Proposal:H.011645.6-R1
Parish:Livingston
Routes:LA 3002
Description:LA 3002: ACCESS MANAGEMENT
Type Construction:GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, METHYL METHACRYLATE PAVEMENT MARKINGS, INTELLIGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$2,528,904.02
| Rank | License | Bidder | Construction Bid |
| 1 | 46747 | Triumph Construction, LLC | $4,555,000.00 |
| 2 | 54663 | CAPE Construction, LLC | $5,046,145.73 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,084,347.94 |
| 4 | 48896 | Command Construction Industries LLC | $5,162,162.16 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Triumph Construction, LLC | - 2 - CAPE Construction, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Flashing Beacons | 2 | EACH | 590.30 | 1,180.60 | 4,600.00 | 9,200.00 | 1,600.00 | 3,200.00 | 5,000.00 | 10,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 25.6 | SQYD | 22.65 | 579.84 | 55.20 | 1,413.12 | 20.00 | 512.00 | 30.00 | 768.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 626 | SQYD | 22.75 | 14,241.50 | 18.40 | 11,518.40 | 22.00 | 13,772.00 | 30.00 | 18,780.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 639 | LNFT | 23.80 | 15,208.20 | 13.80 | 8,818.20 | 12.00 | 7,668.00 | 30.00 | 19,170.00 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 12 | LNFT | 111.30 | 1,335.60 | 31.05 | 372.60 | 30.00 | 360.00 | 30.00 | 360.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 2,223 | SQYD | 16.05 | 35,679.15 | 13.80 | 30,677.40 | 20.00 | 44,460.00 | 30.00 | 66,690.00 | | 0007 | 202-02-38300 | Removal of Sign and U-Channel Post | 9 | EACH | 11.85 | 106.65 | 149.50 | 1,345.50 | 15.00 | 135.00 | 200.00 | 1,800.00 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 33,416.90 | 33,416.90 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0009 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 10,805.65 | 10,805.65 | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0010 | 203-01-00100 | General Excavation | 112 | CUYD | 12.00 | 1,344.00 | 40.25 | 4,508.00 | 125.00 | 14,000.00 | 100.00 | 11,200.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 67 | CUYD | 67.90 | 4,549.30 | 28.75 | 1,926.25 | 175.00 | 11,725.00 | 50.00 | 3,350.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 32.55 | 3,255.00 | 20.70 | 2,070.00 | 15.00 | 1,500.00 | 5.00 | 500.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 800 | LNFT | 1.65 | 1,320.00 | 4.60 | 3,680.00 | 1.50 | 1,200.00 | 5.00 | 4,000.00 | | 0014 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,394.4 | SQYD | 91.25 | 218,489.00 | 65.75 | 157,431.80 | 55.00 | 131,692.00 | 25.00 | 59,860.00 | | 0015 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 142.7 | SQYD | 162.10 | 23,131.67 | 230.00 | 32,821.00 | 200.00 | 28,540.00 | 300.00 | 42,810.00 | | 0016 | 602-08-00100 | Diamond Grinding Concrete Pavement | 2,247.7 | SQYD | 65.00 | 146,100.50 | 75.90 | 170,600.43 | 22.00 | 49,449.40 | 50.00 | 112,385.00 | | 0017 | 602-16-00100 | High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching | 1,123.9 | SQYD | 119.70 | 134,530.83 | 379.50 | 426,520.05 | 500.00 | 561,950.00 | 400.00 | 449,560.00 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 15 | LNFT | 123.75 | 1,856.25 | 207.00 | 3,105.00 | 250.00 | 3,750.00 | 200.00 | 3,000.