Proposal:H.014154.6
Parish:Jefferson
Routes:US 90, US 90-Z
Description:US 90: S. KENNER AVE - LA 18
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,777,819.10
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $9,283,548.69 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $10,335,255.75 |
| 3 | 08584 | Madden Contracting Co., LLC | $13,212,235.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Boh Bros. Construction Co., LLC. | - 3 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.6 | LUMP | 7,100.00 | 7,100.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 5,322.1 | SQYD | 18.00 | 95,797.80 | 12.50 | 66,526.25 | 50.00 | 266,105.00 | | 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | 62 | SQYD | 58.00 | 3,596.00 | 75.00 | 4,650.00 | 60.00 | 3,720.00 | | 0004 | 202-02-06120 | Removal of Curbs (Asphalt) | 5,134 | LNFT | 11.00 | 56,474.00 | 7.50 | 38,505.00 | 4.75 | 24,386.50 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 977 | LNFT | 18.00 | 17,586.00 | 25.00 | 24,425.00 | 25.00 | 24,425.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 4,368 | LNFT | 11.00 | 48,048.00 | 7.25 | 31,668.00 | 6.25 | 27,300.00 | | 0007 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 1,700.00 | 3,400.00 | 6,500.00 | 13,000.00 | 5,000.00 | 10,000.00 | | 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 6,992 | SQYD | 20.00 | 139,840.00 | 10.00 | 69,920.00 | 65.00 | 454,480.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 6 | EACH | 11.00 | 66.00 | 570.00 | 3,420.00 | 500.00 | 3,000.00 | | 0010 | 203-01-00100 | General Excavation | 2,238 | CUYD | 40.00 | 89,520.00 | 40.00 | 89,520.00 | 38.00 | 85,044.00 | | 0011 | 203-03-00100 | Embankment | 2,332 | CUYD | 20.00 | 46,640.00 | 60.00 | 139,920.00 | 77.22 | 180,077.04 | | 0012 | 502-01-00100 | Asphalt Concrete | 33,865.3 | TON | 92.00 | 3,115,607.60 | 100.00 | 3,386,530.00 | 118.03 | 3,997,121.36 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,442.4 | TON | 92.00 | 224,700.80 | 175.00 | 427,420.00 | 138.00 | 337,051.20 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 274,734 | SQYD | 2.50 | 686,835.00 | 3.50 | 961,569.00 | 2.65 | 728,045.10 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -11,448 | CUYD | 0.01 | -114.48 | 0.40 | -4,579.20 | 0.01 | -114.48 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 5,100 | SQYD | 95.00 | 484,500.00 | 205.00 | 1,045,500.00 | 112.23 | 572,373.00 | | 0017 | 602-10-00100 | Longitudinal Shoulder Joints | 2,534 | LNFT | 2.50 | 6,335.00 | 3.50 | 8,869.00 | 4.00 | 10,136.00 | | 0018 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 40 | LNFT | 250.00 | 10,000.00 | 200.00 | 8,000.00 | 260.00 | 10,400.00 | | 0019 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 16 | LNFT | 485.00 | 7,760.00 | 365.00 | 5,840.00 | 565.00 | 9,040.00 | | 0020 | 701-14-00100 | Cleaning Existing Pipes | 60 | LNFT | 28.00 | 1,680.00 | 25.00 | 1,500.00 | 59.00 | 3,540.00 | | 0021 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,500.00 | 5,000.00 | 6,500.00 | 13,000.00 | 4,000.00 | 8,000.00 | | 0022 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 3,130 | LNFT | 55.00 | 172,150.00 | 65.00 | 203,450.00 | 55.60 | 174,028.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,037.5 | LNFT | 40.00 | 41,500.00 | 40.00 | 41,500.00 | 36.25 | 37,609.38 | | 0024 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 20.8 | LNFT | 125.00 | 2,600.00 | 220.00 | 4,576.00 | 190.50 | 3,962.40 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 125.00 | 18,750.00 | 150.00 | 22,500.00 | 130.00 | 19,500.00 | | 0026 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,300.00 | 26,400.00 | 2,750.00 | 22,000.00 | 3,275.00 | 26,200.00 | | 0027 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,695.3 | SQYD | 75.00 | 127,147.50 | 50.00 | 84,765.00 | 100.00 | 169,530.00 | | 0028 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 61.1 | SQYD | 105.00 | 6,415.50 | 225.00 | 13,747.50 | 150.00 | 9,165.00 | | 0029 | 706-04-00100 | Handicapped Curb Ramps Type 10 | 1 | EACH | 3,700.00 | 3,700.00 | 5,800.00 | 5,800.00 | 4,500.00 | 4,500.00 | | 0030 | 707-01-00100 | Concrete Curb | 114 | LNFT | 85.00 | 9,690.00 | 140.00 | 15,960.00 | 35.00 | 3,990.00 | | 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 11,578 | LNFT | 40.00 | 463,120.00 | 41.25 | 477,592.50 | 49.00 | 567,322.00 | | 0032 | 707-04-00100 | Asphalt Curb | 1,152 | LNFT | 35.00 | 40,320.00 | 75.00 | 86,400.00 | 30.31 | 34,917.12 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 645,000.00 | 645,000.00 | 350,000.00 | 350,000.00 | 61,243.60 | 61,243.60 | | 0034 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 16,554 | LNFT | 1.00 | 16,554.00 | 0.60 | 9,932.40 | 