Proposal:H.012308.6
Parish:Livingston
Routes:LA 16
Description:COOK ROAD IMP: LA 16 TO JUBAN CROSSING
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$14,738,459.17
| Rank | License | Bidder | Construction Bid |
| 1 | 14807 | Richard Price Contracting Co, Llc | $16,508,272.27 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $17,493,395.79 |
| 3 | 55505 | MERRICK, LLC | $17,776,881.02 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $18,996,690.87 |
| 5 | 06276 | Barriere Construction Co., LLC | $19,461,578.17 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $20,340,110.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Richard Price Contracting Co, Llc | - 2 - KCR CONTRACTORS, LLC | - 3 - MERRICK, LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 19 | LUMP | 115,806.01 | 115,806.01 | 565,000.00 | 565,000.00 | 300,000.00 | 300,000.00 | 104,000.00 | 104,000.00 | | 0002 | 202-02-00010 | Removal of Billboard Sign & Base (3'OD Steel Mast in Reinforced Concrete Footing) | 1 | EACH | 2,978.17 | 2,978.17 | 10,900.00 | 10,900.00 | 2,000.00 | 2,000.00 | 20,500.00 | 20,500.00 | | 0003 | 202-02-00010 | Removal of Existing Sanitary Sewer Cleanout | 3 | EACH | 254.11 | 762.33 | 230.00 | 690.00 | 200.00 | 600.00 | 442.00 | 1,326.00 | | 0004 | 202-02-00030 | Removal of 12" Water Line | 410 | LNFT | 7.94 | 3,255.40 | 10.35 | 4,243.50 | 18.00 | 7,380.00 | 15.00 | 6,150.00 | | 0005 | 202-02-00030 | Removal of 4" Water Line (Asbestos Cement) | 2,875 | LNFT | 23.83 | 68,511.25 | 14.95 | 42,981.25 | 24.00 | 69,000.00 | 21.00 | 60,375.00 | | 0006 | 202-02-00030 | Removal of Sewer Line | 2,029 | LNFT | 14.89 | 30,211.81 | 18.40 | 37,333.60 | 35.00 | 71,015.00 | 10.00 | 20,290.00 | | 0007 | 202-02-02000 | Removal of Asphalt Drives | 208 | SQYD | 7.45 | 1,549.60 | 10.88 | 2,263.04 | 11.00 | 2,288.00 | 19.00 | 3,952.00 | | 0008 | 202-02-02020 | Removal of Asphalt Pavement | 6,021.5 | SQYD | 9.93 | 59,793.50 | 5.78 | 34,804.27 | 3.50 | 21,075.25 | 9.50 | 57,204.25 | | 0009 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS (8") | 5,353.4 | SQYD | 7.94 | 42,506.00 | 8.51 | 45,557.43 | 5.00 | 26,767.00 | 11.00 | 58,887.40 | | 0010 | 202-02-04501 | Removal of Bridge (Sta. 133+03 to 133+49) (Remaining Piles of 15' x 54' Timber Bridge) | 810 | LUMP | 5,784.64 | 5,784.64 | 4,600.00 | 4,600.00 | 5,000.00 | 5,000.00 | 5,200.00 | 5,200.00 | | 0011 | 202-02-05000 | Removal of Building - Parcel 1-1 (1,335 Total Sq. Ft.) | 1 | EACH | 5,956.35 | 5,956.35 | 15,525.00 | 15,525.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0012 | 202-02-05000 | Removal of Building - Parcel 1-1 (987 Total Sq. Ft.) | 1 | EACH | 5,956.35 | 5,956.35 | 11,500.00 | 11,500.00 | 15,000.00 | 15,000.00 | 8,000.00 | 8,000.00 | | 0013 | 202-02-05000 | Removal of Building - Parcel 2-3 (15,567 Total Sq. Ft.) | 1 | EACH | 23,825.41 | 23,825.41 | 18,400.00 | 18,400.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0014 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 1,804.78 | 14,438.24 | 575.00 | 4,600.00 | 1,300.00 | 10,400.00 | 950.00 | 7,600.00 | | 0015 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,096 | SQYD | 5.96 | 6,532.16 | 13.06 | 14,313.76 | 10.00 | 10,960.00 | 16.75 | 18,358.00 | | 0016 | 202-02-12000 | Removal of Fence | 1,339 | LNFT | 5.96 | 7,980.44 | 5.80 | 7,766.20 | 5.00 | 6,695.00 | 5.70 | 7,632.30 | | 0017 | 202-02-14000 | Removal of Gas Line | 1,477 | LNFT | 11.91 | 17,591.07 | 11.50 | 16,985.50 | 12.00 | 17,724.00 | 23.50 | 34,709.50 | | 0018 | 202-02-26000 | Removal of Manholes (Sewer) | 5 | EACH | 1,804.83 | 9,024.15 | 1,840.00 | 9,200.00 | 2,400.00 | 12,000.00 | 1,250.00 | 6,250.00 | | 0019 | 202-02-32100 | Removal of Pipe (Cross Drain) (According to Summary Table) | 301 | LNFT | 23.83 | 7,172.83 | 17.25 | 5,192.25 | 30.00 | 9,030.00 | 58.00 | 17,458.00 | | 0020 | 202-02-32120 | Removal of Pipe (Side Drain) (According to Summary Table) | 979 | LNFT | 14.89 | 14,577.31 | 14.90 | 14,587.10 | 25.00 | 24,475.00 | 21.00 | 20,559.00 | | 0021 | 202-02-32140 | Removal of Pipe (Storm Drain) (According to Summary Table) | 757 | LNFT | 11.91 | 9,015.87 | 16.10 | 12,187.70 | 25.00 | 18,925.00 | 20.00 | 15,140.00 | | 0022 | 202-02-32160 | Removal of Pipe (Yard Drain) (According to Summary Table) | 11 | LNFT | 54.15 | 595.65 | 23.00 | 253.00 | 25.00 | 275.00 | 48.00 | 528.00 | | 0023 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,374 | SQYD | 9.93 | 13,643.82 | 14.78 | 20,307.72 | 9.00 | 12,366.00 | 16.00 | 21,984.00 | | 0024 | 202-02-38240 | Removal of Signs and Supports | 10 | EACH | 28.92 | 289.20 | 28.75 | 287.50 | 125.00 | 1,250.00 | 190.00 | 1,900.00 | | 0025 | 203-01-00100 | General Excavation | 7,057 | CUYD | 9.51 | 67,112.07 | 7.91 | 55,820.87 | 12.00 | 84,684.00 | 14.75 | 104,090.75 | | 0026 | 203-02-00100 | Drainage Excavation | 6,338 | CUYD | 14.87 | 94,246.06 | 7.60 | 48,168.80 | 18.00 | 114,084.00 | 17.00 | 107,746.00 | | 0027 | 203-03-00100 | Embankment | 48,972 | CUYD | 21.02 | 1,029,391.44 | 22.08 | 1,081,301.76 | 17.00 | 832,524.00 | 24.00 | 1,175,328.00 | | 0028 | 203-11-00100 | Settlement Plate Installation and Monitoring | 4 | EACH | 1,735.39 | 6,941.56 | 2,300.00 | 9,200.00 | 3,000.00 | 12,000.00 | 3,010.00 | 12,040.00 | | 0029 | 204-02-00100 | Temporary Hay Bales | 847 | EACH | 27.32 | 23,140.04 | 22.00 | 18,634.00 | 15.00 | 12,705.00 | 26.00 | 22,022.00 | | 0030 | 204-06-00100 | Temporary Silt Fencing | 17,121 | LNFT | 3.16 | 54,102.36 | 2.04 | 34,926.84 | 1.70 | 29,105.70 | 2.50 | 42,802.50 | | 0031 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 35,198.8 | SQYD | 14.94 | 525,870.07 | 18.43 | 648,713.88 | 17.75 | 624,778.70 | 18.00 | 633,578.40 | | 0032 | 302-02-12030 | Class II Base Course (12" Thick) (Asphalt Concrete Base on Embankment Layer) | 6,390.5 | SQYD | 44.78 | 286,166.59 | 48.05 | 307,063.53 | 45.75 | 292,365.38 | 53.00 | 338,696.50 | | 0033 | 304-01-00100 | Lime | 709.41 | TON | 251.93 | 178,721.66 | 46.57 | 33,037.22 | 225.00 | 159,617.25 | 350.00 | 248,293.50 | | 0034 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 50,136 | SQYD | 2.48 | 124,337.28 | 0.60 | 30,081.60 | 1.15 | 57,656.40 | 3.75 | 188,010.00 | | 0035 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 1,048 | SQYD | 55.87 | 58,551.76 | 44.50 | 46,636.00 | 60.00 | 62,880.00 | 55.00 | 57,640.00 | | 0036 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 812.3 | CUYD | 89.48 | 72,684.60 | 111.00 | 90,165.30 | 88.00 | 71,482.40 | 66.00 | 53,611.80 | | 0037 | 502-01-00100 | Asphalt Concrete | 13,397.3 | TON | 113.23 | 1,516,976.28 | 105.21 | 1,409,529.93 | 105.00 | 1,406,716.50 | 102.00 | 1,366,524.60 | | 0038 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 145.2 | TON | 113.23 | 16,441.00 | 105.20 | 15,275.04 | 110.00 | 15,972.00 | 175.00 | 25,410.00 | | 0039 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 23,935 | GAL | 3.20 | 76,592.00 | 3.05 | 73,001.75 | 3.30 | 78,985.50 | 3.00 | 71,805.00 | | 0040 | 507-02-00200 | Aggregate (S2) | 35,199 | SQYD | 2.37 | 83,421.63 | 2.26 | 79,549.74 | 2.35 | 82,717.65 | 2.16 | 76,029.84 | | 0041 | 507-02-00300 | Aggregate (S3) | 35,199 | SQYD | 2.09 | 73,565.91 | 1.99 | 70,046.01 | 2.10 | 73,917.90 | 1.92 | 67,582.08 | | 0042 | 509-01-00100 | Milling Asphalt Pavement | 3,124.8 | SQYD | 7.07 | 22,092.34 | 6.72 | 20,998.66 | 7.00 | 21,873.60 | 5.00 | 15,624.00 | | 0043 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -130.5 | CUYD | 0.01 | -1.31 | 0.01 | -1.31 | 0.01 | -1.31 | 1.00 | -130.50 | | 0044 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 3,512 | LNFT | 51.74 | 181,710.88 | 75.77 | 266,104.24 | 80.00 | 280,960.00 | 70.00 | 245,840.00 | | 0045 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,653 | LNFT | 52.70 | 139,813.10 | 80.55 | 213,699.15 | 85.00 | 225,505.00 | 77.00 | 204,281.00 | | 0046 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,588 | LNFT | 68.10 | 176,242.80 | 106.51 | 275,647.88 | 110.00 | 284,680.00 | 108.00 | 279,504.00 | | 0047 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 2,515 | LNFT | 89.11 | 224,111.65 | 133.30 | 335,249.50 | 145.00 | 364,675.00 | 175.00 | 440,125.00 | | 0048 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,762 | LNFT | 113.49 | 199,969.38 | 161.09 | 283,840.58 | 170.00 | 299,540.00 | 188.00 | 331,256.00 | | 0049 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 1,184 | LNFT | 148.65 | 176,001.60 | 190.79 | 225,895.36 | 195.00 | 230,880.00 | 224.00 | 265,216.00 | | 0050 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 388 | LNFT | 183.03 | 71,015.64 | 232.27 | 90,120.76 | 240.00 | 93,120.00 | 240.00 | 93,120.00 | | 0051 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 236 | LNFT | 107.24 | 25,308.64 | 121.94 | 28,777.84 | 140.00 | 33,040.00 | 230.00 | 54,280.00 | | 0052 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 215 | LNFT | 130.81 | 28,124.15 | 159.77 | 34,350.55 | 165.00 | 35,475.00 | 271.00 | 58,265.00 | | 0053 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 101 | LNFT | 247.20 | 24,967.20 | 282.18 | 28,500.18 | 270.00 | 27,270.00 | 350.00 | 35,350.00 | | 0054 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,162 | LNFT | 1.14 | 10,444.68 | 5.75 | 52,681.50 | 2.00 | 18,324.00 | 1.20 | 10,994.40 | | 0055 | 702-02-00100 | Manholes (MH-06) | 19 | EACH | 5,500.00 | 104,500.00 | 6,519.28 | 123,866.32 | 5,000.00 | 95,000.00 | 8,100.00 | 153,900.00 | | 0056 | 702-02-00100 | Manholes (MH-06) (Conflict Box) | 5 | EACH | 7,000.00 | 35,000.00 | 9,382.16 | 46,910.80 | 10,000.00 | 50,000.00 | 11,200.00 | 56,000.00 | | 0057 | 702-02-00100 | Manholes (MH-06) (Sewer) | 9 | EACH | 5,875.00 | 52,875.00 | 5,943.20 | 53,488.80 | 5,500.00 | 49,500.00 | 9,400.00 | 84,600.00 | | 0058 | 702-03-00100 | Catch Basins (CB-01) | 55 | EACH | 5,600.00 | 308,000.00 | 5,525.38 | 303,895.90 | 4,000.00 | 220,000.00 | 7,000.00 | 385,000.00 | | 0059 | 702-03-00200 | Catch Basins (CB-02) | 7 | EACH | 6,775.00 | 47,425.00 | 7,037.70 | 49,263.90 | 6,800.00 | 47,600.00 | 9,500.00 | 66,500.00 | | 0060 | 702-03-00500 | Catch Basins (CB-06) | 22 | EACH | 6,800.00 | 149,600.00 | 6,481.36 | 142,589.92 | 8,000.00 | 176,000.00 | 7,400.00 | 162,800.00 | | 0061 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 10,400.00 | 104,000.00 | 10,971.20 | 109,712.00 | 13,000.00 | 130,000.00 | 13,600.00 | 136,000.00 | | 0062 | 702-03-00800 | Catch Basins (CB-09) | 6 | EACH | 5,500.00 | 33,000.00 | 6,613.03 | 39,678.18 | 8,000.00 | 48,000.00 | 10,500.00 | 63,000.00 | | 0063 | 702-03-01000 | Catch Basins (CB-2TOP02) | 12 | EACH | 8,075.00 | 96,900.00 | 8,690.55 | 104,286.60 | 13,000.00 | 156,000.00 | 13,000.00 | 156,000.00 | | 0064 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 1,016.44 | 5,082.20 | 2,415.00 | 12,075.00 | 600.00 | 3,000.00 | 1,500.00 | 7,500.00 | | 0065 | 702-04-00100 | Adjusting Manholes (Sanitary Sewer Wetwell) | 1 | EACH | 5,784.64 | 5,784.64 | 5,175.00 | 5,175.00 | 4,000.00 | 4,000.00 | 5,200.00 | 5,200.00 | | 0066 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 9,060.94 | 9,060.94 | 3,220.00 | 3,220.