Proposal:H.000574.6
Parish:Rapides
Routes:US 165
Description:MASONIC DRIVE STREETSCAPE, PHASE II
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CONCRETE WALKS, DRILLED SHAFT FOUNDATIONS, SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$1,321,426.39
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $1,074,874.10 |
| 2 | 54928 | Womack And Sons Constr. Group LLC | $1,175,631.90 |
| 3 | 55276 | Turner & Turner Contracting, LLC | $1,189,814.21 |
| 4 | 39001 | JD's Rebar & Construction, Inc. | $1,410,807.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - Womack And Sons Constr. Group LLC | - 3 - Turner & Turner Contracting, LLC | - 4 - JD's Rebar & Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 12,500.00 | 12,500.00 | 24,000.00 | 24,000.00 | 26,193.60 | 26,193.60 | 13,503.50 | 13,503.50 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 22,000.00 | 22,000.00 | 32,742.00 | 32,742.00 | 30,123.22 | 30,123.22 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 710 | SQYD | 15.00 | 10,650.00 | 15.00 | 10,650.00 | 12.00 | 8,520.00 | 23.23 | 16,493.30 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 123 | LNFT | 11.50 | 1,414.50 | 95.00 | 11,685.00 | 6.00 | 738.00 | 18.85 | 2,318.55 | | 0005 | 202-03-00010 | Relocation of Signs and Supports | 2 | EACH | 350.00 | 700.00 | 600.00 | 1,200.00 | 1,200.00 | 2,400.00 | 525.86 | 1,051.72 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 70,000.00 | 70,000.00 | 70,000.00 | 70,000.00 | 33,942.00 | 33,942.00 | 38,258.60 | 38,258.60 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 60 | LNFT | 25.00 | 1,500.00 | 100.00 | 6,000.00 | 15.30 | 918.00 | 183.41 | 11,004.60 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,730 | LNFT | 1.00 | 3,730.00 | 3.00 | 11,190.00 | 0.41 | 1,529.30 | 8.04 | 29,989.20 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 30 | CUYD | 100.00 | 3,000.00 | 95.00 | 2,850.00 | 87.12 | 2,613.60 | 539.42 | 16,182.60 | | 0010 | 706-01-00100 | Concrete Walk (4" Thick) | 1,659.7 | SQYD | 65.00 | 107,880.50 | 58.00 | 96,262.60 | 58.97 | 97,872.51 | 71.08 | 117,971.48 | | 0011 | 706-01-00100 | Concrete Walk (4" Thick) with Key | 192.8 | SQYD | 78.00 | 15,038.40 | 76.00 | 14,652.80 | 67.09 | 12,934.95 | 102.06 | 19,677.17 | | 0012 | 706-02-00200 | Concrete Drive (6" Thick) | 691.6 | SQYD | 70.00 | 48,412.00 | 105.00 | 72,618.00 | 72.35 | 50,037.26 | 70.88 | 49,020.61 | | 0013 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 124.1 | SQYD | 85.00 | 10,548.50 | 105.00 | 13,030.50 | 50.43 | 6,258.36 | 136.58 | 16,949.58 | | 0014 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 6.9 | SQYD | 120.00 | 828.00 | 350.00 | 2,415.00 | 267.67 | 1,846.92 | 1,018.72 | 7,029.17 | | 0015 | 706-04-00100 | Handicapped Curb Ramps | 33 | EACH | 1,500.00 | 49,500.00 | 600.00 | 19,800.00 | 1,791.60 | 59,122.80 | 1,660.67 | 54,802.11 | | 0016 | 707-01-00100 | Concrete Curb | 508 | LNFT | 25.00 | 12,700.00 | 40.00 | 20,320.00 | 17.23 | 8,752.84 | 21.48 | 10,911.84 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,500.00 | 12,500.00 | 30,000.00 | 30,000.00 | 8,940.00 | 8,940.00 | 18,788.30 | 18,788.30 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 103,000.00 | 103,000.00 | 18,000.00 | 18,000.00 | 134,635.00 | 134,635.00 | 234,853.83 | 234,853.83 | | 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 161 | SQFT | 60.00 | 9,660.00 | 42.00 | 6,762.00 | 46.20 | 7,438.20 | 146.78 | 23,631.58 | | 0020 