Proposal:H.011361.6
Parish:Rapides
Routes:US 71
Description:US 71: TURN LANES FOR EMERG STAGING AREA
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$886,177.65
| Rank | License | Bidder | Construction Bid |
| 1 | 35849 | T.L. CONSTRUCTION LLC | $866,189.34 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $905,671.98 |
| 3 | 30774 | Progressive Construction Co., LLC | $946,259.56 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,366,536.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - T.L. CONSTRUCTION LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Progressive Construction Co., LLC | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement (REMOVAL OF BASE MATERIAL INCLUDED) | 2,608.5 | SQYD | 9.00 | 23,476.50 | 22.00 | 57,387.00 | 30.00 | 78,255.00 | 9.00 | 23,476.50 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 232 | SQYD | 20.00 | 4,640.00 | 26.00 | 6,032.00 | 17.00 | 3,944.00 | 16.00 | 3,712.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | 30,000.00 | 30,000.00 | 95,000.00 | 95,000.00 | | 0005 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 24.00 | 192.00 | 55.00 | 440.00 | 78.00 | 624.00 | 55.00 | 440.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 146.00 | 1,460.00 | 225.00 | 2,250.00 | 235.00 | 2,350.00 | 225.00 | 2,250.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 670 | LNFT | 6.00 | 4,020.00 | 2.25 | 1,507.50 | 4.50 | 3,015.00 | 2.00 | 1,340.00 | | 0008 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 5,337.2 | SQYD | 38.00 | 202,813.60 | 38.00 | 202,813.60 | 26.00 | 138,767.20 | 55.00 | 293,546.00 | | 0009 | 304-01-00100 | Lime | 37.83 | TON | 500.00 | 18,915.00 | 250.00 | 9,457.50 | 400.00 | 15,132.00 | 340.00 | 12,862.20 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 2,668.6 | SQYD | 8.15 | 21,749.09 | 3.00 | 8,005.80 | 10.00 | 26,686.00 | 17.00 | 45,366.20 | | 0011 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 75 | CUYD | 60.00 | 4,500.00 | 50.00 | 3,750.00 | 35.00 | 2,625.00 | 55.00 | 4,125.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 1,437.5 | TON | 145.00 | 208,437.50 | 150.00 | 215,625.00 | 160.00 | 230,000.00 | 253.00 | 363,687.50 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 658.8 | TON | 165.00 | 108,702.00 | 150.00 | 98,820.00 | 195.00 | 128,466.00 | 253.00 | 166,676.40 | | 0014 | 701-13-01060 | Corrugated Metal Pipe Arch (Extension) (30" Equiv.) | 12 | LNFT | 320.00 | 3,840.00 | 700.00 | 8,400.00 | 280.00 | 3,360.00 | 575.00 | 6,900.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 1,900.00 | 1,900.00 | 4,300.00 | 4,300.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 16 | LNFT | 65.00 | 1,040.00 | 100.00 | 1,600.00 | 10.00 | 160.00 | 55.00 | 880.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 | 5,900.00 | 5,900.00 | 15,000.00 | 15,000.00 | | 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 208.1 | SQYD | 90.00 | 18,729.00 | 75.00 | 15,607.50 | 83.00 | 17,272.30 | 155.00 | 32,255.50 | | 0019 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 5.1 | SQYD | 900.00 | 4,590.00 | 500.00 | 2,550.00 | 150.00 | 765.00 | 1,550.00 | 7,905.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 63,000.00 | 63,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 2.4 | TON | 1,500.00 | 3,600.00 | 1,000.00 | 2,400.00 | 2,670.00 | 6,408.00 | 1,000.00 | 2,400.00 | | 0022 | 717-01-00100 | Seeding | 96 | LB | 20.00 | 1,920.00 | 16.00 | 1,536.00 | 12.80 | 1,228.80 | 20.00 | 1,920.00 | | 0023 | 718-01-00100 | Fertilizer | 1,200 | LB | 1.75 | 2,100.00 | 0.65 | 780.00 | 0.40 | 480.00 | 0.75 | 900.00 | | 0024 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 270 | SQYD | 2.35 | 634.50 | 6.00 | 1,620.00 | 2.00 | 540.00 | 6.00 | 1,620.00 | | 0025 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | 7,500.00 | 7,500.00 | 3,500.00 | 3,500.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.813 | MILE | 650.00 | 528.45 | 625.00 | 508.13 | 588.00 | 478.04 | 550.00 | 447.15 | | 0027 | 726-01-00100 | Bedding Material | 4.9 | CUYD | 182.00 | 891.80 | 160.00 | 784.00 | 100.00 | 490.00 | 175.00 | 857.50 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 90,000.00 | 90,000.00 | 94,000.00 | 94,000.00 | 124,000.00 | 124,000.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 276 | EACH | 12.00 | 3,312.00 | 11.00 | 3,036.00 | 11.75 | 3,243.00 | 12.00 | 3,312.00 | | 0030 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 969 | LNFT | 6.00 | 5,814.00 | 6.00 | 5,814.00 | 5.80 | 5,620.20 | 5.25 | 5,087.25 | | 0031 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,272 | LNFT | 3.50 | 4,452.00 | 3.25 | 4,134.00 | 3.50 | 4,452.00 | 4.00 | 5,088.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.705 | MILE | 6,200.00 | 10,571.00 | 5,500.00 | 9,377.50 | 6,175.00 | 10,528.38 | 5,500.00 | 9,377.50 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.873 | MILE | 2,500.00 | 2,182.50 | 2,200.00 | 1,920.60 | 2,530.00 | 2,208.69 | 2,200.00 | 1,920.60 | | 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 583.00 | 1,166.00 | 525.00 | 1,050.00 | 588.00 | 1,176.00 | 525.00 | 1,050.00 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 466.00 | 2,330.00 | 425.00 | 2,125.00 | 470.00 | 2,350.00 | 415.00 | 2,075.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 466.00 | 1,398.00 | 425.00 | 1,275.00 | 470.00 | 1,410.00 | 415.00 | 1,245.00 | | 0037 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 3 | EACH | 1,200.00 | 3,600.00 | 1,100.00 | 3,300.00 | 1,175.00 | 3,525.00 | 1,100.00 | 3,300.00 | | 0038 | 732-05-00100 | Removal of Existing Markings | 0.813 | MILE | 11,600.00 | 9,430.80 | 12,500.00 | 10,162.50 | 11,765.00 | 9,564.95 | 10,000.00 | 8,130.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,500.00 | 6,500.00 | 6,500.00 | 6,500.00 | 25,000.00 | 25,000.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 60,335 | INLF | 0.16 | 9,653.60 | 0.01 | 603.35 | 1.00 | 60,335.00 | 0.25 | 15,083.75 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 866,189.34 | | 905,671.98 | | 946,259.56 | | 1,366,536.05 |
|