Bid Tabulations for the Letting of 5/4/2022 LA DOTD Headquarters

Proposal:H.002184.6-R1
Parish:Pointe Coupee
Routes:LA 413
Description:BAYOU CHENAL & BAYOU DISCHARGE BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PERMANENT SHEETING (STEEL), PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$6,112,363.94
Rank License BidderConstruction Bid
139462JB JAMES CONSTRUCTION LLC$7,294,692.15
212312GILCHRIST CONSTRUCTION COMPANY, LLC$8,973,479.82
300009Coastal Contractors, LLC$9,324,099.79
436827Shavers-Whittle Construction LLC$9,353,004.97


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
JB JAMES CONSTRUCTION LLC
- 2 -
GILCHRIST CONSTRUCTION COMPANY, LLC
- 3 -
Coastal Contractors, LLC
- 4 -
Shavers-Whittle Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 4.66  LUMP400,000.00400,000.00500,000.00500,000.00100,000.00100,000.00140,000.00140,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP35,000.0035,000.0050,000.0050,000.0020,000.0020,000.005,000.005,000.00
0003202-02-02020Removal of Asphalt Pavement 4,469.1   SQYD8.0035,752.8014.0062,567.4014.0062,567.4016.0071,505.60
0004202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 4,469.1   SQYD6.0026,814.6010.0044,691.0014.0062,567.4016.7574,857.43
0005202-02-04501Removal of Bridge Bridges: Str. No. 613902270402681, 172' X 25'4,300     LUMP130,000.00130,000.00100,000.00100,000.0090,000.0090,000.00200,000.00200,000.00
0006202-02-04501Removal of Bridge Bridges: Str. No. 61392270400371, 191' X 25.5'4,871     LUMP130,000.00130,000.00100,000.00100,000.00100,000.00100,000.00200,000.00200,000.00
0007202-02-06100Removal of Concrete Walks and Drives 231     SQYD20.004,620.0050.0011,550.0016.003,696.0010.002,310.00
0008202-02-12000Removal of Fence 147     LNFT8.001,176.009.001,323.0010.001,470.005.00735.00
0009202-02-14000Removal of Gas Line 386     LNFT14.005,404.004.001,544.0040.0015,440.0010.003,860.00
0010202-02-14500Removal of Guard Rail 1,212.8   LNFT9.0010,915.2010.0012,128.0012.0014,553.608.009,702.40
0011203-02-00100Drainage Excavation 1,057     CUYD30.0031,710.0020.0021,140.0045.0047,565.0023.0024,311.00
0012203-04-00200Nonplastic Embankment (Sand) Nonplastic Embankment97.1   CUYD120.0011,652.0050.004,855.0065.006,311.5095.009,224.50
0013203-05-00100Excavation and Embankment 1     LUMP150,000.00150,000.00250,000.00250,000.00125,000.00125,000.00200,000.00200,000.00
0014204-05-00100Temporary Sediment Check Dams (Hay) 17     EACH150.002,550.00190.003,230.00160.002,720.00160.002,720.00
0015204-06-00100Temporary Silt Fencing 1,787     LNFT3.005,361.002.504,467.502.003,574.003.005,361.00
0016302-02-12010Class II Base Course (12" Thick) (Soil Cement) 4,926.2   SQYD30.00147,786.0040.00197,048.0044.00216,752.8028.00137,933.60
0017304-01-00100Lime 69.83  TON250.0017,457.50250.0017,457.50350.0024,440.50300.0020,949.00
0018304-05-00100Lime Treatment (Type E) 4,926     SQYD3.0014,778.0012.0059,112.005.6027,585.6010.0049,260.00
0019309-01-12000In-Place Cement Treated Subgrade (12" Thick) 4,926     SQYD18.0088,668.0025.00123,150.0029.00142,854.0030.00147,780.00
0020502-01-00100Asphalt Concrete 1,451.9   TON133.00193,102.70175.00254,082.50170.00246,823.00165.00239,563.50
0021502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 463.5   TON169.0078,331.50300.00139,050.00225.00104,287.50195.0090,382.50
