Proposal:H.012022.6
Parish:East Baton Rouge
Description:BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, CONCRETE WALKS, PEDESTRIAN BRIDGE, PRECAST CONCRETE PILES, LANDSCAPING, AND RELATED WORK.
Estimated Construction Cost:$1,748,037.60
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $2,383,554.50 |
| 2 | 46747 | Triumph Construction, LLC | $2,930,000.00 |
| 3 | 54663 | CAPE Construction, LLC | $3,052,105.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - Triumph Construction, LLC | - 3 - CAPE Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5 | LUMP | 25,000.00 | 25,000.00 | 87,730.60 | 87,730.60 | 90,000.00 | 90,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 3,249.20 | 3,249.20 | 10,000.00 | 10,000.00 | | 0003 | 202-02-00030 | Removal of Pipe Rail Fence | 80 | LNFT | 25.00 | 2,000.00 | 47.05 | 3,764.00 | 29.12 | 2,329.60 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 773 | SQYD | 25.00 | 19,325.00 | 55.75 | 43,094.75 | 21.24 | 16,418.52 | | 0005 | 202-02-12020 | Removal of Fence (Chain Link) | 47 | LNFT | 25.00 | 1,175.00 | 22.05 | 1,036.35 | 5.50 | 258.50 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 173,274.00 | 173,274.00 | 79,000.00 | 79,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 250.00 | 1,250.00 | 128.95 | 644.75 | 145.20 | 726.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,310 | LNFT | 5.00 | 16,550.00 | 2.20 | 7,282.00 | 1.98 | 6,553.80 | | 0009 | 302-02-06020 | Class II Base Course (6" Thick) (Crushed Stone) | 11,704.1 | SQYD | 30.00 | 351,123.00 | 25.00 | 292,602.50 | 30.00 | 351,123.00 | | 0010 | 701-07-00300 | Yard Drain Pipe (8") | 166 | LNFT | 50.00 | 8,300.00 | 30.70 | 5,096.20 | 67.58 | 11,218.28 | | 0011 | 705-06-00700 | Chain Link Fence (10 Foot Height) | 580 | LNFT | 120.00 | 69,600.00 | 52.30 | 30,334.00 | 70.00 | 40,600.00 | | 0012 | 706-01-00300 | Concrete Walk (6" Thick) | 9,750.9 | SQYD | 75.00 | 731,317.50 | 92.85 | 905,371.07 | 97.00 | 945,837.30 | | 0013 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 227.1 | SQYD | 70.00 | 15,897.00 | 63.00 | 14,307.30 | 65.00 | 14,761.50 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 59,891.25 | 59,891.25 | 150,000.00 | 150,000.00 | | 0015 | 714-01-00500 | Slab Sodding (Common Bermuda) | 5,134 | SQYD | 10.00 | 51,340.00 | 5.50 | 28,237.00 | 10.00 | 51,340.00 | | 0016 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) (Cow Oak) | 2 | EACH | 500.00 | 1,000.00 | 652.15 | 1,304.30 | 400.00 | 800.00 | | 0017 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) (Shumard Oak) | 4 | EACH | 500.00 | 2,000.00 | 627.05 | 2,508.20 | 1,000.00 | 4,000.00 | | 0018 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) (Tulip Poplar) | 5 | EACH | 500.00 | 2,500.00 | 652.15 | 3,260.75 | 100.00 | 500.00 | | 0019 | 726-01-00100 | Bedding Material | 11.3 | CUYD | 100.00 | 1,130.00 | 107.80 | 1,218.14 | 86.00 | 971.80 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 230,000.00 | 230,000.00 | 240,135.78 | 240,135.78 | 250,000.00 | 250,000.00 | | 0021 | 729-01-00100 | Sign (Type A) | 22.1 | SQFT | 50.00 | 1,105.00 | 28.55 | 630.96 | 28.50 | 629.85 | | 0022 | 729-21-00100 | U-Channel Post | 9 | EACH | 250.00 | 2,250.00 | 199.55 | 1,795.95 | 120.00 | 1,080.00 | | 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.613 | MILE | 5,000.00 | 8,065.00 | 6,840.35 | 11,033.48 | 1,734.50 | 2,797.75 | | 0024 | 739-01-00100 | Hydro-Seeding | 0.57 | ACRE | 15,000.00 | 8,550.00 | 9,817.85 | 5,596.17 | 2,441.00 | 1,391.37 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 72,541.80 | 72,541.80 | 45,000.00 | 45,000.00 | | 0026 | 802-01-00100 | Structural Excavation (Bents) | 63 | CUYD | 50.00 | 3,150.00 | 82.90 | 5,222.70 | 51.00 | 3,213.00 | | 0027 | 804-01-00200 | Precast Concrete Piles (14") | 540 | LNFT | 100.00 | 54,000.00 | 400.00 | 216,000.00 | 103.55 | 55,917.00 | | 0028 | 804-18-00100 | Vibration Monitoring | 3 | DAY | 1,250.00 | 3,750.00 | 1,709.75 | 5,129.25 | 669.00 | 2,007.00 | | 0029 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 44 | CUYD | 2,500.00 | 110,000.00 | 2,458.10 | 108,156.40 | 1,445.00 | 63,580.00 | | 0030 | 805-01-00900 | Class A1 Concrete (Boardwalk End Walls) | 4.74 | CUYD | 2,500.00 | 11,850.00 | 2,960.40 | 14,032.30 | 2,600.00 | 12,324.00 | | 0031 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,146 | SQFT | 1.00 | 1,146.00 | 4.55 | 5,214.30 | 0.95 | 1,088.70 | | 0032 | 806-01-00100 | Deformed Reinforcing Steel | 5,876 | LB | 1.00 | 5,876.00 | 3.30 | 19,390.80 | 1.30 | 7,638.80 | | 0033 | NS-719-00003 | Root Pruning | 1 | LUMP | 10,000.00 | 10,000.00 | 3,990.20 | 3,990.20 | 28,000.00 | 28,000.00 | | 0034 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 423 | SQYD | 35.00 | 14,805.00 | 67.20 | 28,425.60 | 100.00 | 42,300.00 | | 0035 | TS-700-03000 | Walks (Boardwalk) (Metal) | 1 | LUMP | 150,000.00 | 150,000.00 | 258,491.00 | 258,491.00 | 350,000.00 | 350,000.00 | | 0036 | TS-705-00100 | Fence Wind Screen (10 foot height) | 580 | LF | 25.00 | 14,500.00 | 20.30 | 11,774.00 | 15.00 | 8,700.00 | | 0037 | TS-800-00100 | Pedestrian Bridge (Steel Half Through Truss) | 1 | LUMP | 200,000.00 | 200,000.00 | 258,232.95 | 258,232.95 | 400,000.00 | 400,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,383,554.50 | | 2,930,000.00 | | 3,052,105.77 |
|