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | | 0067 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 195 | LNFT | 41.07 | 8,008.65 | 38.16 | 7,441.20 | 26.00 | 5,070.00 | 37.50 | 7,312.50 | | 0068 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 133.05 | 13,305.00 | 123.63 | 12,363.00 | 58.00 | 5,800.00 | 121.00 | 12,100.00 | | 0069 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,164.95 | 8,329.90 | 3,870.00 | 7,740.00 | 3,000.00 | 6,000.00 | 3,800.00 | 7,600.00 | | 0070 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 2 | EACH | 13,825.29 | 27,650.58 | 12,846.25 | 25,692.50 | 15,000.00 | 30,000.00 | 12,600.00 | 25,200.00 | | 0071 | 705-01-00100 | Barbed Wire Fence (4' Cattle) | 904 | LNFT | 13.88 | 12,547.52 | 12.90 | 11,661.60 | 13.00 | 11,752.00 | 15.80 | 14,283.20 | | 0072 | 705-05-00100 | Double Swinging Driveway Gates | 2 | DBGT | 1,735.39 | 3,470.78 | 1,612.50 | 3,225.00 | 1,800.00 | 3,600.00 | 1,500.00 | 3,000.00 | | 0073 | 705-06-00500 | Chain Link Fence (8 Foot Height) | 34 | LNFT | 69.42 | 2,360.28 | 53.75 | 1,827.50 | 55.00 | 1,870.00 | 112.00 | 3,808.00 | | 0074 | 705-08-05080 | 12-Foot Double Gates for Chain Link Fence (8-Foot Height) | 1 | DBGT | 4,627.71 | 4,627.71 | 1,988.75 | 1,988.75 | 3,000.00 | 3,000.00 | 3,600.00 | 3,600.00 | | 0075 | 706-01-00100 | Concrete Walk (4" Thick) | 9,786.4 | SQYD | 56.70 | 554,888.88 | 49.23 | 481,784.47 | 52.00 | 508,892.80 | 55.00 | 538,252.00 | | 0076 | 706-01-00300 | Concrete Walk (6" Thick) | 39.6 | SQYD | 84.20 | 3,334.32 | 74.75 | 2,960.10 | 72.00 | 2,851.20 | 150.00 | 5,940.00 | | 0077 | 706-02-00200 | Concrete Drive (6" Thick) | 3,118.4 | SQYD | 111.89 | 348,917.78 | 62.30 | 194,276.32 | 72.00 | 224,524.80 | 100.00 | 311,840.00 | | 0078 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 10.4 | SQYD | 89.86 | 934.54 | 92.00 | 956.80 | 265.00 | 2,756.00 | 200.00 | 2,080.00 | | 0079 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Red) (11" Thick) | 652 | SQYD | 199.58 | 130,126.16 | 149.92 | 97,747.84 | 140.00 | 91,280.00 | 180.00 | 117,360.00 | | 0080 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Red) (9" Thick) | 1,356.2 | SQYD | 166.84 | 226,268.41 | 122.95 | 166,744.79 | 125.00 | 169,525.00 | 150.00 | 203,430.00 | | 0081 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 3,646.86 | 14,587.44 | 1,437.50 | 5,750.00 | 1,500.00 | 6,000.00 | 2,200.00 | 8,800.00 | | 0082 | 707-01-00100 | Concrete Curb | 3,157 | LNFT | 27.77 | 87,669.89 | 17.25 | 54,458.25 | 25.00 | 78,925.00 | 14.75 | 46,565.75 | | 0083 | 707-03-00100 | Combination Concrete Curb and Gutter | 28,214.2 | LNFT | 31.66 | 893,261.57 | 19.50 | 550,176.90 | 29.00 | 818,211.80 | 33.00 | 931,068.60 | | 0084 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 3,872 | SQYD | 92.55 | 358,353.60 | 86.00 | 332,992.00 | 60.00 | 232,320.00 | 80.00 | 309,760.00 | | 0085 | 711-04-00100 | Geotextile Fabric | 3,872 | SQYD | 2.31 | 8,944.32 | 5.38 | 20,831.36 | 3.00 | 11,616.00 | 5.30 | 20,521.60 | | 0086 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,630.44 | 28,630.44 | 170,025.78 | 170,025.78 | 200,000.00 | 200,000.00 | 115,000.00 | 115,000.00 | | 0087 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 600 | LNFT | 1.16 | 696.00 | 1.08 | 648.00 | 0.55 | 330.00 | 1.05 | 630.00 | | 0088 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.18 | MILE | 2,024.62 | 8,462.91 | 1,881.25 | 7,863.63 | 235.00 | 982.30 | 1,850.00 | 7,733.00 | | 0089 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 20 | EACH | 57.85 | 1,157.00 | 53.75 | 1,075.00 | 11.00 | 220.00 | 55.00 | 1,100.00 | | 0090 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 20 | EACH | 57.85 | 1,157.00 | 53.75 | 1,075.00 | 11.00 | 220.00 | 55.00 | 1,100.00 | | 0091 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 20 | EACH | 57.85 | 1,157.00 | 53.75 | 1,075.00 | 11.00 | 220.00 | 55.00 | 1,100.00 | | 0092 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 11,569.28 | 46,277.12 | 21,500.00 | 86,000.00 | 22,000.00 | 88,000.00 | 27,000.00 | 108,000.00 | | 0093 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 29,154.59 | 29,154.59 | 29,025.00 | 29,025.