Search


Bid Tabulations for the Letting of 3/9/2022 LA DOTD Headquarters

Proposal:H.014750.6
Parish:Webster
Routes:LA 2
Description:LA 2: LA 2 SPUR TO DORCHEAT BRIDGE
Type Construction:PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$451,245.15
Rank License BidderConstruction Bid
105635Dreher Contracting, LLC$541,025.70


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Dreher Contracting, LLC
Unit PriceTotal
Amount
0001507-01-00100Asphalt Material (CRS-2P Emulsion) 22,201     GAL3.0066,603.00
0002507-02-00300Aggregate (S3) 71,616     SQYD1.65118,166.40
0003510-01-00250Pavement Patching (14 inch Minimum Thickness) 719     SQYD155.00111,445.00
0004713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.00
0005713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.674 MILE1,300.002,176.20
0006713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 18.142 MILE1,550.0028,120.10
0007713-05-00500Temporary Pavement Legends & Symbols (SCHOOL CROSSING) 1     EACH500.00500.00
0008713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 1,349     EACH2.002,698.00
0009724-02-00100Rumble Strips (Shoulder/Edge) 10.216 MILE1,500.0015,324.00
0010727-01-00100Mobilization 1     LUMP50,000.0050,000.00
0011731-02-00100Reflectorized Raised Pavement Markers 1,128     EACH9.0010,152.00
0012732-04-19000Plastic Pavement Legends and Symbols (SCHOOL CROSSING) 1     EACH1,500.001,500.00
0013737-01-00100Painted Traffic Striping (Solid Line) (4" Width) 36.284 MILE1,650.0059,868.60
0014737-02-00100Painted Traffic Striping (Broken Line) (4" Width) 3.348 MILE1,300.004,352.40
0015737-03-00500Painted Traffic Striping (Solid Line) (24" Width) 24     LNFT5.00120.00
0016740-01-00100Construction Layout 1     LUMP20,000.0020,000.00
       
  CONTRACTOR TOTAL   541,025.70