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 69 | LNFT | 119.85 | 8,269.65 | 253.00 | 17,457.00 | 250.00 | 17,250.00 | 225.00 | 15,525.00 | | 0020 | 701-07-00300 | Yard Drain Pipe (8") | 7 | LNFT | 102.55 | 717.85 | 69.00 | 483.00 | 100.00 | 700.00 | 75.00 | 525.00 | | 0021 | 701-15-00100 | Concrete Collar | 6 | EACH | 2,514.00 | 15,084.00 | 2,760.00 | 16,560.00 | 3,500.00 | 21,000.00 | 2,000.00 | 12,000.00 | | 0022 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,264.90 | 5,264.90 | 12,650.00 | 12,650.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,941.80 | 6,941.80 | 5,520.00 | 5,520.00 | 7,500.00 | 7,500.00 | 7,500.00 | 7,500.00 | | 0024 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 6,519.50 | 6,519.50 | 11,500.00 | 11,500.00 | 2,000.00 | 2,000.00 | 15,000.00 | 15,000.00 | | 0025 | 702-03-00600 | Catch Basins (CB-07) | 8 | EACH | 6,513.70 | 52,109.60 | 11,500.00 | 92,000.00 | 10,000.00 | 80,000.00 | 8,000.00 | 64,000.00 | | 0026 | 702-04-00210 | Convert Catch Basins to Manholes | 3 | EACH | 3,731.55 | 11,194.65 | 2,990.00 | 8,970.00 | 7,500.00 | 22,500.00 | 2,000.00 | 6,000.00 | | 0027 | 706-01-00100 | Concrete Walk (4" Thick) | 143.5 | SQYD | 72.56 | 10,412.36 | 101.20 | 14,522.20 | 125.00 | 17,937.50 | 125.00 | 17,937.50 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 151.1 | SQYD | 92.80 | 14,022.08 | 126.50 | 19,114.15 | 200.00 | 30,220.00 | 130.00 | 19,643.00 | | 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 149 | SQYD | 71.95 | 10,720.55 | 74.95 | 11,167.55 | 150.00 | 22,350.00 | 125.00 | 18,625.00 | | 0030 | 706-03-00800 | Incidental Concrete Paving (12" Thick) | 369 | SQYD | 130.30 | 48,080.70 | 134.55 | 49,648.95 | 200.00 | 73,800.00 | 150.00 | 55,350.00 | | 0031 | 706-04-00100 | Handicapped Curb Ramps Type 7 | 8 | EACH | 2,598.10 | 20,784.80 | 2,070.00 | 16,560.00 | 3,500.00 | 28,000.00 | 2,000.00 | 16,000.00 | | 0032 | 707-01-00100 | Concrete Curb Barrier | 200.6 | LNFT | 43.15 | 8,655.89 | 28.75 | 5,767.25 | 40.00 | 8,024.00 | 30.00 | 6,018.00 | | 0033 | 707-01-00100 | Concrete Curb Mountable | 260.5 | LNFT | 42.60 | 11,097.30 | 28.75 | 7,489.38 | 40.00 | 10,420.00 | 30.00 | 7,815.00 | | 0034 | 707-03-00100 | Combination Concrete Curb and Gutter | 9,841.5 | LNFT | 57.00 | 560,965.50 | 50.60 | 497,979.90 | 50.00 | 492,075.00 | 35.00 | 344,452.50 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 164,305.25 | 164,305.25 | 195,000.00 | 195,000.00 | 550,000.00 | 550,000.00 | 419,408.51 | 419,408.51 | | 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,396 | LNFT | 1.25 | 4,245.00 | 0.58 | 1,969.68 | 1.00 | 3,396.00 | 1.00 | 3,396.00 | | 0037 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 667 | LNFT | 4.75 | 3,168.25 | 4.60 | 3,068.20 | 4.00 | 2,668.00 | 4.00 | 2,668.00 | | 0038 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.269 | MILE | 945.00 | 254.21 | 322.00 | 86.62 | 300.00 | 80.70 | 250.00 | 67.25 | | 0039 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.067 | MILE | 945.00 | 63.32 | 5,520.00 | 369.84 | 720.00 | 48.24 | 6,000.00 | 402.00 | | 0040 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.278 | MILE | 2,125.00 | 9,090.75 | 925.75 | 3,960.36 | 1,800.00 | 7,700.40 | 1,800.00 | 7,700.40 | | 0041 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 8 | EACH | 177.10 | 1,416.80 | 69.00 | 552.00 | 150.00 | 1,200.00 | 100.00 | 800.00 | | 0042 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 17 | EACH | 94.50 | 1,606.50 | 46.00 | 782.00 | 80.00 | 1,360.00 | 100.00 | 1,700.00 | | 0043 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 1 | EACH | 94.50 | 94.50 | 46.00 | 46.00 | 80.00 | 80.00 | 100.00 | 100.00 | | 0044 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 147.60 | 147.60 | 46.00 | 46.00 | 125.00 | 125.00 | 100.00 | 100.00 | | 0045 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 19,646.15 | 39,292.30 | 21,850.00 | 43,700.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | | 0046 | 726-01-00100 | Bedding Material | 46.1 | CUYD | 94.00 | 4,333.40 | 103.50 | 4,771.35 | 150.00 | 6,915.00 | 100.00 | 4,610.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 370,898.70 | 370,898.70 | 475,000.00 | 475,000.00 | 580,000.00 | 580,000.00 | 500,000.00 | 500,000.00 | | 0048 | 729-01-00100 | Sign (Type A) | 290.6 | SQFT | 17.75 | 5,158.15 | 51.75 | 15,038.55 | 75.00 | 21,795.00 | 100.00 | 29,060.00 | | 0049 | 729-21-00100 | U-Channel Post | 13 | EACH | 147.60 | 1,918.80 | 276.00 | 3,588.00 | 160.00 | 2,080.00 | 250.00 | 3,250.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 640 | EACH | 21.30 | 13,632.00 | 34.50 | 22,080.00 | 20.00 | 12,800.00 | 20.00 | 12,800.00 | | 0051 | 732-01-03040 | Plastic Pavement Striping (8" Width) (Preformed Tape) (DOTD Intersection Grade) | 1,776 | LNFT | 11.85 | 21,045.60 | 20.70 | 36,763.20 | 11.00 | 19,536.00 | 10.00 | 17,760.00 | | 0052 | 732-01-03080 | Plastic Pavement Striping (24" Width) (Preformed Tape) (DOTD Intersection Grade) | 82 | LNFT | 35.45 | 2,906.90 | 36.80 | 3,017.60 | 33.00 | 2,706.00 | 40.00 | 3,280.00 | | 0053 | 732-02-03000 | Plastic Pavement Striping (Solid Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 4.278 | MILE | 31,166.68 | 133,331.06 | 28,750.00 | 122,992.50 | 29,000.00 | 124,062.00 | 25,000.00 | 106,950.00 | | 0054 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 0.269 | MILE | 14,167.00 | 3,810.92 | 11,500.00 | 3,093.50 | 12,000.00 | 3,228.00 | 12,000.00 | 3,228.00 | | 0055 | 732-03-03030 | Plastic Pavement Striping (Dotted Line) (8" Width)(3' Length)(Preformed Tape) (Retroreflectivity Level I) | 0.645 | MILE | 17,708.00 | 11,421.66 | 29,900.00 | 19,285.50 | 16,500.00 | 10,642.50 | 15,000.00 | 9,675.00 | | 0056 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 2 | MILE | 22,430.65 | 44,861.30 | 18,400.00 | 36,800.00 | 21,000.00 | 42,000.00 | 20,000.00 | 40,000.00 | | 0057 | 732-05-00100 | Removal of Existing Markings | 1.082 | MILE | 29,515.00 | 31,935.23 | 21,850.00 | 23,641.70 | 27,000.00 | 29,214.00 | 25,000.00 | 27,050.00 | | 0058 | 736-01-00100 | Trenching and Backfilling | 3,940 | LNFT | 18.55 | 73,087.00 | 17.83 | 70,250.20 | 14.00 | 55,160.00 | 15.00 | 59,100.00 | | 0059 | 736-03-00100 | Jacking or Boring | 1,130 | LNFT | 23.10 | 26,103.00 | 41.40 | 46,782.00 | 20.00 | 22,600.00 | 25.00 | 28,250.00 | | 0060 | 736-04-00001 | Signal Pole (Pedestal