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0094 | 726-01-00100 | Bedding Material | 2,820 | CUYD | 64.51 | 181,918.20 | 86.25 | 243,225.00 | 88.00 | 248,160.00 | 55.00 | 155,100.00 | | 0095 | 727-01-00100 | Mobilization | 1 | LUMP | 1,010,000.00 | 1,010,000.00 | 1,092,500.00 | 1,092,500.00 | 1,700,000.00 | 1,700,000.00 | 1,000,000.00 | 1,000,000.00 | | 0096 | 728-01-00400 | Jacked or Bored Pipe (8") (6" I.D.) (Sewer Service Line) | 120 | LNFT | 85.79 | 10,294.80 | 131.93 | 15,831.60 | 115.00 | 13,800.00 | 108.00 | 12,960.00 | | 0097 | 728-01-00650 | Jacked or Bored Pipe (14") (12" I.D.) | 113 | LNFT | 182.33 | 20,603.29 | 200.94 | 22,706.22 | 210.00 | 23,730.00 | 422.00 | 47,686.00 | | 0098 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 152.2 | SQFT | 46.28 | 7,043.82 | 43.00 | 6,544.60 | 24.00 | 3,652.80 | 42.00 | 6,392.40 | | 0099 | 729-01-00103 | Sign (Type A)(Relocate) | 29.3 | SQFT | 49.75 | 1,457.68 | 46.23 | 1,354.54 | 11.00 | 322.30 | 44.00 | 1,289.20 | | 0100 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 184.1 | SQFT | 64.79 | 11,927.84 | 60.20 | 11,082.82 | 24.00 | 4,418.40 | 58.00 | 10,677.80 | | 0101 | 729-02-00103 | Sign (Type B)(Relocate) | 8.5 | SQFT | 52.06 | 442.51 | 48.38 | 411.23 | 11.00 | 93.50 | 47.00 | 399.50 | | 0102 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 115.69 | 462.76 | 107.50 | 430.00 | 115.00 | 460.00 | 106.00 | 424.00 | | 0103 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 45 | EACH | 225.60 | 10,152.00 | 209.63 | 9,433.35 | 170.00 | 7,650.00 | 205.00 | 9,225.00 | | 0104 | 731-02-00100 | Reflectorized Raised Pavement Markers | 698 | EACH | 11.57 | 8,075.86 | 10.75 | 7,503.50 | 16.00 | 11,168.00 | 10.75 | 7,503.50 | | 0105 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 168 | LNFT | 28.92 | 4,858.56 | 26.88 | 4,515.84 | 16.00 | 2,688.00 | 26.50 | 4,452.00 | | 0106 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.419 | MILE | 6,354.18 | 40,787.48 | 5,912.50 | 37,952.34 | 8,500.00 | 54,561.50 | 5,800.00 | 37,230.20 | | 0107 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.461 | MILE | 14,430.24 | 6,652.34 | 13,437.50 | 6,194.69 | 17,000.00 | 7,837.00 | 13,200.00 | 6,085.20 | | 0108 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.82 | MILE | 2,024.62 | 5,709.43 | 1,881.25 | 5,305.13 | 4,500.00 | 12,690.00 | 1,850.00 | 5,217.00 | | 0109 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.209 | MILE | 6,974.78 | 1,457.73 | 6,480.86 | 1,354.50 | 10,000.00 | 2,090.00 | 6,300.00 | 1,316.70 | | 0110 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.035 | MILE | 49,582.57 | 1,735.39 | 53,750.00 | 1,881.25 | 49,000.00 | 1,715.00 | 45,000.00 | 1,575.00 | | 0111 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 578.46 | 1,735.38 | 537.50 | 1,612.50 | 800.00 | 2,400.00 | 530.00 | 1,590.00 | | 0112 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 462.77 | 2,313.85 | 430.00 | 2,150.00 | 465.00 | 2,325.00 | 422.00 | 2,110.00 | | 0113 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 462.77 | 2,313.85 | 430.00 | 2,150.00 | 465.00 | 2,325.00 | 422.00 | 2,110.00 | | 0114 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 4 | EACH | 1,156.93 | 4,627.72 | 1,075.00 | 4,300.00 | 1,700.00 | 6,800.00 | 1,050.00 | 4,200.00 | | 0115 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 1 | EACH | 1,156.93 | 1,156.93 | 1,075.00 | 1,075.00 | 1,700.00 | 1,700.00 | 1,050.00 | 1,050.00 | | 0116 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 