0022510-01-00001Pavement Patching (13" Minimum Thickness)172     SQYD188.0032,336.00150.0025,800.00175.0030,100.00195.0033,540.00
0023701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 52     LNFT240.0012,480.00350.0018,200.00270.0014,040.00275.0014,300.00
0024701-05-01042Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) 134     LNFT120.0016,080.00140.0018,760.00155.0020,770.00150.0020,100.00
0025701-05-02041Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CMP) 40     LNFT120.004,800.00200.008,000.00160.006,400.00175.007,000.00
0026704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 337.5   LNFT24.008,100.0040.0013,500.0040.0013,500.0032.0010,800.00
0027704-07-00200Guard Rail Transitions (Double Thrie Beam) 175     LNFT110.0019,250.00115.0020,125.00125.0021,875.00130.0022,750.00
0028704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 3     EACH2,950.008,850.003,300.009,900.003,500.0010,500.004,200.0012,600.00
0029704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 1     EACH3,350.003,350.004,000.004,000.004,000.004,000.004,200.004,200.00
0030704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 2     EACH2,950.005,900.003,300.006,600.003,300.006,600.004,200.008,400.00
0031705-01-00100Barbed Wire Fence 147     LNFT15.002,205.0016.002,352.0027.003,969.0017.502,572.50
0032706-02-00100Concrete Drive (4" Thick) 209     SQYD90.0018,810.00200.0041,800.00130.0027,170.0090.0018,810.00
0033708-01-00100Right-of-Way Monument 36     EACH650.0023,400.00800.0028,800.00700.0025,200.00700.0025,200.00
0034711-01-04020Riprap (55 lb, 24" Thick) 1,128     SQYD90.00101,520.00120.00135,360.0090.00101,520.00110.00124,080.00
0035711-04-00100Geotextile Fabric 1,128     SQYD4.004,512.0010.0011,280.004.505,076.005.506,204.00
0036713-01-00100Temporary Signs and Barricades 1     LUMP100,000.00100,000.00100,000.00100,000.00110,000.00110,000.0075,000.0075,000.00
0037717-01-00100Seeding 93     LB25.002,325.0026.002,418.0018.001,674.0030.002,790.00
0038718-01-00100Fertilizer 3,100     LB1.003,100.001.003,100.000.852,635.001.253,875.00
0039720-01-01000Erosion Control System (Slope Protection) (Type A) 872     SQYD2.001,744.002.251,962.001.501,308.002.251,962.00
0040720-01-02020Erosion Control System, Flexible (Channel Liner) (Type D) 469     SQYD5.002,345.005.502,579.501.75820.755.502,579.50
0041722-02-00100Project Site Laboratory (Equipped) 1     EACH20,000.0020,000.0025,000.0025,000.0055,000.0055,000.0024,000.0024,000.00
0042725-01-00100Temporary Detour Roads 1,899.3   SQYD170.00322,881.00210.00398,853.00250.00474,825.00160.00303,888.00
0043726-01-00100Bedding Material 22     CUYD100.002,200.00200.004,400.00170.003,740.0080.001,760.00
0044727-01-00100Mobilization 1     LUMP700,000.00700,000.00800,000.00800,000.00500,000.00500,000.00930,000.00930,000.00
0045729-16-00300Object Marker Assembly (Type 3) 8     EACH95.00760.0080.00640.0085.00680.0085.00680.00
0046731-02-00100Reflectorized Raised Pavement Markers 96     EACH8.50816.0014.001,344.0016.001,536.0022.002,112.00
0047732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.021 MILE5,000.005,105.009,000.009,189.0010,000.0010,210.0011,000.0011,231.00
0048732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.362 MILE2,500.00905.003,200.001,158.403,700.001,339.405,500.001,991.00
