Proposal:H.010922.6
Parish:Iberia
Routes:LA 88
Description:LA 88: REALIGN CURVES IN COTEAU
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, PAVEMENT PATCHING, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost:$3,546,085.70
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $4,843,999.60 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $4,917,000.00 |
| 3 | 30774 | Progressive Construction Co., LLC | $5,530,970.38 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 10.7 | LUMP | 98,650.00 | 98,650.00 | 22,750.11 | 22,750.11 | 140,000.00 | 140,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,750.00 | 11,750.00 | 35,800.00 | 35,800.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-00010 | Removal of Sewer Lift Station (Sta. 135+75, Left) | 1 | EACH | 1,300.00 | 1,300.00 | 10,500.00 | 10,500.00 | 6,400.00 | 6,400.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 5,305.9 | SQYD | 5.20 | 27,590.68 | 14.00 | 74,282.60 | 4.00 | 21,223.60 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 402.7 | SQYD | 18.20 | 7,329.14 | 17.25 | 6,946.58 | 8.25 | 3,322.28 | | 0006 | 202-02-05000 | Removal of Building (Sta. 133+50, Right) (Mobile Home with wood frame carport, rear porch with deck, storage room) | 1 | EACH | 8,815.00 | 8,815.00 | 15,700.00 | 15,700.00 | 3,000.00 | 3,000.00 | | 0007 | 202-02-05000 | Removal of Building (Sta. 134+75, On & Left) (Mobile Home with metal canopy) | 1 | EACH | 4,615.00 | 4,615.00 | 9,500.00 | 9,500.00 | 3,000.00 | 3,000.00 | | 0008 | 202-02-05000 | Removal of Building (Sta. 135+00, Left) (Mobile Home with porch) | 1 | EACH | 4,615.00 | 4,615.00 | 9,500.00 | 9,500.00 | 3,000.00 | 3,000.00 | | 0009 | 202-02-05000 | Removal of Building (Sta. 135+25, right) (Mobile Home with porch) | 1 | EACH | 4,615.00 | 4,615.00 | 9,500.00 | 9,500.00 | 3,000.00 | 3,000.00 | | 0010 | 202-02-05000 | Removal of Building (Sta. 135+50, On & Left) (Mobile Home) | 1 | EACH | 4,615.00 | 4,615.00 | 9,500.00 | 9,500.00 | 3,000.00 | 3,000.00 | | 0011 | 202-02-12000 | Removal of Fence | 943 | LNFT | 8.10 | 7,638.30 | 5.50 | 5,186.50 | 6.00 | 5,658.00 | | 0012 | 202-02-12020 | Removal of Fence (Chain Link) | 130 | LNFT | 9.90 | 1,287.00 | 11.25 | 1,462.50 | 6.50 | 845.00 | | 0013 | 202-02-38000 | Removal of Septic System (Sta. 134+75, Left) (1500 gallon) | 1 | EACH | 2,335.00 | 2,335.00 | 5,000.00 | 5,000.00 | 5,500.00 | 5,500.00 | | 0014 | 202-02-38000 | Removal of Septic System (Sta. 135+00, Left) (500 gallon) | 1 | EACH | 1,475.00 | 1,475.00 | 2,900.00 | 2,900.00 | 3,800.00 | 3,800.00 | | 0015 | 202-02-38200 | Removal of Signs | 1 | EACH | 75.00 | 75.00 | 60.00 | 60.00 | 1,800.00 | 1,800.00 | | 0016 | 203-02-00100 | Drainage Excavation | 1,299 | CUYD | 7.50 | 9,742.50 | 14.00 | 18,186.00 | 28.00 | 36,372.00 | | 0017 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 662,140.00 | 662,140.00 | 717,000.00 | 717,000.00 | 702,000.00 | 702,000.