Proposal:H.014614.6
Parish:Iberville
Routes:LA 1148
Description:LA 1148: LA 1 - LA 988
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$565,147.06
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $623,283.85 |
| 2 | 06276 | Barriere Construction Co., LLC | $655,781.65 |
| 3 | 69570 | Bridging The Gap, L.L.C. | $928,200.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | - 3 - Bridging The Gap, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 32 | CUYD | 60.00 | 1,920.00 | 19.00 | 608.00 | 250.00 | 8,000.00 | | 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 100.00 | 1,500.00 | 100.00 | 1,500.00 | 50.00 | 750.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 391.6 | TON | 120.00 | 46,992.00 | 140.00 | 54,824.00 | 200.00 | 78,320.00 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 84.6 | TON | 155.00 | 13,113.00 | 185.00 | 15,651.00 | 200.00 | 16,920.00 | | 0005 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 1,611.9 | TON | 135.00 | 217,606.50 | 139.00 | 224,054.10 | 200.00 | 322,380.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 18,982 | SQYD | 2.50 | 47,455.00 | 2.50 | 47,455.00 | 10.00 | 189,820.00 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -418 | CUYD | 0.00 | 0.00 | 0.01 | -4.18 | 0.01 | -4.18 | | 0008 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 900 | LNFT | 3.00 | 2,700.00 | 3.00 | 2,700.00 | 7.00 | 6,300.00 | | 0009 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 195 | LNFT | 3.00 | 585.00 | 3.00 | 585.00 | 10.00 | 1,950.00 | | 0010 | 602-03-00100 | Cleaning and Sealing Random Cracks | 110 | LNFT | 5.00 | 550.00 | 3.50 | 385.00 | 5.00 | 550.00 | | 0011 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 160.2 | SQYD | 300.00 | 48,060.00 | 470.00 | 75,294.00 | 325.00 | 52,065.00 | | 0012 | 602-10-00100 | Longitudinal Shoulder Joints | 300 | LNFT | 1.85 | 555.00 | 2.50 | 750.00 | 5.00 | 1,500.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 4,000.00 | 4,000.00 | 5,500.00 | 5,500.00 | 1,500.00 | 1,500.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 55,000.00 | 55,000.00 | 25,000.00 | 25,000.00 | | 0015 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,600 | LNFT | 0.25 | 400.00 | 1.00 | 1,600.00 | 1.00 | 1,600.00 | | 0016 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 735 | LNFT | 0.50 | 367.50 | 1.00 | 735.00 | 2.00 | 1,470.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.061 | MILE | 250.00 | 265.25 | 325.00 | 344.83 | 1,000.00 | 1,061.00 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.21 | MILE | 1,500.00 | 315.00 | 1,500.00 | 315.00 | 1,500.00 | 315.00 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.294 | MILE | 1,500.00 | 4,941.00 | 1,500.00 | 4,941.00 | 2,500.00 | 8,235.00 | | 0020 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 1 | EACH | 35.00 | 35.00 | 35.00 | 35.00 | 75.00 | 75.00 | | 0021 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 35.00 | 70.00 | 35.00 | 70.00 | 50.00 | 100.00 | | 0022 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 1 | EACH | 35.00 | 35.00 | 35.00 | 35.00 | 50.00 | 50.00 | | 0023 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.4 | MILE | 450.00 | 630.00 | 400.00 | 560.00 | 2,200.00 | 3,080.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 50,500.00 | 50,500.00 | 95,000.00 | 95,000.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 309 | EACH | 7.40 | 2,286.60 | 7.00 | 2,163.00 | 15.00 | 4,635.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,600 | LNFT | 4.20 | 6,720.00 | 5.00 | 8,000.00 | 4.00 | 6,400.00 | | 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 687 | LNFT | 17.00 | 11,679.00 | 16.50 | 11,335.50 | 20.00 | 13,740.00 | | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 17.00 | 816.00 | 20.00 | 960.00 | 25.00 | 1,200.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.294 | MILE | 5,000.00 | 16,470.00 | 4,900.00 | 16,140.60 | 6,000.00 | 19,764.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.21 | MILE | 2,600.00 | 546.00 | 2,800.00 | 588.00 | 2,000.00 | 420.00 | | 0031 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 500.00 | 500.00 | 550.00 | 550.00 | 750.00 | 750.00 | | 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 475.00 | 950.00 | 450.00 | 900.00 | 450.00 | 900.00 | | 0033 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 475.00 | 475.00 | 500.00 | 500.00 | 450.00 | 450.00 | | 0034 | 732-05-00100 | Removal of Existing Markings | 0.028 | MILE | 25,000.00 | 700.00 | 27,000.00 | 756.00 | 15,000.00 | 420.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 1.033 | ACRE | 2,000.00 | 2,066.00 | 4,000.00 | 4,132.00 | 5,000.00 | 5,165.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | | 0037 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 16,206 | LNFT | 1.85 | 29,981.10 | 1.50 | 24,309.00 | 0.65 | 10,533.90 | | 0038 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 6,594 | LNFT | 1.85 | 12,198.90 | 1.70 | 11,209.80 | 0.65 | 4,286.10 | | 0039 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 22,800 | LNFT | 1.00 | 22,800.00 | 1.00 | 22,800.00 | 1.25 | 28,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 623,283.85 | | 655,781.65 | | 928,200.82 |
|