Proposal:H.011577.6
Parish:Ascension, St. James
Routes:LA 18
Description:LA 18: SUNSHINE BR - LA 3120
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,864,989.07
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $2,446,655.45 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,687,736.60 |
| 3 | 06276 | Barriere Construction Co., LLC | $3,053,747.04 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $3,609,412.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Barriere Construction Co., LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 46 | LNFT | 13.87 | 638.02 | 25.00 | 1,150.00 | 30.00 | 1,380.00 | 125.00 | 5,750.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24"CMP 12" CMP | 449 | LNFT | 15.55 | 6,981.95 | 25.00 | 11,225.00 | 30.00 | 13,470.00 | 75.00 | 33,675.00 | | 0003 | 202-02-32180 | Removal of Pipe Headwalls | 8 | EACH | 1,351.30 | 10,810.40 | 1,300.00 | 10,400.00 | 1,500.00 | 12,000.00 | 2,750.00 | 22,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 400 | CUYD | 6.33 | 2,532.00 | 60.00 | 24,000.00 | 45.00 | 18,000.00 | 75.00 | 30,000.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 4,000 | LNFT | 9.69 | 38,760.00 | 8.00 | 32,000.00 | 1.25 | 5,000.00 | 11.00 | 44,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 108 | EACH | 26.25 | 2,835.00 | 70.00 | 7,560.00 | 25.00 | 2,700.00 | 125.00 | 13,500.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 2,698 | LNFT | 2.10 | 5,665.80 | 1.75 | 4,721.50 | 2.25 | 6,070.50 | 1.50 | 4,047.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 138 | CUYD | 18.98 | 2,619.24 | 88.00 | 12,144.00 | 23.00 | 3,174.00 | 125.00 | 17,250.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 17,446.1 | TON | 80.00 | 1,395,688.00 | 82.00 | 1,430,580.20 | 105.00 | 1,831,840.50 | 125.00 | 2,180,762.50 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 611.7 | TON | 110.00 | 67,287.00 | 165.00 | 100,930.50 | 175.00 | 107,047.50 | 200.00 | 122,340.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 77,978 | SQYD | 1.90 | 148,158.20 | 3.00 | 233,934.00 | 2.55 | 198,843.90 | 3.25 | 253,428.50 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,261 | CUYD | 0.01 | -32.61 | 0.00 | 0.00 | 1.00 | -3,261.00 | 1.00 | -3,261.00 | | 0013 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,448 | SQYD | 124.05 | 179,624.40 | 160.00 | 231,680.00 | 130.00 | 188,240.00 | 175.00 | 253,400.00 | | 0014 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 568 | LNFT | 243.96 | 138,569.28 | 180.00 | 102,240.00 | 220.00 | 124,960.00 | 130.00 | 73,840.00 | | 0015 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 64 | LNFT | 294.97 | 18,878.08 | 315.00 | 20,160.00 | 350.00 | 22,400.00 | 150.00 | 9,600.00 | | 0016 | 701-15-00100 | Concrete Collar | 5 | EACH | 966.00 | 4,830.00 | 3,000.00 | 15,000.00 | 2,500.00 | 12,500.00 | 1,500.00 | 7,500.00 | | 0017 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 568 | LNFT | 15.70 | 8,917.60 | 0.00 | 0.00 | 1.25 | 710.00 | 8.00 | 4,544.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | 165,000.00 | 165,000.00 | 125,000.00 | 125,000.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.22 | MILE | 226.03 | 2,310.03 | 250.00 | 2,555.00 | 320.00 | 3,270.40 | 350.00 | 3,577.00 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.112 | MILE | 524.88 | 4,782.71 | 650.00 | 5,922.80 | 650.00 | 5,922.80 | 1,000.00 | 9,112.00 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 30.584 | MILE | 629.92 | 19,265.47 | 950.00 | 29,054.80 | 1,000.00 | 30,584.00 | 1,500.00 | 45,876.00 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.224 | MILE | 273.16 | 2,792.79 | 300.00 | 3,067.20 | 260.00 | 2,658.24 | 250.00 | 2,556.00 | | 0023 | 726-01-00100 | Bedding Material | 232.9 | CUYD | 100.09 | 23,310.96 | 100.00 | 23,290.00 | 90.00 | 20,961.00 | 250.00 | 58,225.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 | 140,000.00 | 140,000.00 | 120,000.00 | 120,000.00 | | 0025 | 729-16-00200 | Object Marker Assembly (Type 2) | 38 | EACH | 89.25 | 3,391.50 | 90.00 | 3,420.00 | 85.00 | 3,230.00 | 75.00 | 2,850.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 766 | EACH | 15.75 | 12,064.50 | 7.00 | 5,362.00 | 11.00 | 8,426.00 | 15.00 | 11,490.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.292 | MILE | 7,873.97 | 120,408.75 | 4,700.00 | 71,872.40 | 4,500.00 | 68,814.00 | 7,750.00 | 118,513.00 | | 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.556 | MILE | 2,101.84 | 9,575.98 | 1,200.00 | 5,467.20 | 1,200.00 | 5,467.20 | 2,000.00 | 9,112.00 | | 0029 | 735-01-00100 | Mailboxes | 63 | EACH | 1.05 | 66.15 | 1.00 | 63.00 | 1.00 | 63.00 | 1.00 | 63.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 59 | EACH | 252.00 | 14,868.00 | 250.00 | 14,750.00 | 250.00 | 14,750.00 | 230.00 | 13,570.00 | | 0031 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 472.50 | 945.00 | 475.00 | 950.00 | 450.00 | 900.00 | 360.00 | 720.00 | | 0032 | 739-01-00100 | Hydro-Seeding | 2.49 | ACRE | 2,625.00 | 6,536.25 | 1,300.00 | 3,237.00 | 2,500.00 | 6,225.00 | 2,800.00 | 6,972.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,175.00 | 5,175.00 | 11,000.00 | 11,000.00 | 26,000.00 | 26,000.00 | 5,000.00 | 5,000.00 | | 0034 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 4,200.00 | 8,400.00 | 10,000.00 | 20,000.00 | 3,200.00 | 6,400.00 | 2,200.00 | 4,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,446,655.45 | | 2,687,736.60 | | 3,053,747.04 | | 3,609,412.00 |
|