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 19 | EACH | 30.00 | 570.00 | 52.50 | 997.50 | 10.00 | 190.00 | | 0019 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 175.00 | 525.00 | 240.00 | 720.00 | 185.00 | 555.00 | | 0020 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 6 | EACH | 800.00 | 4,800.00 | 380.00 | 2,280.00 | 2,300.00 | 13,800.00 | | 0021 | 204-06-00100 | Temporary Silt Fencing | 11,889 | LNFT | 2.26 | 26,869.14 | 2.10 | 24,966.90 | 3.00 | 35,667.00 | | 0022 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 18,164.4 | SQYD | 22.14 | 402,159.82 | 19.00 | 345,123.60 | 25.00 | 454,110.00 | | 0023 | 304-01-00100 | Lime | 274.4 | TON | 265.00 | 72,716.00 | 286.00 | 78,478.40 | 306.00 | 83,966.40 | | 0024 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 6,452 | SQYD | 3.65 | 23,549.80 | 3.90 | 25,162.80 | 9.00 | 58,068.00 | | 0025 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 18,563.3 | SQYD | 19.60 | 363,840.68 | 22.00 | 408,392.60 | 21.00 | 389,829.30 | | 0026 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 200 | CUYD | 186.65 | 37,330.00 | 119.00 | 23,800.00 | 140.00 | 28,000.00 | | 0027 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 131.50 | 26,300.00 | 94.00 | 18,800.00 | 113.00 | 22,600.00 | | 0028 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 1,100 | SQYD | 52.60 | 57,860.00 | 66.00 | 72,600.00 | 60.00 | 66,000.00 | | 0029 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 131.50 | 13,150.00 | 94.00 | 9,400.00 | 113.00 | 11,300.00 | | 0030 | 502-01-00100 | Asphalt Concrete | 8,818.9 | TON | 112.60 | 993,008.14 | 129.00 | 1,137,638.10 | 170.00 | 1,499,213.00 | | 0031 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 801.6 | TON | 135.00 | 108,216.00 | 165.00 | 132,264.00 | 275.00 | 220,440.00 | | 0032 | 509-01-00100 | Milling Asphalt Pavement | 2,305 | SQYD | 12.00 | 27,660.00 | 17.20 | 39,646.00 | 15.00 | 34,575.00 | | 0033 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -110 | CUYD | 0.10 | -11.00 | 0.01 | -1.10 | 0.01 | -1.10 | | 0034 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 89 | SQYD | 210.00 | 18,690.00 | 470.00 | 41,830.00 | 203.00 | 18,067.00 | | 0035 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 574 | LNFT | 220.00 | 126,280.00 | 235.00 | 134,890.00 | 140.00 | 80,360.00 | | 0036 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 120 | LNFT | 275.00 | 33,000.00 | 250.00 | 30,000.00 | 195.00 | 23,400.00 | | 0037 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 160 | LNFT | 385.00 | 61,600.00 | 338.00 | 54,080.00 | 215.00 | 34,400.00 | | 0038 | 701-01-01081 | Cross Drain Pipe (48" RCP) | 438 | LNFT | 480.00 | 210,240.00 | 461.00 | 201,918.00 | 225.00 | 98,550.00 | | 0039 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 148 | LNFT | 335.00 | 49,580.00 | 209.00 | 30,932.00 | 205.00 | 30,340.00 | | 0040 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 724 | LNFT | 79.00 | 57,196.00 | 115.00 | 83,260.00 | 90.00 | 65,160.00 | | 0041 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 50 | LNFT | 98.00 | 4,900.00 | 198.00 | 9,900.00 | 135.00 | 6,750.00 | | 0042 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 64 | LNFT | 83.00 | 5,312.00 | 135.50 | 8,672.00 | 120.00 | 7,680.00 | | 0043 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 195 | LNFT | 94.00 | 18,330.00 | 129.00 | 25,155.00 | 135.00 | 26,325.00 | | 0044 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 74 | LNFT | 141.00 | 10,434.00 | 194.00 | 14,356.00 | 200.00 | 14,800.00 | | 0045 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 276 | LNFT | 79.00 | 21,804.00 | 109.00 | 30,084.00 | 95.00 | 