0.50 | 8,277.00 | | 0035 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 300 | LNFT | 2.25 | 675.00 | 1.25 | 375.00 | 1.00 | 300.00 | | 0036 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 9,888 | LNFT | 4.50 | 44,496.00 | 1.75 | 17,304.00 | 1.50 | 14,832.00 | | 0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.232 | MILE | 11.00 | 277.55 | 375.00 | 9,462.00 | 350.00 | 8,831.20 | | 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.718 | MILE | 1,100.00 | 28,289.80 | 1,100.00 | 28,289.80 | 1,000.00 | 25,718.00 | | 0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 50.908 | MILE | 3,100.00 | 157,814.80 | 1,750.00 | 89,089.00 | 1,500.00 | 76,362.00 | | 0040 | 717-01-00100 | Seeding | 36 | LB | 20.00 | 720.00 | 20.00 | 720.00 | 18.68 | 672.48 | | 0041 | 718-01-00100 | Fertilizer | 732 | LB | 2.25 | 1,647.00 | 2.25 | 1,647.00 | 2.14 | 1,566.48 | | 0042 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 13.2 | MILE | 285.00 | 3,762.00 | 300.00 | 3,960.00 | 1,350.00 | 17,820.00 | | 0043 | 726-01-00100 | Bedding Material | 23.4 | CUYD | 115.00 | 2,691.00 | 115.00 | 2,691.00 | 90.00 | 2,106.00 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 815,000.00 | 815,000.00 | 1,852,051.72 | 1,852,051.72 | | 0045 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 227.5 | SQFT | 30.00 | 6,825.00 | 50.00 | 11,375.00 | 43.25 | 9,839.38 | | 0046 | 729-01-00103 | Sign (Type A)(Relocate) | 7.5 | SQFT | 1.50 | 11.25 | 60.00 | 450.00 | 49.75 | 373.13 | | 0047 | 729-08-00100 | Mounting (2 1/2" Size Post) | 23 | EACH | 2,300.00 | 52,900.00 | 1,775.00 | 40,825.00 | 1,800.00 | 41,400.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 11 | EACH | 105.00 | 1,155.00 | 90.00 | 990.00 | 75.00 | 825.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,976 | EACH | 15.00 | 74,640.00 | 23.00 | 114,448.00 | 20.00 | 99,520.00 | | 0050 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,127 | LNFT | 2.25 | 4,785.75 | 2.25 | 4,785.75 | 2.00 | 4,254.00 | | 0051 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 7,085 | LNFT | 4.50 | 31,882.50 | 9.25 | 65,536.25 | 8.00 | 56,680.00 | | 0052 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 4,944 | LNFT | 8.75 | 43,260.00 | 17.50 | 86,520.00 | 15.00 | 74,160.00 | | 0053 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 4,297 | LNFT | 18.00 | 77,346.00 | 30.00 | 128,910.00 | 25.00 | 107,425.00 | | 0054 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 711 | LNFT | 22.00 | 15,642.00 | 35.00 | 24,885.00 | 30.00 | 21,330.00 | | 0055 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,034 | LNFT | 4.25 | 4,394.50 | 9.50 | 9,823.00 | 8.00 | 8,272.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.252 | MILE | 9,910.00 | 270,067.32 | 10,000.00 | 272,520.00 | 8,500.00 | 231,642.00 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.542 | MILE | 5,100.00 | 63,964.20 | 4,000.00 | 50,168.00 | 3,500.00 | 43,897.00 | | 0058 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.162 | MILE | 4,400.00 | 712.80 | 4,500.00 | 729.00 | 4,000.00 | 648.00 | | 0059 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 1.2 | MILE | 11,000.00 | 13,200.00 | 8,750.00 | 10,500.00 | 7,500.00 | 9,000.00 | | 0060 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 40 | EACH | 550.00 | 22,000.00 | 525.00 | 21,000.00 | 450.00 | 18,000.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 13 | EACH | 550.00 | 7,150.00 | 525.00 | 6,825.00 | 450.00 | 5,850.00 | | 0062 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 14 | EACH | 1,100.00 | 15,400.00 | 575.00 | 8,050.00 | 500.00 | 7,000.00 | | 0063 | 732-05-00100 | Removal of Existing Markings | 0.54 | MILE | 28,000.00 | 15,120.00 | 30,000.00 | 16,200.00 | 25,000.00 | 13,500.00 | | 0064 | 736-09-00100 | Loop Detector | 1,405 | LNFT | 45.00 | 63,225.00 | 40.00 | 56,200.00 | 30.00 | 42,150.00 | | 0065 | 736-10-00200 | Underground Junction Box (Type E) | 11 | EACH | 2,100.00 | 23,100.00 | 2,000.00 | 22,000.00 | 3,500.00 | 38,500.00 | | 0066 | 737-04-00001 | Painted Curbs and Islands | 592 | LNFT | 11.00 | 6,512.00 | 2.25 | 1,332.00 | 2.00 | 1,184.00 | | 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0068 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) (4' x 3') Box Extension | 48 | LNFT | 1,800.00 | 86,400.00 | 900.00 | 43,200.00 | 750.00 | 36,000.00 | | 0069 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 100,858 | INLF | 0.75 | 75,643.50 | 0.75 | 75,643.50 | 4.00 | 403,432.00 | | 0070 | NS-600-00400 | Ultra-Thin Whitetopping (4 inch Thick) | 6,992 | SQYD | 110.00 | 769,120.00 | 78.00 | 545,376.00 | 285.00 | 1,992,720.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,283,548.69 | | 10,335,255.75 | | 13,212,235.61 |
|