Proposal:H.014751.6
Parish:Lafourche
Routes:LA 1
Description:LA 1:TURN LANE @ BRANDYWINE-COUNTRY CLUB
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$932,535.32
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $983,111.23 |
| 2 | 62139 | Huey P. Stockstill, LLC | $1,073,835.88 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $1,280,556.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions BRICK MAILBOXES | 1 | LUMP | 1,600.00 | 1,600.00 | 400.00 | 400.00 | 1,250.00 | 1,250.00 | | 0002 | 202-02-00020 | Removal of BRICK DRIVEWAY APRON | 25 | SQYD | 140.00 | 3,500.00 | 80.00 | 2,000.00 | 65.00 | 1,625.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,391 | SQYD | 4.50 | 19,759.50 | 10.00 | 43,910.00 | 7.50 | 32,932.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 190 | SQYD | 45.00 | 8,550.00 | 175.00 | 33,250.00 | 125.00 | 23,750.00 | | 0005 | 203-01-00100 | General Excavation | 1,224 | CUYD | 35.00 | 42,840.00 | 30.00 | 36,720.00 | 45.00 | 55,080.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 230 | CUYD | 16.50 | 3,795.00 | 30.00 | 6,900.00 | 100.00 | 23,000.00 | | 0007 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 34.5 | CUYD | 120.00 | 4,140.00 | 225.00 | 7,762.50 | 225.00 | 7,762.50 | | 0008 | 502-01-00100 | Asphalt Concrete | 4,372.7 | TON | 127.00 | 555,332.90 | 115.00 | 502,860.50 | 160.00 | 699,632.00 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 145 | TON | 200.00 | 29,000.00 | 190.00 | 27,550.00 | 200.00 | 29,000.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 6,700 | SQYD | 4.00 | 26,800.00 | 4.00 | 26,800.00 | 6.50 | 43,550.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -372.3 | CUYD | 0.10 | -37.23 | 0.01 | -3.72 | 1.00 | -372.30 | | 0012 | 706-02-00200 | Concrete Drive (6" Thick) | 190 | SQYD | 200.00 | 38,000.00 | 225.00 | 42,750.00 | 175.00 | 33,250.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 81,000.00 | 81,000.00 | 96,000.00 | 96,000.00 | 90,000.00 | 90,000.00 | | 0014 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,460 | LNFT | 0.10 | 146.00 | 0.75 | 1,095.00 | 0.75 | 1,095.00 | | 0015 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 411 | LNFT | 0.10 | 41.10 | 2.00 | 822.00 | 2.50 | 1,027.50 | | 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.58 | MILE | 4,015.95 | 2,329.25 | 195.00 | 113.10 | 500.00 | 290.00 | | 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.58 | MILE | 4,015.95 | 2,329.25 | 250.00 | 145.00 | 300.00 | 174.00 | | 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.74 | MILE | 0.10 | 0.17 | 800.00 | 1,392.00 | 900.00 | 1,566.00 | | 0019 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 0.10 | 0.80 | 50.00 | 400.00 | 75.00 | 600.00 | | 0020 | 717-01-00100 | Seeding | 13 | LB | 36.00 | 468.00 | 35.00 | 455.00 | 40.00 | 520.00 | | 0021 | 718-01-00100 | Fertilizer | 281 | LB | 6.00 | 1,686.00 | 2.00 | 562.00 | 6.00 | 1,686.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 61,020.44 | 61,020.44 | 107,000.00 | 107,000.00 | 115,000.00 | 115,000.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 658 | EACH | 30.00 | 19,740.00 | 15.00 | 9,870.00 | 14.00 | 9,212.00 | | 0024 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 400 | LNFT | 4.50 | 1,800.00 | 5.00 | 2,000.00 | 5.00 | 2,000.00 | | 0025 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 183 | LNFT | 23.00 | 4,209.00 | 15.00 | 2,745.00 | 17.00 | 3,111.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.77 | MILE | 11,000.00 | 19,470.00 | 8,000.00 | 14,160.00 | 8,000.00 | 14,160.00 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.29 | MILE | 6,000.00 | 1,740.00 | 4,000.00 | 1,160.00 | 4,000.00 | 1,160.00 | | 0028 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.06 | MILE | 4,500.00 | 270.00 | 7,000.00 | 420.00 | 7,000.00 | 420.00 | | 0029 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 1,400.00 | 5,600.00 | 600.00 | 2,400.00 | 500.00 | 2,000.00 | | 0030 | 735-01-00100 | Mailboxes | 17 | EACH | 1.15 | 19.55 | 30.00 | 510.00 | 40.00 | 680.00 | | 0031 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 300.00 | 4,500.00 | 325.00 | 4,875.00 | 200.00 | 3,000.00 | | 0032 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 400.00 | 400.00 | 550.00 | 550.00 | 250.00 | 250.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 11,000.00 | 11,000.00 | | 0034 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 6,975 | LNFT | 2.25 | 15,693.75 | 1.00 | 6,975.00 | 1.50 | 10,462.50 | | 0035 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,790 | LNFT | 2.25 | 6,277.50 | 6.00 | 16,740.00 | 6.50 | 18,135.00 | | 0036 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 9,765 | LNFT | 0.85 | 8,300.25 | 1.50 | 14,647.50 | 1.50 | 14,647.50 | | 0037 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 27,900 | INLF | 0.10 | 2,790.00 | 1.00 | 27,900.00 | 1.00 | 27,900.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 983,111.23 | | 1,073,835.88 | | 1,280,556.20 |
|