Proposal:H.012566.6
Parish:Bienville
Routes:LA 154
Description:LA 154: LA 507 TO LA 793
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,077,212.07
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $5,551,097.60 |
| 2 | 67822 | Earnest Contracting LLC | $6,295,632.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 1,800 | LNFT | 13.00 | 23,400.00 | 5.00 | 9,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) Station 340+89 (2) 36" CMP x 68' | 136 | LNFT | 15.00 | 2,040.00 | 150.00 | 20,400.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,450 | CUYD | 28.25 | 153,962.50 | 30.00 | 163,500.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 3,368 | LNFT | 2.50 | 8,420.00 | 2.50 | 8,420.00 | | 0005 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 589.2 | CUYD | 1.00 | 589.20 | 65.00 | 38,298.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 35,903.2 | TON | 115.00 | 4,128,868.00 | 134.85 | 4,841,546.52 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,363.7 | TON | 85.00 | 115,914.50 | 134.40 | 183,281.28 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 5,497 | SQYD | 7.50 | 41,227.50 | 5.00 | 27,485.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -395 | CUYD | 0.01 | -3.95 | 0.10 | -39.50 | | 0010 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 286 | SQYD | 98.00 | 28,028.00 | 59.50 | 17,017.00 | | 0011 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 136 | LNFT | 325.00 | 44,200.00 | 550.00 | 74,800.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 68 | LNFT | 3.00 | 204.00 | 75.00 | 5,100.00 | | 0013 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 542 | LNFT | 130.00 | 70,460.00 | 148.00 | 80,216.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,229.5 | LNFT | 31.00 | 38,114.50 | 38.00 | 46,721.00 | | 0015 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 20 | EACH | 3,500.00 | 70,000.00 | 3,800.00 | 76,000.00 | | 0016 | 710-01-00100 | Flowable Fill | 3 | CUYD | 250.00 | 750.00 | 600.00 | 1,800.00 | | 0017 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 40 | SQYD | 115.00 | 4,600.00 | 300.00 | 12,000.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 20.28 | MILE | 475.00 | 9,633.00 | 500.00 | 10,140.00 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.248 | MILE | 900.00 | 5,623.20 | 900.00 | 5,623.20 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 74.004 | MILE | 1,300.00 | 96,205.20 | 1,300.00 | 96,205.20 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 24.4 | TON | 700.00 | 17,080.00 | 850.00 | 20,740.00 | | 0023 | 717-01-00100 | Seeding | 732 | LB | 14.00 | 10,248.00 | 14.00 | 10,248.00 | | 0024 | 718-01-00100 | Fertilizer | 12,200 | LB | 0.65 | 7,930.00 | 0.75 | 9,150.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 10.141 | MILE | 1,000.00 | 10,141.00 | 1,000.00 | 10,141.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 20.282 | MILE | 1,000.00 | 20,282.00 | 1,000.00 | 20,282.00 | | 0027 | 726-01-00100 | Bedding Material | 13.9 | CUYD | 110.00 | 1,529.00 | 100.00 | 1,390.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | | 0029 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 81 | SQFT | 50.00 | 4,050.00 | 38.00 | 3,078.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 110.00 | 2,200.00 | 110.00 | 2,200.00 | | 0031 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 10 | EACH | 150.00 | 1,500.00 | 150.00 | 1,500.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,265 | EACH | 7.25 | 16,421.25 | 7.25 | 16,421.25 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 37.002 | MILE | 4,650.00 | 172,059.30 | 4,650.00 | 172,059.30 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.124 | MILE | 2,350.00 | 7,341.40 | 2,350.00 | 7,341.40 | | 0035 | 735-01-00100 | Mailboxes | 18 | EACH | 5.00 | 90.00 | 1.00 | 18.00 | | 0036 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 170.00 | 2,720.00 | 200.00 | 3,200.00 | | 0037 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 270.00 | 270.00 | 350.00 | 350.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,551,097.60 | | 6,295,632.65 |
|