0049735-01-00100Mailboxes 14     EACH25.00350.0015.00210.0015.00210.0027.00378.00
0050735-02-00100Mailbox Supports (Single) 10     EACH195.001,950.00260.002,600.00290.002,900.00210.002,100.00
0051735-03-00100Mailbox Supports (Double) 1     EACH225.00225.00350.00350.00400.00400.00240.00240.00
0052740-01-00100Construction Layout 1     LUMP60,000.0060,000.0050,000.0050,000.0048,000.0048,000.00250,000.00250,000.00
0053740-02-00100Utility Oversight and Coordination 1     LUMP10,000.0010,000.0020,000.0020,000.0035,000.0035,000.0010,000.0010,000.00
0054802-02-00100Permanent Sheeting (Steel) 6,620     SQFT80.00529,600.0060.00397,200.0095.00628,900.0080.00529,600.00
0055804-01-00400Precast Concrete Piles (18") 7,750     LNFT100.00775,000.00130.001,007,500.00145.001,123,750.00140.001,085,000.00
0056804-10-00400Precast Concrete Indicator Piles (18") 2     EACH150,000.00300,000.00100,000.00200,000.0019,000.0038,000.0050,000.00100,000.00
0057804-14-00100Dynamic Monitoring Assistance 14     EACH1,600.0022,400.005,000.0070,000.002,500.0035,000.003,500.0049,000.00
0058804-17-00100Construction Site Survey 1     LUMP30,000.0030,000.0025,000.0025,000.0025,000.0025,000.0025,000.0025,000.00
0059804-18-00100Vibration Monitoring 35     DAY800.0028,000.001,000.0035,000.00900.0031,500.00700.0024,500.00
0060805-01-00100Class A1 Concrete (Slab Span) 641.89  CUYD900.00577,701.001,100.00706,079.002,150.001,380,063.501,750.001,123,307.50
0061805-01-00300Class A1 Concrete (Bent Cap) 184.72  CUYD1,700.00314,024.003,000.00554,160.003,200.00591,104.002,000.00369,440.00
0062805-18-00100Concrete Finish (Class 2 Rubbed Finish) 5,453.36  SQFT0.603,272.023.0016,360.082.2011,997.392.0010,906.72
0063805-18-00200Concrete Finish (Class 3 Special Finish) 5,453.36  SQFT1.206,544.034.0021,813.443.2017,450.752.0010,906.72
0064806-01-00100Deformed Reinforcing Steel 161,772     LB1.90307,366.802.00323,544.001.80291,189.601.75283,101.00
0065810-01-00120Concrete Bridge Railing (36 inch Height) 800     LNFT130.00104,000.00225.00180,000.00180.00144,000.00250.00200,000.00
0066813-01-00100Concrete Approach Slabs (Cast-in-Place) 5,120     SQFT90.00460,800.00110.00563,200.00125.00640,000.00120.00614,400.00
0067814-01-00100Elastomeric Bearing Pads (Non-Reinforced) 544     SFIN90.0048,960.00100.0054,400.0095.0051,680.00100.0054,400.00
0068815-03-00300Joint Seal (Poured) 764     LNFT20.0015,280.0022.0016,808.0018.5014,134.0016.0012,224.00
0069817-01-00100Temporary Detour Bridge (Concrete) 160'-0" Detour Bridge4,267     SQFT160.00682,720.00240.001,024,080.00290.001,237,430.00275.001,173,425.00
0070NS-201-00005Arborist Services 1     LUMP5,000.005,000.0017,500.0017,500.0012,000.0012,000.0020,000.0020,000.00
0071NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 384     LNFT5.001,920.007.002,688.005.802,227.2027.0010,368.00
0072NS-500-00260Sawcuts in Asphalt Concrete Lifts 640     LNFT3.001,920.004.002,560.003.502,240.0013.008,320.00
0073NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,403     INLF2.002,806.003.504,910.502.303,226.902.503,507.50
0074NS-700-00840Impact Attenuator (Reusable, Test Level 3) 2     EACH30,000.0060,000.0012,500.0025,000.0042,000.0084,000.0037,500.0075,000.00
             
  CONTRACTOR TOTAL   7,294,692.15 8,973,479.82 9,324,099.79 9,353,004.97