Proposal:H.011260.6
Parish:St. Tammany
Routes:US 190B
Description:US 190B @ JEFFERSON AVE. ROUNDABOUT
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,209,570.75
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $2,045,989.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 3 | LUMP | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 55,000.00 | 55,000.00 | | 0003 | 202-02-00010 | Removal of Chevron Sign | 1 | EACH | 4,000.00 | 4,000.00 | | 0004 | 202-02-00020 | Removal of Concrete Footing | 2 | SQYD | 1,200.00 | 2,400.00 | | 0005 | 202-02-02000 | Removal of Asphalt Drives | 241 | SQYD | 40.00 | 9,640.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 500.3 | SQYD | 40.00 | 20,012.00 | | 0007 | 202-02-03030 | Removal of Pavement Structure | 1,010.2 | SQYD | 40.00 | 40,408.00 | | 0008 | 202-02-03030 | Removal of Pavement Structure | 104.9 | SQYD | 40.00 | 4,196.00 | | 0009 | 202-02-03030 | Removal of Pavement Structure | 65.1 | SQYD | 40.00 | 2,604.00 | | 0010 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,075 | SQYD | 40.00 | 43,000.00 | | 0011 | 202-02-06140 | Removal of Curbs (Concrete) | 440 | LNFT | 25.00 | 11,000.00 | | 0012 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 35,000.00 | 35,000.00 | | 0013 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 10,000.00 | 10,000.00 | | 0014 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | | 0015 | 203-10-00100 | Cleaning Existing Ditches | 641 | LNFT | 1.00 | 641.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 60 | EACH | 5.00 | 300.00 | | 0017 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 3 | EACH | 100.00 | 300.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 959 | LNFT | 1.00 | 959.00 | | 0019 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 1,100.00 | 2,200.00 | | 0020 | 302-02-07000 | Class II Base Course (7" Thick) (Asphalt Concrete Base) | 1,484 | SQYD | 75.00 | 111,300.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2 | CUYD | 300.00 | 600.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 7.8 | CUYD | 300.00 | 2,340.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 1,339.3 | TON | 225.00 | 301,342.50 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 12.1 | TON | 495.00 | 5,989.50 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 5,023 | SQYD | 6.50 | 32,649.50 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -271 | CUYD | 0.10 | -27.10 | | 0027 | 510-01-00001 | Pavement Patching 5" Minimum Thickness | 3 | SQYD | 1,500.00 | 4,500.00 | | 0028 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 4 | SQYD | 1,000.00 | 4,000.00 | | 0029 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 60 | SQYD | 225.00 | 13,500.00 | | 0030 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 11" Thickness | 57.9 | SQYD | 200.00 | 11,580.00 | | 0031 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 14" Thickness | 279.3 | SQYD | 200.00 | 55,860.00 | | 0032 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 669 | LNFT | 170.00 | 113,730.00 | | 0033 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 76 | LNFT | 200.00 | 15,200.00 | | 0034 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 46 | LNFT | 250.00 | 11,500.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 6,000.00 | 48,000.00 | | 0036 | 702-03-00500 | Catch Basins (CB-06) | 6 | EACH | 8,000.00 | 48,000.00 | | 0037 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 9,000.00 | 9,000.00 | | 0038 | 706-01-00100 | Concrete Walk (4" Thick) | 654 | SQYD | 85.00 | 55,590.00 | | 0039 | 706-01-00300 | Concrete Walk (6" Thick) | 5.6 | SQYD | 285.00 | 1,596.00 | | 0040 | 706-02-00200 | Concrete Drive (6" Thick) | 524.9 | SQYD | 95.00 | 49,865.50 | | 0041 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 2,800.00 | 16,800.00 | | 0042 | 707-01-00100 | Concrete Curb | 56.5 | LNFT | 60.00 | 3,390.00 | | 0043 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,841.9 | LNFT | 50.00 | 92,095.00 | | 0044 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 800.00 | 5,600.00 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 185,000.00 | 185,000.00 | | 0046 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 69 | LNFT | 3.30 | 227.70 | | 0047 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 58 | LNFT | 7.70 | 446.60 | | 0048 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.344 | MILE | 825.00 | 1,108.80 | | 0049 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.138 | MILE | 825.00 | 1,763.85 | | 0050 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.039 | MILE | 13,200.00 | 514.80 | | 0051 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.955 | MILE | 2,200.00 | 4,301.00 | | 0052 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.039 | MILE | 24,750.00 | 965.25 | | 0053 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 15,000.00 | 60,000.00 | | 0054 | 726-01-00100 | Bedding Material | 77.7 | CUYD | 1.00 | 77.70 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 255,000.00 | 255,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 54.1 | SQFT | 42.00 | 2,272.20 | | 0057 | 729-02-00100 | Sign (Type B) | 314.6 | SQFT | 45.00 | 14,157.00 | | 0058 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 31 | EACH | 200.00 | 6,200.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 133 | EACH | 23.00 | 3,059.00 | | 0060 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 141 | LNFT | 23.00 | 3,243.00 | | 0061 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 1,225 | LNFT | 5.00 | 6,125.00 | | 0062 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 255 | LNFT | 6.00 | 1,530.00 | | 0063 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 107 | LNFT | 19.00 | 2,033.00 | | 0064 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 64 | LNFT | 28.00 | 1,792.00 | | 0065 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 27 | LNFT | 28.00 | 756.00 | | 0066 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 29 | LNFT | 28.00 | 812.00 | | 0067 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.598 | MILE | 11,000.00 | 6,578.00 | | 0068 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 6 | EACH | 1,400.00 | 8,400.00 | | 0069 | 732-05-00100 | Removal of Existing Markings | 0.012 | MILE | 40,000.00 | 480.00 | | 0070 | 739-01-00100 | Hydro-Seeding | 0.33 | ACRE | 1,500.00 | 495.00 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | | 0072 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 27,707 | INLF | 1.65 | 45,716.55 | | 0073 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 486 | INLF | 9.00 | 4,374.00 | | 0074 | NS-702-00100 | Paved Gutter Drain | 3 | EACH | 9,000.00 | 27,000.00 | | 0075 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 1,500.00 | 1,500.00 | | 0076 | NS-719-00002 | Tree Trimming | 1 | LUMP | 1,000.00 | 1,000.00 | | 0077 | NS-719-00003 | Root Pruning | 1 | LUMP | 1,000.00 | 1,000.00 | | 0078 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 8 | SQYD | 300.00 | 2,400.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,045,989.35 |
|