26,220.00 | | 0046 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 151 | LNFT | 99.00 | 14,949.00 | 136.00 | 20,536.00 | 110.00 | 16,610.00 | | 0047 | 701-05-01101 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CMP) | 74 | LNFT | 156.00 | 11,544.00 | 180.00 | 13,320.00 | 150.00 | 11,100.00 | | 0048 | 701-07-00200 | Yard Drain Pipe (6") | 15 | LNFT | 49.00 | 735.00 | 94.00 | 1,410.00 | 28.00 | 420.00 | | 0049 | 701-10-01000 | Reinforced Concrete Pipe (Extension) (12") | 14 | LNFT | 68.00 | 952.00 | 275.00 | 3,850.00 | 175.00 | 2,450.00 | | 0050 | 701-15-00100 | Concrete Collar | 2 | EACH | 300.00 | 600.00 | 771.00 | 1,542.00 | 1,600.00 | 3,200.00 | | 0051 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 400 | LNFT | 22.00 | 8,800.00 | 8.00 | 3,200.00 | 11.00 | 4,400.00 | | 0052 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 3,255.00 | 58,590.00 | 3,484.00 | 62,712.00 | 4,600.00 | 82,800.00 | | 0053 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,820.00 | 3,820.00 | 14,415.00 | 14,415.00 | 4,600.00 | 4,600.00 | | 0054 | 702-03-00400 | Catch Basins (CB-05) | 2 | EACH | 1,700.00 | 3,400.00 | 1,565.00 | 3,130.00 | 2,000.00 | 4,000.00 | | 0055 | 702-03-01100 | Catch Basins (CB-SD02) | 1 | EACH | 23,331.00 | 23,331.00 | 14,380.00 | 14,380.00 | 12,000.00 | 12,000.00 | | 0056 | 702-07-00100 | Cross Drain Safety End (Type 1) | 4 | EACH | 6,330.00 | 25,320.00 | 6,266.00 | 25,064.00 | 5,200.00 | 20,800.00 | | 0057 | 702-08-00100 | Side Drain Safety End (Type 1) | 15 | EACH | 2,510.00 | 37,650.00 | 3,042.00 | 45,630.00 | 3,200.00 | 48,000.00 | | 0058 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 3,075.00 | 6,150.00 | 6,177.00 | 12,354.00 | 18,000.00 | 36,000.00 | | 0059 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 381 | LNFT | 58.08 | 22,128.48 | 51.50 | 19,621.50 | 23.00 | 8,763.00 | | 0060 | 705-08-07000 | 16-Foot Double Gates for Chain Link Fence (4-Foot Height) | 1 | DBGT | 57.00 | 57.00 | 2,055.00 | 2,055.00 | 1,400.00 | 1,400.00 | | 0061 | 705-08-10000 | 22-Foot Double Gates for Chain Link Fence (4-Foot Height) | 1 | DBGT | 3,194.13 | 3,194.13 | 2,825.00 | 2,825.00 | 1,750.00 | 1,750.00 | | 0062 | 708-01-00100 | Right-of-Way Monument | 43 | EACH | 31.11 | 1,337.73 | 411.00 | 17,673.00 | 300.00 | 12,900.00 | | 0063 | 708-02-00100 | Right-of-Way Monument Witness Post | 43 | EACH | 56.56 | 2,432.08 | 411.00 | 17,673.00 | 300.00 | 12,900.00 | | 0064 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,155 | SQYD | 70.50 | 81,427.50 | 80.00 | 92,400.00 | 68.00 | 78,540.00 | | 0065 | 711-04-00100 | Geotextile Fabric | 1,155 | SQYD | 2.50 | 2,887.50 | 2.85 | 3,291.75 | 2.00 | 2,310.00 | | 0066 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 38,800.00 | 38,800.00 | 22,000.00 | 22,000.00 | 50,000.00 | 50,000.00 | | 0067 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,250 | LNFT | 1.16 | 3,770.00 | 1.03 | 3,347.50 | 0.30 | 975.00 | | 0068 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 104 | LNFT | 2.32 | 241.28 | 2.05 | 213.20 | 0.90 | 93.60 | | 0069 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.062 | MILE | 500.00 | 3,531.00 | 1,233.00 | 8,707.45 | 2,350.00 | 16,595.70 | | 0070 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.662 | MILE | 1,393.80 | 922.70 | 1,233.00 | 