Proposal:H.010286.6-R1
Parish:Caddo
Routes:LA 538
Description:LA 538: JCT US 71 TO LA 1
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$742,798.70
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $789,945.00 |
| 2 | 67822 | Earnest Contracting LLC | $815,104.74 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 32.9 | SQYD | 100.00 | 3,290.00 | 10.00 | 329.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 472.1 | LNFT | 11.00 | 5,193.10 | 10.00 | 4,721.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 469 | CUYD | 40.00 | 18,760.00 | 25.00 | 11,725.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 3.85 | 2,310.00 | 3.00 | 1,800.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 2,806.8 | TON | 125.00 | 350,850.00 | 134.80 | 378,356.64 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 222.8 | TON | 220.00 | 49,016.00 | 144.50 | 32,194.60 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 33,778 | SQYD | 2.50 | 84,445.00 | 3.50 | 118,223.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,060 | CUYD | 0.01 | -10.60 | 0.10 | -106.00 | | 0009 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 710 | SQYD | 80.00 | 56,800.00 | 81.25 | 57,687.50 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 42.00 | 4,200.00 | 38.00 | 3,800.00 | | 0011 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 82.50 | 4,125.00 | 75.00 | 3,750.00 | | 0012 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 121.00 | 12,100.00 | 110.00 | 11,000.00 | | 0013 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,200.00 | 16,800.00 | 3,800.00 | 15,200.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 43,000.00 | 43,000.00 | 20,000.00 | 20,000.00 | | 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.97 | MILE | 600.00 | 2,982.00 | 500.00 | 2,485.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.88 | MILE | 100.00 | 1,988.00 | 1,500.00 | 29,820.00 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 1,650.00 | 1,650.00 | 1,500.00 | 1,500.00 | | 0018 | 717-01-00100 | Seeding | 15 | LB | 33.00 | 495.00 | 30.00 | 450.00 | | 0019 | 718-01-00100 | Fertilizer | 500 | LB | 1.10 | 550.00 | 1.00 | 500.00 | | 0020 | 724-01-00100 | Rumble Strips (Centerline) | 2.485 | MILE | 3,300.00 | 8,200.50 | 3,000.00 | 7,455.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 43,000.00 | 43,000.00 | 35,000.00 | 35,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 121.00 | 484.00 | 110.00 | 440.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 656 | EACH | 10.00 | 6,560.00 | 9.00 | 5,904.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 55.00 | 1,210.00 | 50.00 | 1,100.00 | | 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.94 | MILE | 5,500.00 | 54,670.00 | 5,000.00 | 49,700.00 | | 0026 | 732-05-00100 | Removal of Existing Markings | 0.138 | MILE | 16,500.00 | 2,277.00 | 15,000.00 | 2,070.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 789,945.00 | | 815,104.74 |
|