Proposal:H.007400.6
Parish:Bossier
Description:NORTH BOSSIER SHARED USE TRAIL, PHASE II
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$735,381.10
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $640,163.50 |
| 2 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $737,814.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - SPECIALTY TRACKHOE & DOZER SERV.INC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 14 | SQYD | 100.00 | 1,400.00 | 33.00 | 462.00 | | 0003 | 202-02-05000 | Removal of Building (Wood on Piers) | 1 | EACH | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 140.2 | LNFT | 20.00 | 2,804.00 | 17.00 | 2,383.40 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 2 | EACH | 250.00 | 500.00 | 100.00 | 200.00 | | 0006 | 202-03-38000 | Relocation of Sign | 5 | EACH | 200.00 | 1,000.00 | 100.00 | 500.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole (Sta. 46+37.95, offset 5.44 Lt) | 5 | EACH | 200.00 | 1,000.00 | 100.00 | 500.00 | | 0008 | 203-01-00100 | General Excavation | 1,850 | CUYD | 20.00 | 37,000.00 | 26.50 | 49,025.00 | | 0009 | 203-03-00100 | Embankment | 1,300 | CUYD | 20.00 | 26,000.00 | 36.00 | 46,800.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 10.00 | 1,000.00 | 25.00 | 2,500.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 11,964 | LNFT | 2.00 | 23,928.00 | 2.25 | 26,919.00 | | 0012 | 302-02-06020 | Class II Base Course (6" Thick) (Crushed Stone) | 9,125.4 | SQYD | 20.00 | 182,508.00 | 25.00 | 228,135.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 913 | TON | 144.50 | 131,928.50 | 167.00 | 152,471.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 500.00 | 500.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 4,500.00 | 4,500.00 | | 0016 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 750.00 | 6,750.00 | 1,500.00 | 13,500.00 | | 0017 | 707-03-00100 | Combination Concrete Curb and Gutter | 176.2 | LNFT | 65.00 | 11,453.00 | 45.00 | 7,929.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 8,100.00 | 8,100.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | | 0020 | 729-01-00100 | Sign (Type A) | 259.9 | SQFT | 150.00 | 38,985.00 | 40.00 | 10,396.00 | | 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 | | 0022 | 729-21-00100 | U-Channel Post | 44 | EACH | 150.00 | 6,600.00 | 200.00 | 8,800.00 | | 0023 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 494 | LNFT | 5.00 | 2,470.00 | 5.00 | 2,470.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 265 | LNFT | 20.00 | 5,300.00 | 20.00 | 5,300.00 | | 0025 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (XING) | 8 | EACH | 1,500.00 | 12,000.00 | 1,500.00 | 12,000.00 | | 0026 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 8 | EACH | 1,000.00 | 8,000.00 | 1,000.00 | 8,000.00 | | 0027 | 732-05-00100 | Removal of Existing Markings | 0.02 | MILE | 150,000.00 | 3,000.00 | 150,000.00 | 3,000.00 | | 0028 | 736-01-00100 | Trenching and Backfilling | 30 | LNFT | 20.00 | 600.00 | 20.00 | 600.00 | | 0029 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | | 0030 | 736-12-02014 | Conductor (2c, #14 awg) | 150 | LNFT | 5.00 | 750.00 | 5.00 | 750.00 | | 0031 | 736-12-06014 | Conductor (6c, #14 awg) | 150 | LNFT | 7.00 | 1,050.00 | 7.00 | 1,050.00 | | 0032 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | | 0033 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 600.00 | 1,200.00 | 600.00 | 1,200.00 | | 0034 | 736-22-00000 | Pedestrian Push Button | 2 | EACH | 125.00 | 250.00 | 125.00 | 250.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 2.5 | ACRE | 3,500.00 | 8,750.00 | 3,050.00 | 7,625.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 28,500.00 | 28,500.00 | | 0037 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 375 | INLF | 2.00 | 750.00 | 5.00 | 1,875.00 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,387 | INLF | 1.00 | 1,387.00 | 2.00 | 2,774.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 640,163.50 | | 737,814.40 |
|