Proposal:H.012940.6
Parish:Terrebonne
Routes:LA 665
Description:LA 665: HOPE FARM RD - PAW PAW CT
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,837,627.82
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $2,252,361.92 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,478,939.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of Aggregate Driveways | 6,978 | SQYD | 5.00 | 34,890.00 | 1.00 | 6,978.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 113.2 | SQYD | 31.00 | 3,509.20 | 28.00 | 3,169.60 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 32 | SQYD | 55.00 | 1,760.00 | 30.00 | 960.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 446 | LNFT | 16.00 | 7,136.00 | 38.00 | 16,948.00 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 27 | EACH | 10.00 | 270.00 | 70.00 | 1,890.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 177 | CUYD | 70.00 | 12,390.00 | 50.00 | 8,850.00 | | 0007 | 501-01-00100 | Thin Asphalt Concrete (Dense Mix) | 2,846.5 | TON | 110.00 | 313,115.00 | 155.00 | 441,207.50 | | 0008 | 502-01-00100 | Asphalt Concrete | 5,057.7 | TON | 100.00 | 505,770.00 | 135.00 | 682,789.50 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,915.5 | TON | 175.00 | 335,212.50 | 1.00 | 1,915.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 48,222 | SQYD | 2.00 | 96,444.00 | 4.00 | 192,888.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,660 | CUYD | 0.01 | -26.60 | 1.00 | -2,660.00 | | 0012 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 2,094 | SQYD | 112.00 | 234,528.00 | 105.00 | 219,870.00 | | 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.6 | LNFT | 25.00 | 940.00 | 125.00 | 4,700.00 | | 0014 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 55.00 | 2,750.00 | 65.00 | 3,250.00 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | 100.00 | 10,000.00 | | 0016 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 2,750.00 | 2,750.00 | 3,200.00 | 3,200.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 2,950.00 | 8,850.00 | 4,100.00 | 12,300.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 31.2 | SQYD | 175.00 | 5,460.00 | 120.00 | 3,744.00 | | 0019 | 711-03-00400 | Riprap (55 lb) | 125.8 | TON | 165.00 | 20,757.00 | 150.00 | 18,870.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 69 | SQYD | 35.00 | 2,415.00 | 6.00 | 414.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 200,000.00 | 200,000.00 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 44 | LNFT | 0.35 | 15.40 | 0.50 | 22.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.676 | MILE | 170.00 | 1,814.92 | 275.00 | 2,935.90 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.17 | MILE | 850.00 | 10,344.50 | 1,300.00 | 15,821.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 39.034 | MILE | 1,500.00 | 58,551.00 | 1,800.00 | 70,261.20 | | 0026 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 4 | EACH | 100.00 | 400.00 | 135.00 | 540.00 | | 0027 | 717-01-00100 | Seeding | 95 | LB | 15.00 | 1,425.00 | 40.00 | 3,800.00 | | 0028 | 718-01-00100 | Fertilizer | 2,100 | LB | 0.75 | 1,575.00 | 2.25 | 4,725.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 225,500.00 | 225,500.00 | | 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 32 | EACH | 90.00 | 2,880.00 | 100.00 | 3,200.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 5 | EACH | 95.00 | 475.00 | 125.00 | 625.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,840 | EACH | 10.00 | 18,400.00 | 12.25 | 22,540.00 | | 0033 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 44 | LNFT | 5.00 | 220.00 | 6.25 | 275.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.506 | MILE | 5,500.00 | 151,283.00 | 6,600.00 | 181,539.60 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.302 | MILE | 1,750.00 | 9,278.50 | 2,300.00 | 12,194.60 | | 0036 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | 2 | EACH | 600.00 | 1,200.00 | 725.00 | 1,450.00 | | 0037 | 732-05-00100 | Removal of Existing Markings | 0.047 | MILE | 50,000.00 | 2,350.00 | 70,000.00 | 3,290.00 | | 0038 | 735-01-00100 | Mailboxes | 337 | EACH | 5.00 | 1,685.00 | 26.00 | 8,762.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 243 | EACH | 200.00 | 48,600.00 | 185.00 | 44,955.00 | | 0040 | 735-03-00100 | Mailbox Supports (Double) | 47 | EACH | 430.00 | 20,210.00 | 250.00 | 11,750.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,469 | INLF | 0.50 | 1,734.50 | 1.00 | 3,469.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,252,361.92 | | 2,478,939.40 |
|