462.77 | 925.54 | 430.00 | 860.00 | 550.00 | 1,100.00 | 430.00 | 860.00 | | 0117 | 732-05-00100 | Removal of Existing Markings | 0.162 | MILE | 57,132.22 | 9,255.42 | 53,750.00 | 8,707.50 | 33,000.00 | 5,346.00 | 52,000.00 | 8,424.00 | | 0118 | 735-01-00100 | Mailboxes | 15 | EACH | 23.14 | 347.10 | 21.50 | 322.50 | 100.00 | 1,500.00 | 21.00 | 315.00 | | 0119 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 289.23 | 3,181.53 | 268.75 | 2,956.25 | 295.00 | 3,245.00 | 263.00 | 2,893.00 | | 0120 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 404.93 | 809.86 | 376.25 | 752.50 | 590.00 | 1,180.00 | 370.00 | 740.00 | | 0121 | 739-01-00100 | Hydro-Seeding | 12.53 | ACRE | 3,470.78 | 43,488.87 | 2,687.50 | 33,674.38 | 2,800.00 | 35,084.00 | 1,650.00 | 20,674.50 | | 0122 | 740-01-00100 | Construction Layout | 1 | LUMP | 163,535.17 | 163,535.17 | 132,000.00 | 132,000.00 | 120,000.00 | 120,000.00 | 230,000.00 | 230,000.00 | | 0123 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 11,735.56 | 11,735.56 | 55,000.00 | 55,000.00 | 100,000.00 | 100,000.00 | 164,000.00 | 164,000.00 | | 0124 | 741-01-01100 | Water Main (8" PVC) | 3,100 | LNFT | 65.64 | 203,484.00 | 44.87 | 139,097.00 | 82.00 | 254,200.00 | 87.00 | 269,700.00 | | 0125 | 741-01-01140 | Water Main (12" PVC) | 643 | LNFT | 176.48 | 113,476.64 | 93.79 | 60,306.97 | 165.00 | 106,095.00 | 150.00 | 96,450.00 | | 0126 | 741-02-00400 | Gate Valve (8") | 9 | EACH | 3,252.82 | 29,275.38 | 2,585.97 | 23,273.73 | 1,900.00 | 17,100.00 | 3,100.00 | 27,900.00 | | 0127 | 741-03-00600 | Tapping Sleeve and Valve Assembly (12") (Water Line Hot Tap) | 2 | EACH | 8,009.88 | 16,019.76 | 8,981.63 | 17,963.26 | 10,000.00 | 20,000.00 | 6,900.00 | 13,800.00 | | 0128 | 741-04-00100 | Fire Hydrant (Fire Hydrant Assembly) | 4 | EACH | 10,082.63 | 40,330.52 | 6,509.13 | 26,036.52 | 7,000.00 | 28,000.00 | 7,900.00 | 31,600.00 | | 0129 | 741-05-01040 | Water Service Line (1" PVC) | 1,321 | LNFT | 12.85 | 16,974.85 | 10.83 | 14,306.43 | 14.20 | 18,758.20 | 35.80 | 47,291.80 | | 0130 | 741-08-00100 | Relocating Water Meter | 24 | EACH | 63.63 | 1,527.12 | 210.52 | 5,052.48 | 620.00 | 14,880.00 | 800.00 | 19,200.00 | | 0131 | 741-09-00100 | Adjusting Water House Connections | 24 | EACH | 63.63 | 1,527.12 | 282.19 | 6,772.56 | 115.00 | 2,760.00 | 158.00 | 3,792.00 | | 0132 | 742-01-00400 | Sanitary Sewer Pipe (8") | 1,119 | LNFT | 92.55 | 103,563.45 | 56.02 | 62,686.38 | 100.00 | 111,900.00 | 144.00 | 161,136.00 | | 0133 | 742-01-00500 | Sanitary Sewer Pipe (10") | 331 | LNFT | 104.12 | 34,463.72 | 65.78 | 21,773.18 | 140.00 | 46,340.00 | 216.00 | 71,496.00 | | 0134 | 742-01-00600 | Sanitary Sewer Pipe (12") | 940 | LNFT | 113.38 | 106,577.20 | 77.55 | 72,897.00 | 185.00 | 173,900.00 | 217.00 | 203,980.00 | | 0135 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 17 | EACH | 578.46 | 9,833.82 | 682.94 | 11,609.98 | 260.00 | 4,420.00 | 630.00 | 10,710.00 | | 0136 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 1,022 | LNFT | 57.85 | 59,122.70 | 27.19 | 27,788.18 | 70.00 | 71,540.00 | 89.00 | 90,958.00 | | 0137 | 804-01-00300 | Precast Concrete Piles (16") | 8,000 | LNFT | 98.34 | 786,720.00 | 105.35 | 842,800.00 | 95.00 | 760,000.00 | 152.00 | 1,216,000.00 | | 0138 | 804-10-00300 | Precast Concrete Indicator Piles (16") | 2 | EACH | 25,452.42 | 50,904.84 | 53,750.00 | 107,500.00 | 12,000.00 | 24,000.00 | 45,000.00 | 90,000.00 | | 0139 | 804-14-00100 | Dynamic Monitoring Assistance | 14 | EACH | 4,859.10 | 68,027.40 | 1,612.50 | 22,575.00 | 2,000.00 | 28,000.00 | 3,800.00 | 53,200.00 | | 0140 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 20,824.70 | 20,824.70 | 12,900.00 | 12,900.