Pole) | 4 | EACH | 1,697.95 | 6,791.80 | 1,840.00 | 7,360.00 | 3,600.00 | 14,400.00 | 4,000.00 | 16,000.00 | | 0061 | 736-04-10200 | Signal Pole (Single Mast Arm, 20ft) | 2 | EACH | 14,965.40 | 29,930.80 | 18,400.00 | 36,800.00 | 15,000.00 | 30,000.00 | 18,000.00 | 36,000.00 | | 0062 | 736-04-10250 | Signal Pole (Single Mast Arm, 25ft) | 2 | EACH | 15,673.70 | 31,347.40 | 19,550.00 | 39,100.00 | 16,000.00 | 32,000.00 | 20,000.00 | 40,000.00 | | 0063 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 19,305.70 | 19,305.70 | 22,655.00 | 22,655.00 | 20,000.00 | 20,000.00 | 22,000.00 | 22,000.00 | | 0064 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 22,021.00 | 22,021.00 | 25,015.00 | 25,015.00 | 22,000.00 | 22,000.00 | 25,000.00 | 25,000.00 | | 0065 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 3 | EACH | 24,733.95 | 74,201.85 | 28,750.00 | 86,250.00 | 25,000.00 | 75,000.00 | 30,000.00 | 90,000.00 | | 0066 | 736-04-10550 | Signal Pole (Single Mast Arm, 55ft) | 1 | EACH | 34,652.95 | 34,652.95 | 39,100.00 | 39,100.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | | 0067 | 736-04-10600 | Signal Pole (Single Mast Arm, 60ft) | 1 | EACH | 41,264.10 | 41,264.10 | 46,572.00 | 46,572.00 | 38,000.00 | 38,000.00 | 43,000.00 | 43,000.00 | | 0068 | 736-04-10650 | Signal Pole (Single Mast Arm, 65ft) | 1 | EACH | 47,048.80 | 47,048.80 | 60,425.00 | 60,425.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | | 0069 | 736-04-25540 | Signal Pole (Dual Mast Arm, 55ft-Arm 1, 40ft-Arm 2) | 2 | EACH | 57,229.40 | 114,458.80 | 78,000.00 | 156,000.00 | 48,000.00 | 96,000.00 | 52,000.00 | 104,000.00 | | 0070 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 30 | EACH | 1,540.80 | 46,224.00 | 1,000.00 | 30,000.00 | 1,600.00 | 48,000.00 | 2,000.00 | 60,000.00 | | 0071 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 11 | EACH | 1,551.20 | 17,063.20 | 950.00 | 10,450.00 | 1,600.00 | 17,600.00 | 2,000.00 | 22,000.00 | | 0072 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 2,423.70 | 2,423.70 | 1,100.00 | 1,100.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | | 0073 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 2,541.75 | 2,541.75 | 1,500.00 | 1,500.00 | 2,400.00 | 2,400.00 | 2,500.00 | 2,500.00 | | 0074 | 736-06-00100 | Signal Service | 4 | EACH | 8,663.30 | 34,653.20 | 2,000.00 | 8,000.00 | 5,200.00 | 20,800.00 | 5,500.00 | 22,000.00 | | 0075 | 736-06-00500 | Signal Service Pedestal Disconnect | 4 | EACH | 1,697.95 | 6,791.80 | 2,800.00 | 11,200.00 | 3,300.00 | 13,200.00 | 3,500.00 | 14,000.00 | | 0076 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 4 | EACH | 13,621.60 | 54,486.40 | 6,800.00 | 27,200.00 | 8,900.00 | 35,600.00 | 10,000.00 | 40,000.00 | | 0077 | 736-09-00100 | Loop Detector | 3,440 | LNFT | 45.60 | 156,864.00 | 30.00 | 103,200.00 | 40.00 | 137,600.00 | 45.00 | 154,800.00 | | 0078 | 736-10-00200 | Underground Junction Box (Type E) | 33 | EACH | 2,012.45 | 66,410.85 | 875.00 | 28,875.00 | 2,000.00 | 66,000.00 | 1,500.00 | 49,500.00 | | 0079 | 736-10-00300 | Underground Junction Box (Type F) | 23 | EACH | 2,132.90 | 49,056.70 | 875.00 | 20,125.00 | 2,300.00 | 52,900.00 | 2,000.00 | 46,000.00 | | 0080 | 736-10-00400 | Underground Junction Box (Type G) | 4 | EACH | 2,760.45 | 11,041.80 | 2,100.00 | 8,400.00 | 3,300.00 | 13,200.00 | 3,000.00 | 12,000.00 | | 0081 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 340 | LNFT | 9.30 | 3,162.00 | 7.50 | 2,550.00 | 6.00 | 2,040.00 | 7.00 | 2,380.00 | | 0082 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 3,010 | LNFT | 13.90 | 41,839.00 | 10.50 | 31,605.00 | 10.00 | 30,100.00 | 11.00 | 33,110.00 | | 0083 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 2,280 | LNFT | 23.60 | 53,808.00 | 15.50 | 35,340.00 | 17.00 | 38,760.00 | 20.00 | 45,600.00 | | 0084 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 9,425 | LNFT | 5.15 | 48,538.75 | 2.10 | 19,792.50 | 2.00 | 18,850.00 | 3.00 | 28,275.00 | | 0085 | 736-12-02014 | Conductor (2c, #14 awg) | 1,315 | LNFT | 2.70 | 3,550.50 | 2.10 | 2,761.50 | 2.00 | 2,630.00 | 3.00 | 3,945.00 | | 0086 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 400 | LNFT | 4.25 | 1,700.00 | 5.25 | 2,100.00 | 6.50 | 2,600.00 | 10.00 | 4,000.00 | | 0087 | 736-12-06014 | Conductor (6c, #14 awg) | 3,005 | LNFT | 3.90 | 11,719.50 | 2.50 | 7,512.50 | 5.50 | 16,527.50 | 6.00 | 18,030.00 | | 0088 | 736-12-10014 | Conductor (10c, #14 awg) | 4,645 | LNFT | 5.60 | 26,012.00 | 3.10 | 14,399.50 | 6.50 | 30,192.50 | 10.00 | 46,450.00 | | 0089 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 4 | EACH | 3,704.90 | 14,819.60 | 4,000.00 | 16,000.00 | 1,400.00 | 5,600.00 | 5,000.00 | 20,000.00 | | 0090 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 9 | EACH | 17,020.15 | 153,181.35 | 6,500.00 | 58,500.00 | 8,000.00 | 72,000.00 | 10,000.00 | 90,000.00 | | 0091 | 736-15-04200 | Signal Support (Foundation, 42 inch Minimum Diameter) | 4 | EACH | 16,809.10 | 67,236.40 | 12,500.00 | 50,000.00 | 13,000.00 | 52,000.00 | 12,500.00 | 50,000.00 | | 0092 | 736-15-04800 | Signal Support (Foundation, 48 inch Minimum Diameter) | 1 | EACH | 17,534.85 | 17,534.85 | 16,800.00 | 16,800.00 | 22,000.00 | 22,000.00 | 21,000.00 | 21,000.00 | | 0093 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 8 | EACH | 967.05 | 7,736.40 | 775.00 | 6,200.00 | 1,100.00 | 8,800.00 | 1,200.00 | 9,600.00 | | 0094 | 737-05-00001 | Painted Curbs and Islands | 9,050 | SQYD | 35.45 | 320,822.50 | 34.00 | 307,700.00 | 5.00 | 45,250.00 | 30.00 | 271,500.00 | | 0095 | 739-01-00100 | Hydro-Seeding | 0.201 | ACRE | 3,230.00 | 649.23 | 2,300.00 | 462.30 | 10,000.00 | 2,010.00 | 20,000.00 | 4,020.00 | | 0096 | 740-01-00100 | Construction Layout | 1 | LUMP | 99,559.25 | 99,559.25 | 140,000.00 | 140,000.00 | 75,000.00 | 75,000.00 | 300,000.00 | 300,000.00 | | 0097 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 91,909 | INLF | 0.95 | 87,313.55 | 1.00 | 91,909.00 | 1.80 | 165,436.20 | 2.00 | 183,818.00 | | 0098 | NS-602-00012 | Pavement Repair System (4" average depth) | 144 | SQFT | 82.70 | 11,908.80 | 110.00 | 15,840.00 | 275.00 | 39,600.00 | 100.00 | 14,400.00 | | 0099 | NS-702-00100 | Paved Gutter Drain | 1 | EACH | 4,709.10 | 4,709.10 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0100 | NS-736-00001 | GPS | 4 | EACH | 871.60 | 3,486.40 | 500.00 | 2,000.00 | 550.00 | 2,200.00 | 1,000.00 | 4,000.00 | | 0101 