | 883.05 | 1,766.10 | 1,121.00 | 2,242.00 | | 0055 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 150 | LNFT | 1.70 | 255.00 | 0.96 | 144.00 | 1.22 | 183.00 | | 0056 | 830-01-00100 | Bridge Superstructure Repair (Access Platform Repair) | 4 | EACH | 42,779.88 | 171,119.52 | 49,161.75 | 196,647.00 | 42,800.00 | 171,200.00 | | 0057 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Repair at PP9 & PP23) | 4 | EACH | 56,445.68 | 225,782.72 | 103,323.00 | 413,292.00 | 47,656.00 | 190,624.00 | | 0058 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Repair) | 2 | EACH | 54,960.27 | 109,920.54 | 31,108.00 | 62,216.00 | 19,148.00 | 38,296.00 | | 0059 | 830-01-00100 | Bridge Superstructure Repair (Arch Tie Splice Repair) | 3 | EACH | 32,203.75 | 96,611.25 | 29,441.50 | 88,324.50 | 30,127.00 | 90,381.00 | | 0060 | 830-01-00100 | Bridge Superstructure Repair (Barrier Type 1) | 1 | EACH | 35,352.82 | 35,352.82 | 3,333.00 | 3,333.00 | 5,195.00 | 5,195.00 | | 0061 | 830-01-00100 | Bridge Superstructure Repair (Barrier Type 2) | 5 | EACH | 11,467.39 | 57,336.95 | 2,444.20 | 12,221.00 | 6,708.00 | 33,540.00 | | 0062 | 830-01-00100 | Bridge Superstructure Repair (Cross Frame Replacement Type 1) | 1 | EACH | 28,817.01 | 28,817.01 | 17,776.00 | 17,776.00 | 34,188.00 | 34,188.00 | | 0063 | 830-01-00100 | Bridge Superstructure Repair (Cross Frame Replacement Type 2) | 5 | EACH | 19,904.53 | 99,522.65 | 16,665.00 | 83,325.00 | 34,193.00 | 170,965.00 | | 0064 | 830-01-00100 | Bridge Superstructure Repair (Diaphragm Repair at L23) | 1 | EACH | 73,527.92 | 73,527.92 | 19,998.00 | 19,998.00 | 32,995.00 | 32,995.00 | | 0065 | 830-01-00100 | Bridge Superstructure Repair (Drain Trough Repair Type 1) | 9 | EACH | 10,041.39 | 90,372.51 | 1,777.60 | 15,998.40 | 3,394.00 | 30,546.00 | | 0066 | 830-01-00100 | Bridge Superstructure Repair (Drain Trough Repair Type 2) | 8 | EACH | 25,786.77 | 206,294.16 | 6,110.50 | 48,884.00 | 3,323.00 | 26,584.00 | | 0067 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 34 East) | 1 | EACH | 325,305.34 | 325,305.34 | 222,200.00 | 222,200.00 | 236,311.00 | 236,311.00 | | 0068 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 34 West) | 1 | EACH | 325,305.34 | 325,305.34 | 222,200.00 | 222,200.00 | 235,600.00 | 235,600.00 | | 0069 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 37 East) | 1 | EACH | 298,567.92 | 298,567.92 | 222,200.00 | 222,200.00 | 227,650.00 | 227,650.00 | | 0070 | 830-01-00100 | Bridge Superstructure Repair (Expansion Bearing Modification at Pier 37 West) | 1 | EACH | 298,567.92 | 298,567.92 | 222,200.00 | 222,200.00 | 227,200.00 | 227,200.00 | | 0071 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L23) | 1 | EACH | 698,143.88 | 698,143.88 | 688,820.00 | 688,820.00 | 2,200,000.00 | 2,200,000.00 | | 0072 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L32) | 1 | EACH | 505,040.25 | 505,040.25 | 344,410.00 | 344,410.00 | 700,000.00 | 700,000.00 | | 0073 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at L9) | 1 | EACH | 698,143.88 | 698,143.88 | 688,820.00 | 688,820.00 | 2,200,000.00 | 2,200,000.00 | | 0074 | 830-01-00100 | Bridge Superstructure Repair (Expansion Dam Modification at U0) | 1 | EACH | 505,040.25 | 505,040.25 | 344,410.00 | 344,410.00 | 800,000.00 | 800,000.00 | | 0075 | 830-01-00100 | Bridge Superstructure Repair (False Chord Bearing Repair) | 4 | EACH | 65,120.49 | 260,481.96 | 31,108.00 | 124,432.00 | 35,200.00 | 140,800.00 | | 0076 | 830-01-00100 | Bridge Superstructure Repair (Floor Beam Stiffener Repair Type 1) | 1 | EACH | 19,013.28 | 19,013.28 | 1,111.00 | 1,111.00 | 600.00 | 600.00 | | 0077 | 830-01-00100 | Bridge