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 | | 0141 | 804-18-00100 | Vibration Monitoring | 40 | DAY | 925.54 | 37,021.60 | 1,612.50 | 64,500.00 | 1,000.00 | 40,000.00 | 950.00 | 38,000.00 | | 0142 | 805-12-00900 | Bridge Superstructure and Substructure (26' Clear Roadway, 7' Sidewalk, 45 Degree Crossing) | 9,360 | SQFT | 156.19 | 1,461,938.40 | 209.63 | 1,962,136.80 | 158.00 | 1,478,880.00 | 95.00 | 889,200.00 | | 0143 | 805-15-01800 | Reinforced Concrete Box Culverts (Precast) (8' x 7') | 744 | LNFT | 746.60 | 555,470.40 | 1,079.40 | 803,073.60 | 955.00 | 710,520.00 | 1,250.00 | 930,000.00 | | 0144 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Headwall for 8' x 7' Precast Box Culvert) | 2 | EACH | 43,733.36 | 87,466.72 | 38,035.65 | 76,071.30 | 60,000.00 | 120,000.00 | 62,000.00 | 124,000.00 | | 0145 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,178 | SQFT | 2.31 | 9,651.18 | 3.23 | 13,494.94 | 2.00 | 8,356.00 | 7.50 | 31,335.00 | | 0146 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,178 | SQFT | 2.31 | 9,651.18 | 3.23 | 13,494.94 | 2.00 | 8,356.00 | 7.50 | 31,335.00 | | 0147 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 342.68 | 123,364.80 | 215.00 | 77,400.00 | 150.00 | 54,000.00 | 300.00 | 108,000.00 | | 0148 | 810-03-00100 | Concrete and Metal Bridge Railing | 360 | LNFT | 289.23 | 104,122.80 | 403.13 | 145,126.80 | 365.00 | 131,400.00 | 350.00 | 126,000.00 | | 0149 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (26' Clear Roadway, 45 degree crossing, without Asphalt) | 4,320 | SQFT | 109.91 | 474,811.20 | 102.13 | 441,201.60 | 80.00 | 345,600.00 | 110.00 | 475,200.00 | | 0150 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) (For Future Lighting) | 8,052 | LNFT | 31.87 | 256,617.24 | 30.15 | 242,767.80 | 30.00 | 241,560.00 | 36.50 | 293,898.00 | | 0151 | NS-300-00060 | Geogrid (Box Culvert) | 1,736 | SQYD | 3.35 | 5,815.60 | 2.30 | 3,992.80 | 5.00 | 8,680.00 | 5.00 | 8,680.00 | | 0152 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 7,161 | INLF | 0.87 | 6,230.07 | 1.15 | 8,235.15 | 1.50 | 10,741.50 | 1.10 | 7,877.10 | | 0153 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,810 | INLF | 0.98 | 1,773.80 | 1.15 | 2,081.50 | 3.50 | 6,335.00 | 1.50 | 2,715.00 | | 0154 | NS-702-00100 | Paved Gutter Drain (Double) | 14 | EACH | 8,236.61 | 115,312.54 | 5,010.71 | 70,149.94 | 7,300.00 | 102,200.00 | 12,000.00 | 168,000.00 | | 0155 | NS-702-00100 | Paved Gutter Drain (Single) | 33 | EACH | 2,167.53 | 71,528.49 | 3,860.71 | 127,403.43 | 4,800.00 | 158,400.00 | 6,000.00 | 198,000.00 | | 0156 | TS-821-00310 | Sewer Lift Station Adjustments (Relocate Electrical Controls) | 1 | LUMP | 40,000.00 | 40,000.00 | 46,574.38 | 46,574.38 | 30,000.00 | 30,000.00 | 23,500.00 | 23,500.00 | | 0157 | TS-MSC-00400 | Gas Line (4") | 1,488 | LF | 33.55 | 49,922.40 | 34.40 | 51,187.20 | 34.00 | 50,592.00 | 31.00 | 46,128.00 | | 0158 | TS-MSC-00410 | Gas Line tapping sleeve and valve (4") | 2 | EACH | 7,235.43 | 14,470.86 | 9,675.00 | 19,350.00 | 4,500.00 | 9,000.00 | 5,790.00 | 11,580.00 | | 0159 | TS-MSC-00420 | Gas Pipeline Steel Casing (10") | 113 | LF | 347.08 | 39,220.04 | 461.77 | 52,180.01 | 230.00 | 25,990.00 | 142.00 | 16,046.00 | | 0160 | TS-MSC-00430 | Gas Service Line (3/4" Diameter) | 6 | LF | 33.55 | 201.30 | 32.25 | 193.50 | 115.00 | 690.00 | 24.00 | 144.00 | | 0161 | TS-MSC-00440 | Gas Service Line Tap, Riser and Valve Tee | 1 | EACH | 462.77 | 462.77 | 4,515.00 | 4,515.00 | 590.00 | 590.00 | 695.00 | 695.00 | | 0162 | TS-MSC-00450 | Gas Pipeline Marker | 2 | EACH | 115.70 | 231.40 | 537.50 | 1,075.00 | 115.00 | 230.00 | 260.00 | 520.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 16,508,272.27 | | 17,493,395.79 | | 17,776,881.02 | | 18,996,690.