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 15 | EACH | 200.00 | 3,000.00 | 365.00 | 5,475.00 | 184.80 | 2,772.00 | 352.28 | 5,284.20 | | 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 619 | LNFT | 25.30 | 15,660.70 | 31.00 | 19,189.00 | 27.72 | 17,158.68 | 41.14 | 25,465.66 | | 0022 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 44,000.00 | 2,200.00 | 18,500.00 | 925.00 | 18,000.00 | 900.00 | 35,228.00 | 1,761.40 | | 0023 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 2,100.00 | 2,100.00 | 4,000.00 | 4,000.00 | 2,520.00 | 2,520.00 | 2,935.67 | 2,935.67 | | 0024 | 736-04-10250 | Signal Pole (Single Mast Arm, 25ft) | 2 | EACH | 18,375.00 | 36,750.00 | 25,000.00 | 50,000.00 | 21,600.00 | 43,200.00 | 21,371.70 | 42,743.40 | | 0025 | 736-05-30004 | Signal Heads (3 Section, 12 inch Led Lens, R, R, Y) | 4 | EACH | 1,050.00 | 4,200.00 | 1,500.00 | 6,000.00 | 1,920.00 | 7,680.00 | 1,409.12 | 5,636.48 | | 0026 | 736-06-00100 | Signal Service (Pedestal Req'd.) | 1 | EACH | 2,625.00 | 2,625.00 | 4,200.00 | 4,200.00 | 2,760.00 | 2,760.00 | 3,522.81 | 3,522.81 | | 0027 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 840.00 | 1,680.00 | 1,900.00 | 3,800.00 | 1,440.00 | 2,880.00 | 1,056.84 | 2,113.68 | | 0028 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 170 | LNFT | 5.25 | 892.50 | 3.70 | 629.00 | 9.60 | 1,632.00 | 7.05 | 1,198.50 | | 0029 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 220 | LNFT | 5.25 | 1,155.00 | 8.00 | 1,760.00 | 15.00 | 3,300.00 | 7.05 | 1,551.00 | | 0030 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 75 | LNFT | 8.40 | 630.00 | 15.00 | 1,125.00 | 31.80 | 2,385.00 | 10.57 | 792.75 | | 0031 | 736-12-01003 | Conductor (1c, #3 awg) | 400 | LNFT | 2.10 | 840.00 | 6.00 | 2,400.00 | 6.00 | 2,400.00 | 3.52 | 1,408.00 | | 0032 | 736-12-01008 | Conductor (1c, #8 awg) | 30 | LNFT | 5.25 | 157.50 | 4.00 | 120.00 | 4.80 | 144.00 | 7.05 | 211.50 | | 0033 | 736-12-02014 | Conductor (2c, #14 awg) | 500 | LNFT | 2.10 | 1,050.00 | 4.00 | 2,000.00 | 3.60 | 1,800.00 | 3.52 | 1,760.00 | | 0034 | 736-12-06014 | Conductor (6c, #14 awg) | 150 | LNFT | 4.20 | 630.00 | 6.00 | 900.00 | 4.80 | 720.00 | 5.87 | 880.50 | | 0035 | 736-12-10014 | Conductor (10c, #14 awg) | 200 | LNFT | 6.30 | 1,260.00 | 7.50 | 1,500.00 | 5.40 | 1,080.00 | 8.22 | 1,644.00 | | 0036 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 1,680.00 | 6,720.00 | 830.00 | 3,320.00 | 1,056.00 | 4,224.00 | 1,996.26 | 7,985.04 | | 0037 | 736-22-00000 | Pedestrian Push Button | 4 | EACH | 210.00 | 840.00 | 350.00 | 1,400.00 | 540.00 | 2,160.00 | 352.28 | 1,409.12 | | 0038 | 739-01-00100 | Hydro-Seeding | 0.7 | ACRE | 5,000.00 | 3,500.00 | 7,500.00 | 5,250.00 | 5,227.20 | 3,659.04 | 7,632.76 | 5,342.93 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 11,600.00 | 11,600.00 | 9,500.00 | 9,500.00 | 9,981.29 | 9,981.29 | | 0040 | 822-01-00100 | Trenching and Backfilling | 4,900 | LNFT | 4.20 | 20,580.00 | 6.50 | 31,850.00 | 8.10 | 39,690.00 | 5.87 | 28,763.00 | | 0041 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (2-#6, 1-#6 Grnd) | 2,350 | LNFT | 8.93 | 20,985.50 | 12.00 | 28,200.00 | 14.88 | 34,968.00 | 10.57 | 24,839.50 | | 0042 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (2-#8, 1-#8 Grnd) | 290 | LNFT | 8.40 | 2,436.00 | 10.00 | 2,900.00 | 13.20 | 3,828.00 | 10.57 | 3,065.30 | | 0043 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (3-#3) | 70 | LNFT | 15.75 | 1,102.50 | 25.00 | 1,750.00 | 