Proposal:H.012913.6-R2
Parish:Bossier
Routes:I-20
Description:I-20 EB: EXIT RAMP EXTENSION AT LA 157
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, THIN ASPHALT CONCRETE (OGFC), ASPHALT CONRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost:$423,005.08
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $846,087.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 40,000.00 | 40,000.00 | | 0002 | 202-02-00010 | Removal of Shoulder Outlet Underdrains | 5 | EACH | 500.00 | 2,500.00 | | 0003 | 202-02-32180 | Removal of Pipe Headwalls Headwall for Pipe Extension | 1 | EACH | 1,500.00 | 1,500.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 120,000.00 | 120,000.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 240 | SQYD | 5.00 | 1,200.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,020 | LNFT | 2.00 | 4,040.00 | | 0007 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 91.7 | SQYD | 100.00 | 9,170.00 | | 0008 | 302-02-12000 | Class II Base Course (12" Thick) | 971.5 | SQYD | 75.00 | 72,862.50 | | 0009 | 304-01-00100 | Lime | 15.07 | TON | 450.00 | 6,781.50 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 1,063 | SQYD | 6.00 | 6,378.00 | | 0011 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 72.5 | TON | 800.00 | 58,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 798.2 | TON | 218.25 | 174,207.15 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 1,322 | SQYD | 7.00 | 9,254.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -109 | CUYD | 0.10 | -10.90 | | 0015 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 250.00 | 2,000.00 | | 0016 | 701-15-00100 | Concrete Collar | 1 | EACH | 750.00 | 750.00 | | 0017 | 702-07-00100 | Cross Drain Safety End (Type 1) | 1 | EACH | 4,000.00 | 4,000.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | | 0019 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 200 | LNFT | 5.00 | 1,000.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.574 | MILE | 1,000.00 | 574.00 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.574 | MILE | 4,000.00 | 2,296.00 | | 0022 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 5,000.00 | 10,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 4 | TON | 850.00 | 3,400.00 | | 0024 | 717-01-00100 | Seeding | 120 | LB | 12.50 | 1,500.00 | | 0025 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.60 | 1,200.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.191 | MILE | 40,000.00 | 7,640.00 | | 0027 | 726-01-00100 | Bedding Material | 2.4 | CUYD | 500.00 | 1,200.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | | 0029 | 729-01-00103 | Sign (Type A)(Relocate) | 12 | SQFT | 200.00 | 2,400.00 | | 0030 | 729-04-00103 | Sign (Type D)(Relocate) | 162.5 | SQFT | 100.00 | 16,250.00 | | 0031 | 729-05-00103 | Sign (Type E)(Relocate) | 17 | SQFT | 300.00 | 5,100.00 | | 0032 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 3,500.00 | 3,500.00 | | 0033 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 2 | EACH | 5,000.00 | 10,000.00 | | 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 150.00 | 150.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 90 | EACH | 20.00 | 1,800.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 507 | LNFT | 20.00 | 10,140.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.191 | MILE | 40,000.00 | 7,640.00 | | 0038 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.112 | MILE | 25,000.00 | 2,800.00 | | 0039 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.181 | MILE | 15,000.00 | 2,715.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 0.246 | MILE | 25,000.00 | 6,150.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | | 0042 | NS-DEV-70302 | Draincrete Shoulder Outlet Underdrains | 180 | LNFT | 200.00 | 36,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 846,087.25 |
|