Proposal:H.014488.6
Parish:Evangeline
Routes:LA 1165
Description:LA 1165: LA 29 - LA 104
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, PLASTIC PAVEMENT STRIPING AND RELATED WORK
Estimated Construction Cost:$3,896,491.06
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $4,389,741.28 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $4,804,386.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 10,000.00 | 10,000.00 | 56,500.00 | 56,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 546.6 | SQYD | 25.00 | 13,665.00 | 25.00 | 13,665.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 394.8 | SQYD | 25.00 | 9,870.00 | 25.00 | 9,870.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 114" | 156 | LNFT | 10.00 | 1,560.00 | 100.00 | 15,600.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" - 66" | 496 | LNFT | 10.00 | 4,960.00 | 30.00 | 14,880.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,586.5 | CUYD | 12.00 | 19,038.00 | 30.00 | 47,595.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 48 | EACH | 185.00 | 8,880.00 | 160.00 | 7,680.00 | | 0008 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 56,222 | SQYD | 9.00 | 505,998.00 | 9.00 | 505,998.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 150 | SQYD | 10.00 | 1,500.00 | 35.00 | 5,250.00 | | 0010 | 304-01-00100 | Lime | 110 | TON | 400.00 | 44,000.00 | 250.00 | 27,500.00 | | 0011 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 13,915 | SQYD | 3.00 | 41,745.00 | 6.00 | 83,490.00 | | 0012 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 55,658 | SQYD | 9.00 | 500,922.00 | 9.00 | 500,922.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,240.74 | CUYD | 49.00 | 60,796.26 | 60.00 | 74,444.40 | | 0014 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 275 | SQYD | 65.00 | 17,875.00 | 40.00 | 11,000.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 12,000.8 | TON | 114.00 | 1,368,091.20 | 115.00 | 1,380,092.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 943.9 | TON | 80.00 | 75,512.00 | 115.00 | 108,548.50 | | 0017 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 36,334 | GAL | 3.75 | 136,252.50 | 3.50 | 127,169.00 | | 0018 | 507-02-00200 | Aggregate (S2) | 53,432 | SQYD | 1.90 | 101,520.80 | 2.00 | 106,864.00 | | 0019 | 507-02-00300 | Aggregate (S3) | 53,432 | SQYD | 1.60 | 85,491.20 | 1.50 | 80,148.00 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 45,295 | SQYD | 2.00 | 90,590.00 | 3.00 | 135,885.00 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,424 | CUYD | 0.01 | -14.24 | 1.00 | -1,424.00 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 72.7 | SQYD | 180.00 | 13,086.00 | 170.00 | 12,359.00 | | 0023 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 54 | LNFT | 300.00 | 16,200.00 | 450.00 | 24,300.00 | | 0024 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 322 | LNFT | 325.00 | 104,650.00 | 450.00 | 144,900.00 | | 0025 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | 108 | LNFT | 675.00 | 72,900.00 | 800.00 | 86,400.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 301 | SQYD | 85.00 | 25,585.00 | 120.00 | 36,120.00 | | 0027 | 712-02-00100 | Sacked Concrete Revetment | 208 | SQYD | 160.00 | 33,280.00 | 375.00 | 78,000.00 | | 0028 | 712-04-00100 | Flexible Revetment | 138 | SQYD | 135.00 | 18,630.00 | 70.00 | 9,660.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 70,000.00 | 70,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.343 | MILE | 1.00 | 11.34 | 300.00 | 3,402.90 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.124 | MILE | 1.00 | 8.12 | 1.00 | 8.12 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.198 | MILE | 1.00 | 33.20 | 1.00 | 33.20 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,999 | EACH | 2.75 | 5,497.25 | 3.00 | 5,997.00 | | 0034 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 10,000.00 | 20,000.00 | 10,000.00 | 20,000.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.602 | MILE | 1,200.00 | 9,122.40 | 950.00 | 7,221.90 | | 0037 | 726-01-00100 | Bedding Material | 241.4 | CUYD | 95.00 | 22,933.00 | 90.00 | 21,726.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | 460,000.00 | 460,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 26 | EACH | 70.00 | 1,820.00 | 65.00 | 1,690.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 100.00 | 400.00 | | 0041 | 729-19-00300 | Dead End Road Installations (Type C) | 3 | EACH | 1,250.00 | 3,750.00 | 1,000.00 | 3,000.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 759 | EACH | 10.00 | 7,590.00 | 9.00 | 6,831.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.96 | MILE | 5,500.00 | 60,280.00 | 5,000.00 | 54,800.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.691 | MILE | 2,750.00 | 7,400.25 | 2,500.00 | 6,727.50 | | 0045 | 735-01-00100 | Mailboxes | 48 | EACH | 25.00 | 1,200.00 | 21.00 | 1,008.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 48 | EACH | 250.00 | 12,000.00 | 250.00 | 12,000.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 | | 0048 | 805-15-01700 | Reinforced Concrete Box Culverts (Precast) (7' x 7') | 216 | LNFT | 1,750.00 | 378,000.00 | 1,400.00 | 302,400.00 | | 0049 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (2404.6 lbs Steel) & (35.6 cu. yds. Concrete) | 2 | EACH | 20,000.00 | 40,000.00 | 42,000.00 | 84,000.00 | | 0050 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,320 | INLF | 3.50 | 4,620.00 | 3.50 | 4,620.00 | | 0051 | 739-01-00100 | Hydro-Seeding | 2.035 | ACRE | 3,200.00 | 6,512.00 | 3,000.00 | 6,105.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,389,741.28 | | 4,804,386.52 |
|