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 4 | EACH | 23,420.25 | 93,681.00 | 42,500.00 | 170,000.00 | 33,000.00 | 132,000.00 | 29,000.00 | 116,000.00 | | 0102 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 8 | EACH | 1,203.15 | 9,625.20 | 810.00 | 6,480.00 | 1,200.00 | 9,600.00 | 1,500.00 | 12,000.00 | | 0103 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 4 | EACH | 7,128.55 | 28,514.20 | 4,200.00 | 16,800.00 | 5,000.00 | 20,000.00 | 5,500.00 | 22,000.00 | | 0104 | NS-DEV-73206 | MMA Pavement Striping (Dotted)(4 inch Width)(2' L) | 352 | LNFT | 24.15 | 8,500.80 | 20.00 | 7,040.00 | 22.00 | 7,744.00 | 25.00 | 8,800.00 | | 0105 | NS-DEV-73232 | MMA Pavement Striping (Solid Line) (8 inch Width) | 874 | LNFT | 47.45 | 41,471.30 | 40.00 | 34,960.00 | 44.00 | 38,456.00 | 50.00 | 43,700.00 | | 0106 | NS-DEV-73236 | MMA Pavement Striping (Solid Line) (24 inch Width) | 585 | LNFT | 35.75 | 20,913.75 | 48.50 | 28,372.50 | 33.00 | 19,305.00 | 35.00 | 20,475.00 | | 0107 | NS-DEV-73251 | MMA Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 1,715.40 | 1,715.40 | 2,500.00 | 2,500.00 | 1,400.00 | 1,400.00 | 1,500.00 | 1,500.00 | | 0108 | NS-DEV-73252 | MMA Pavement Legends and Symbols (Arrow - Left Turn) | 17 | EACH | 1,545.40 | 26,271.80 | 1,600.00 | 27,200.00 | 1,400.00 | 23,800.00 | 1,500.00 | 25,500.00 | | 0109 | NS-DEV-73253 | MMA Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 2,687.55 | 5,375.10 | 2,200.00 | 4,400.00 | 2,400.00 | 4,800.00 | 2,500.00 | 5,000.00 | | 0110 | NS-DEV-73254 | MMA Pavement Legends and Symbols (U-Turn) | 4 | EACH | 4,177.15 | 16,708.60 | 2,100.00 | 8,400.00 | 3,800.00 | 15,200.00 | 2,500.00 | 10,000.00 | | 0111 | NS-DEV-73255 | MMA Pavement Legends and Symbols (Arrow - U-Turn/Left Turn) | 7 | EACH | 2,623.05 | 18,361.35 | 35,000.00 | 245,000.00 | 2,400.00 | 16,800.00 | 3,500.00 | 24,500.00 | | 0112 | NS-DEV-73256 | MMA Pavement Legends and Symbols (ONLY) | 1 | EACH | 3,722.35 | 3,722.35 | 2,100.00 | 2,100.00 | 3,300.00 | 3,300.00 | 4,500.00 | 4,500.00 | | 0113 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 4 | EACH | 127.85 | 511.40 | 200.00 | 800.00 | 350.00 | 1,400.00 | 400.00 | 1,600.00 | | 0114 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 16 | EACH | 129.40 | 2,070.40 | 82.00 | 1,312.00 | 300.00 | 4,800.00 | 330.00 | 5,280.00 | | 0115 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 16 | EACH | 129.40 | 2,070.40 | 82.00 | 1,312.00 | 170.00 | 2,720.00 | 200.00 | 3,200.00 | | 0116 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 800 | LNFT | 3.20 | 2,560.00 | 11.00 | 8,800.00 | 6.50 | 5,200.00 | 5.00 | 4,000.00 | | 0117 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 8 | EACH | 81.65 | 653.20 | 11.00 | 88.00 | 155.00 | 1,240.00 | 150.00 | 1,200.00 | | 0118 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 4 | EACH | 1,225.75 | 4,903.00 | 975.00 | 3,900.00 | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | | 0119 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 4 | EACH | 3,350.75 | 13,403.00 | 3,950.00 | 15,800.00 | 3,800.00 | 15,200.00 | 4,000.00 | 16,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,555,000.00 | | 5,046,145.73 | | 5,084,347.94 | | 5,162,162.16 |
|