Proposal:H.014750.6
Parish:Webster
Routes:LA 2
Description:LA 2: LA 2 SPUR TO DORCHEAT BRIDGE
Type Construction:PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$451,245.15
| Rank | License | Bidder | Construction Bid |
| 1 | 05635 | Dreher Contracting, LLC | $541,025.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Dreher Contracting, LLC | | Unit Price | Total Amount | | 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 22,201 | GAL | 3.00 | 66,603.00 | | 0002 | 507-02-00300 | Aggregate (S3) | 71,616 | SQYD | 1.65 | 118,166.40 | | 0003 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 719 | SQYD | 155.00 | 111,445.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | | 0005 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.674 | MILE | 1,300.00 | 2,176.20 | | 0006 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.142 | MILE | 1,550.00 | 28,120.10 | | 0007 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 1 | EACH | 500.00 | 500.00 | | 0008 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,349 | EACH | 2.00 | 2,698.00 | | 0009 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.216 | MILE | 1,500.00 | 15,324.00 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,128 | EACH | 9.00 | 10,152.00 | | 0012 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 1,500.00 | 1,500.00 | | 0013 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 36.284 | MILE | 1,650.00 | 59,868.60 | | 0014 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 3.348 | MILE | 1,300.00 | 4,352.40 | | 0015 | 737-03-00500 | Painted Traffic Striping (Solid Line) (24" Width) | 24 | LNFT | 5.00 | 120.00 | | 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 541,025.70 |
|