Superstructure Repair (Floor Beam Stiffener Repair Type 2) | 6 | EACH | 15,983.04 | 95,898.24 | 2,222.00 | 13,332.00 | 720.00 | 4,320.00 | | 0078 | 830-01-00100 | Bridge Superstructure Repair (Girder End Repair) | 9 | EACH | 2,139.00 | 19,251.00 | 1,666.50 | 14,998.50 | 710.00 | 6,390.00 | | 0079 | 830-01-00100 | Bridge Superstructure Repair (Girder Splice Repair Type 1) | 3 | EACH | 28,222.84 | 84,668.52 | 12,221.00 | 36,663.00 | 16,020.00 | 48,060.00 | | 0080 | 830-01-00100 | Bridge Superstructure Repair (Girder Splice Repair Type 2) | 1 | EACH | 33,718.87 | 33,718.87 | 10,554.50 | 10,554.50 | 20,800.00 | 20,800.00 | | 0081 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 1) | 3 | EACH | 17,444.69 | 52,334.07 | 3,888.50 | 11,665.50 | 13,000.00 | 39,000.00 | | 0082 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 2) | 2 | EACH | 19,161.83 | 38,323.66 | 8,332.50 | 16,665.00 | 18,200.00 | 36,400.00 | | 0083 | 830-01-00100 | Bridge Superstructure Repair (Girder Stiffener Repair Type 3) | 16 | EACH | 6,060.49 | 96,967.84 | 4,444.00 | 71,104.00 | 15,000.00 | 240,000.00 | | 0084 | 830-01-00100 | Bridge Superstructure Repair (Lateral Bracing Repair) | 1 | EACH | 21,687.03 | 21,687.03 | 16,109.50 | 16,109.50 | 26,000.00 | 26,000.00 | | 0085 | 830-01-00100 | Bridge Superstructure Repair (Lower Lateral Strut Repair) | 2 | EACH | 47,533.20 | 95,066.40 | 89,991.00 | 179,982.00 | 35,000.00 | 70,000.00 | | 0086 | 830-01-00100 | Bridge Superstructure Repair (Pin & Hanger Repair at U32) | 1 | EACH | 102,196.38 | 102,196.38 | 124,432.00 | 124,432.00 | 260,000.00 | 260,000.00 | | 0087 | 830-01-00100 | Bridge Superstructure Repair (Pin Joint Modification at L23) | 1 | EACH | 144,976.26 | 144,976.26 | 26,108.50 | 26,108.50 | 30,000.00 | 30,000.00 | | 0088 | 830-01-00100 | Bridge Superstructure Repair (Pin Joint Modification at L9) | 1 | EACH | 135,469.62 | 135,469.62 | 26,108.50 | 26,108.50 | 30,000.00 | 30,000.00 | | 0089 | 830-01-00100 | Bridge Superstructure Repair (Safety Cable System Installation) | 1 | EACH | 3,232,257.60 | 3,232,257.60 | 4,177,360.00 | 4,177,360.00 | 3,218,000.00 | 3,218,000.00 | | 0090 | 830-01-00100 | Bridge Superstructure Repair (Stringer Anchor Bolt Replacement) | 2 | EACH | 5,478.21 | 10,956.42 | 2,777.50 | 5,555.00 | 8,300.00 | 16,600.00 | | 0091 | 830-01-00100 | Bridge Superstructure Repair (Stringer Seat Angle Replacement Type 1) | 60 | EACH | 4,301.76 | 258,105.60 | 1,166.55 | 69,993.00 | 1,900.00 | 114,000.00 | | 0092 | 830-01-00100 | Bridge Superstructure Repair (Stringer Seat Angle Replacement Type 2) | 15 | EACH | 5,810.94 | 87,164.10 | 1,111.00 | 16,665.00 | 1,816.00 | 27,240.00 | | 0093 | 830-01-00100 | Bridge Superstructure Repair (Stringer Shim Plate Repair) | 1 | EACH | 10,694.97 | 10,694.97 | 1,666.50 | 1,666.50 | 225.00 | 225.00 | | 0094 | 830-01-00100 | Bridge Superstructure Repair (Top Chord End Plate Repair) | 4 | EACH | 55,702.97 | 222,811.88 | 6,110.50 | 24,442.00 | 10,400.00 | 41,600.00 | | 0095 | 830-01-00100 | Bridge Superstructure Repair (Top Chord Flange Repair) | 4 | EACH | 26,618.60 | 106,474.40 | 5,888.30 | 23,553.20 | 3,600.00 | 14,400.00 | | 0096 | 830-01-00100 | Bridge Superstructure Repair (Upper Lateral Strut Impact Repair) | 1 | EACH | 152,997.49 | 152,997.49 | 26,664.00 | 26,664.00 | 113,000.00 | 113,000.00 | | 0097 | 830-01-00100 | Bridge Superstructure Repair (Upper Lateral Strut Repair) | 10 | EACH | 33,570.33 | 335,703.30 | 47,773.00 | 477,730.00 | 26,300.00 | 263,000.00 | | 0098 | 830-01-00100 | Bridge Superstructure Repair (Wind Lock Repair) | 2 | EACH | 40,848.85 | 81,697.70 | 19,998.00 | 39,996.00 | 17,400.00 | 34,800.00 | | 0099 | 830-02-00100 | Bridge Substructure Repair (Access Door) | 4 | EACH | 11,140.60 | 44,562.40 | 7,221.50 | 28,886.00 | 8,200.00 | 32,800.00 | | 0100 | 830-02-00100 | Bridge Substructure Repair (Anchor Nut Replacement) | 6 | EACH | 1,734.97 | 10,409.82 | 555.50 | 3,333.00 | 550.00 | 3,300.00 | | 0101 | 830-02-00100 | Bridge Substructure Repair (Anchor Nut Tightening) | 2 | EACH | 4,349.29 | 8,698.58 | 277.75 | 555.50 | 515.00 | 1,030.00 | | 0102 | 830-02-00100 | Bridge Substructure Repair (Riser Repair) | 4 | EACH | 9,435.35 | 37,741.40 | 8,332.50 | 33,330.00 | 12,900.00 | 51,600.00 | | 0103 | 830-07-00100 | Structural Concrete Patching (Barrier) | 16 | SQFT | 1,010.09 | 16,161.44 | 411.07 | 6,577.12 | 300.00 | 4,800.00 | | 0104 | 830-07-00100 | Structural Concrete Patching (Bent Cap) | 87 | SQFT | 505.05 | 43,939.35 | 411.07 | 35,763.09 | 230.00 | 20,010.00 | | 0105 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 1) | 325 | SQFT | 427.80 | 139,035.00 | 411.07 | 133,597.75 | 100.00 | 32,500.00 | | 0106 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 2) | 4 | SQFT | 2,228.12 | 8,912.48 | 411.07 | 1,644.28 | 450.00 | 1,800.00 | | 0107 | 830-07-00100 | Structural Concrete Patching (Bottom of Deck Type 3) | 19 | SQFT | 891.25 | 16,933.75 | 411.07 | 7,810.33 | 251.00 | 4,769.00 | | 0108 | 830-07-00100 | Structural Concrete Patching (Girder End Repair) | 5 | SQFT | 2,245.95 | 11,229.75 | 411.07 | 2,055.35 | 2,150.00 | 10,750.00 | | 0109 | 830-07-00100 | Structural Concrete Patching (Girder) | 14 | SQFT | 623.88 | 8,734.32 | 411.07 | 5,754.98 | 1,000.00 | 14,000.00 | | 0110 | 830-07-00100 | Structural Concrete Patching (Pile or Column) | 20 | SQFT | 475.34 | 9,506.80 | 411.07 | 8,221.40 | 800.00 | 16,000.00 | | 0111 | 830-07-00100 | Structural Concrete Patching (Riser Repair) | 2 | SQFT | 2,079.58 | 4,159.16 | 411.07 | 822.14 | 1,280.00 | 2,560.00 | | 0112 | 830-07-00100 | Structural Concrete Patching (Top of Deck) | 96 | SQFT | 249.55 | 23,956.80 | 411.07 | 39,462.72 | 330.00 | 31,680.00 | | 0113 | 830-09-00100 | Structure Jacking | 1 | LUMP | 237,666.00 | 237,666.00 | 47,217.50 | 47,217.50 | 90,000.00 | 90,000.00 | | 0114 | 830-10-00100 | Epoxy Injection | 78 | LNFT | 196.08 | 15,294.24 | 333.30 | 25,997.40 | 216.00 | 16,848.00 | | 0115 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 6,000 | EACH | 173.50 | 1,041,000.00 | 161.10 | 966,600.00 | 175.00 | 1,050,000.00 | | 0116 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 2 | EACH | 12,203.54 | 24,407.08 | 1.00 | 2.00 | 12,600.00 | 25,200.00 | | 0117 | NS-818-00001 | Navigation Clearance Gauge (Mounted) | 2 | EACH | 58,673.80 | 117,347.60 | 83,325.00 | 166,650.00 | 24,620.00 | 49,240.00 | | 0118 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 10 | LNFT | 2,043.93 | 20,439.30 | 1,388.75 | 13,887.50 | 3,200.00 | 32,000.00 | | 0119 | NS-830-00800 | Latex Modified Concrete Overlay | 1,988 | SFIN | 46.35 | 92,143.80 | 55.55 | 110,433.40 | 13.00 | 25,844.00 | | 0120 | NS-830-01000 | Bridge Deck Joint Repair (One Side of Joint) | 8 | LNFT | 3,683.83 | 29,470.64 | 2,055.35 | 16,442.80 | 830.00 | 6,640.00 | | 0121 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs (Girder) | 102 | SQFT | 148.55 | 15,152.10 | 616.61 | 62,894.22 | 620.00 | 63,240.00 | | 0122 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs (Pile or Column) | 88 | SQFT | 101.01 | 8,888.88 | 616.61 | 54,261.68 | 520.00 | 45,760.00 | | 0123 | NS-830-01800 | Methyl Methacrylate Concrete Sealer | 451,670 | SQFT | 1.97 | 889,789.90 | 1.49 | 672,988.30 | 2.50 | 1,129,175.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 53,488,999.99 | | 66,247,088.49 | | 66,681,937.94 |
|