816.25 | 1,175.00 | 777.85 | | 0071 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.972 | MILE | 1,742.25 | 20,858.22 | 1,541.00 | 18,448.85 | 1,175.00 | 14,067.10 | | 0072 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 12 | EACH | 116.15 | 1,393.80 | 103.00 | 1,236.00 | 29.40 | 352.80 | | 0073 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 116.15 | 464.60 | 103.00 | 412.00 | 29.40 | 117.60 | | 0074 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 22,068.50 | 44,137.00 | 11,110.00 | 22,220.00 | 11,470.00 | 22,940.00 | | 0075 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,400.00 | 12,400.00 | 23,200.00 | 23,200.00 | 15,000.00 | 15,000.00 | | 0076 | 726-01-00100 | Bedding Material | 344.1 | CUYD | 88.00 | 30,280.80 | 141.00 | 48,518.10 | 100.00 | 34,410.00 | | 0077 | 727-01-00100 | Mobilization | 1 | LUMP | 480,125.00 | 480,125.00 | 288,000.00 | 288,000.00 | 550,000.00 | 550,000.00 | | 0078 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 45 | SQFT | 34.85 | 1,568.25 | 31.00 | 1,395.00 | 29.40 | 1,323.00 | | 0079 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 63.88 | 511.04 | 57.00 | 456.00 | 88.25 | 706.00 | | 0080 | 729-19-00100 | Dead End Road Installations (Type A) | 2 | EACH | 3,484.50 | 6,969.00 | 3,082.00 | 6,164.00 | 3,825.00 | 7,650.00 | | 0081 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,103.43 | 1,103.43 | 976.00 | 976.00 | 1,120.00 | 1,120.00 | | 0082 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 203.26 | 1,016.30 | 180.00 | 900.00 | 206.00 | 1,030.00 | | 0083 | 731-02-00100 | Reflectorized Raised Pavement Markers | 998 | EACH | 11.62 | 11,596.76 | 10.50 | 10,479.00 | 8.25 | 8,233.50 | | 0084 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 419 | LNFT | 5.81 | 2,434.39 | 5.20 | 2,178.80 | 5.90 | 2,472.10 | | 0085 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 52 | LNFT | 32.52 | 1,691.04 | 29.00 | 1,508.00 | 29.40 | 1,528.80 | | 0086 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,206 | LNFT | 6.97 | 8,405.82 | 6.20 | 7,477.20 | 2.35 | 2,834.10 | | 0087 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.986 | MILE | 6,388.25 | 38,240.06 | 5,651.00 | 33,826.89 | 5,530.00 | 33,102.58 | | 0088 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.331 | MILE | 2,323.00 | 768.91 | 2,055.00 | 680.21 | 2,941.00 | 973.47 | | 0089 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 696.90 | 4,181.40 | 617.00 | 3,702.00 | 559.00 | 3,354.00 | | 0090 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 696.90 | 1,393.80 | 617.00 | 1,234.00 | 559.00 | 1,118.00 | | 0091 | 735-01-00100 | Mailboxes | 5 | EACH | 23.23 | 116.15 | 26.00 | 130.00 | 1.20 | 6.00 | | 0092 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 156.80 | 784.00 | 309.00 | 1,545.00 | 260.00 | 1,300.00 | | 0093 | 739-01-00100 | Hydro-Seeding | 10.63 | ACRE | 2,613.38 | 27,780.23 | 2,400.00 | 25,512.00 | 2,650.00 | 28,169.50 | | 0094 | 740-01-00100 | Construction Layout | 1 | LUMP | 107,700.00 | 107,700.00 | 31,934.21 | 31,934.21 | 37,000.00 | 37,000.00 | | 0095 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 26,864 | INLF | 1.75 | 47,012.00 | 1.25 | 33,580.00 | 0.80 | 21,491.20 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,843,999.60 | | 4,917,000.00 | | 5,530,970.38 |
|