24.00 | 1,680.00 | 18.79 | 1,315.30 | | 0044 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (4-#8, 1-#8 Grnd) | 2,250 | LNFT | 11.55 | 25,987.50 | 15.00 | 33,750.00 | 16.80 | 37,800.00 | 14.09 | 31,702.50 | | 0045 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) | 390 | LNFT | 36.75 | 14,332.50 | 50.00 | 19,500.00 | 36.90 | 14,391.00 | 41.10 | 16,029.00 | | 0046 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 393 | LNFT | 52.50 | 20,632.50 | 71.00 | 27,903.00 | 50.40 | 19,807.20 | 64.58 | 25,379.94 | | 0047 | 822-05-02100 | Light Pole (25', Round, Non-tapered, Aluminum, Black Finish) | 21 | EACH | 6,300.00 | 132,300.00 | 5,200.00 | 109,200.00 | 4,200.00 | 88,200.00 | 7,280.47 | 152,889.87 | | 0048 | 822-07-02800 | Luminaire (180W)(LED)(Universal Driver, Black Finish) | 21 | EACH | 1,470.00 | 30,870.00 | 1,700.00 | 35,700.00 | 1,464.00 | 30,744.00 | 1,761.40 | 36,989.40 | | 0049 | 822-08-00100 | Electrical Service Point (Pedestal) | 1 | EACH | 8,400.00 | 8,400.00 | 12,500.00 | 12,500.00 | 14,160.00 | 14,160.00 | 9,981.29 | 9,981.29 | | 0050 | 822-16-00200 | Underground Junction Box (11" x 18") | 1 | EACH | 735.00 | 735.00 | 2,100.00 | 2,100.00 | 1,320.00 | 1,320.00 | 939.42 | 939.42 | | 0051 | 822-16-00300 | Underground Junction Box (13" x 24") | 28 | EACH | 892.50 | 24,990.00 | 1,100.00 | 30,800.00 | 1,440.00 | 40,320.00 | 1,115.56 | 31,235.68 | | 0052 | 822-18-00100 | Service Pole | 1 | EACH | 1,050.00 | 1,050.00 | 2,900.00 | 2,900.00 | 1,500.00 | 1,500.00 | 1,526.55 | 1,526.55 | | 0053 | 822-21-00100 | Duct Marker (Concrete) | 30 | EACH | 105.00 | 3,150.00 | 170.00 | 5,100.00 | 240.00 | 7,200.00 | 146.78 | 4,403.40 | | 0054 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 4,900 | LNFT | 0.26 | 1,274.00 | 0.30 | 1,470.00 | 0.60 | 2,940.00 | 0.59 | 2,891.00 | | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,548 | INLF | 2.00 | 15,096.00 | 2.50 | 18,870.00 | 1.20 | 9,057.60 | 2.64 | 19,926.72 | | 0056 | TS-700-00010 | Benches (Park) (6' Metal) | 12 | EACH | 1,500.00 | 18,000.00 | 1,700.00 | 20,400.00 | 2,868.25 | 34,419.00 | 892.19 | 10,706.28 | | 0057 | TS-700-00200 | Trench Drains | 30 | LF | 310.00 | 9,300.00 | 440.00 | 13,200.00 | 234.51 | 7,035.30 | 705.55 | 21,166.50 | | 0058 | TS-736-36100 | Signal Controller and Cabinet (Mid-Block Pedestrian Crosswalk Controller) | 1 | EACH | 23,100.00 | 23,100.00 | 27,000.00 | 27,000.00 | 29,760.00 | 29,760.00 | 27,008.19 | 27,008.19 | | 0059 | TS-741-10017 | Water Valve and Meter Box (New Installation) (Meter Box Only) | 1 | EACH | 550.00 | 550.00 | 1,350.00 | 1,350.00 | 37.66 | 37.66 | 2,348.54 | 2,348.54 | | 0060 | TS-800-00300 | Handrail | 320 | LNFT | 85.00 | 27,200.00 | 130.00 | 41,600.00 | 118.66 | 37,971.20 | 109.49 | 35,036.80 | | 0061 | TS-MSC-00010 | Trash Receptacle | 7 | EACH | 1,350.00 | 9,450.00 | 1,800.00 | 12,600.00 | 1,503.48 | 10,524.36 | 1,142.14 | 7,994.98 | | 0062 | TS-MSC-00020 | Adjusting In-Ground Utility Access Box | 8 | EACH | 550.00 | 4,400.00 | 520.00 | 4,160.00 | 76.50 | 612.00 | 863.12 | 6,904.96 | | 0063 | TS-MSC-00265 | Transit Station (Prefabricated) | 1 | LUMP | 60,500.00 | 60,500.00 | 51,000.00 | 51,000.00 | 86,390.03 | 86,390.03 | 45,647.63 | 45,647.63 | | 0064 | TS-MSC-20200 | Retaining Wall | 320 | LF | 75.00 | 24,000.00 | 190.00 | 60,800.00 | 78.59 | 25,148.80 | 81.02 | 25,926.40 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,074,874.10 | | 1,175,631.90 | | 1,189,814.21 | | 1,410,807.04 |
|