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barriere Construction Co., LLC | - 6 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 19 | LUMP | 160,000.00 | 160,000.00 | 2,500,000.00 | 2,500,000.00 | | 0002 | 202-02-00010 | Removal of Billboard Sign & Base (3'OD Steel Mast in Reinforced Concrete Footing) | 1 | EACH | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-00010 | Removal of Existing Sanitary Sewer Cleanout | 3 | EACH | 100.00 | 300.00 | 150.00 | 450.00 | | 0004 | 202-02-00030 | Removal of 12" Water Line | 410 | LNFT | 20.00 | 8,200.00 | 15.00 | 6,150.00 | | 0005 | 202-02-00030 | Removal of 4" Water Line (Asbestos Cement) | 2,875 | LNFT | 20.00 | 57,500.00 | 20.00 | 57,500.00 | | 0006 | 202-02-00030 | Removal of Sewer Line | 2,029 | LNFT | 25.00 | 50,725.00 | 30.00 | 60,870.00 | | 0007 | 202-02-02000 | Removal of Asphalt Drives | 208 | SQYD | 5.00 | 1,040.00 | 5.50 | 1,144.00 | | 0008 | 202-02-02020 | Removal of Asphalt Pavement | 6,021.5 | SQYD | 5.00 | 30,107.50 | 4.50 | 27,096.75 | | 0009 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS (8") | 5,353.4 | SQYD | 5.00 | 26,767.00 | 5.50 | 29,443.70 | | 0010 | 202-02-04501 | Removal of Bridge (Sta. 133+03 to 133+49) (Remaining Piles of 15' x 54' Timber Bridge) | 810 | LUMP | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0011 | 202-02-05000 | Removal of Building - Parcel 1-1 (1,335 Total Sq. Ft.) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0012 | 202-02-05000 | Removal of Building - Parcel 1-1 (987 Total Sq. Ft.) | 1 | EACH | 9,000.00 | 9,000.00 | 20,000.00 | 20,000.00 | | 0013 | 202-02-05000 | Removal of Building - Parcel 2-3 (15,567 Total Sq. Ft.) | 1 | EACH | 55,000.00 | 55,000.00 | 100,000.00 | 100,000.00 | | 0014 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 200.00 | 1,600.00 | 1,000.00 | 8,000.00 | | 0015 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,096 | SQYD | 15.00 | 16,440.00 | 10.00 | 10,960.00 | | 0016 | 202-02-12000 | Removal of Fence | 1,339 | LNFT | 8.00 | 10,712.00 | 6.00 | 8,034.00 | | 0017 | 202-02-14000 | Removal of Gas Line | 1,477 | LNFT | 20.00 | 29,540.00 | 10.00 | 14,770.00 | | 0018 | 202-02-26000 | Removal of Manholes (Sewer) | 5 | EACH | 400.00 | 2,000.00 | 2,000.00 | 10,000.00 | | 0019 | 202-02-32100 | Removal of Pipe (Cross Drain) (According to Summary Table) | 301 | LNFT | 20.00 | 6,020.00 | 20.50 | 6,170.50 | | 0020 | 202-02-32120 | Removal of Pipe (Side Drain) (According to Summary Table) | 979 | LNFT | 20.00 | 19,580.00 | 19.50 | 19,090.50 | | 0021 | 202-02-32140 | Removal of Pipe (Storm Drain) (According to Summary Table) | 757 | LNFT | 20.00 | 15,140.00 | 19.50 | 14,761.50 | | 0022 | 202-02-32160 | Removal of Pipe (Yard Drain) (According to Summary Table) | 11 | LNFT | 10.00 | 110.00 | 12.00 | 132.00 | | 0023 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,374 | SQYD | 15.00 | 20,610.00 | 12.00 | 16,488.00 | | 0024 | 202-02-38240 | Removal of Signs and Supports | 10 | EACH | 30.00 | 300.00 | 25.00 | 250.00 | | 0025 | 203-01-00100 | General Excavation | 7,057 | CUYD | 16.00 | 112,912.00 | 14.00 | 98,798.00 | | 0026 | 203-02-00100 | Drainage Excavation | 6,338 | CUYD | 22.00 | 139,436.00 | 15.00 | 95,070.00 | | 0027 | 203-03-00100 | Embankment | 48,972 | CUYD | 25.00 | 1,224,300.00 | 30.00 | 1,469,160.00 | | 0028 | 203-11-00100 | Settlement Plate Installation and Monitoring | 4 | EACH | 2,500.00 | 10,000.00 | 5,000.00 | 20,000.00 | | 0029 | 204-02-00100 | Temporary Hay Bales | 847 | EACH | 20.00 | 16,940.00 | 20.00 | 16,940.00 | | 0030 | 204-06-00100 | Temporary Silt Fencing | 17,121 | LNFT | 3.00 | 51,363.00 | 2.50 | 42,802.50 | | 0031 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 35,198.8 | SQYD | 22.00 | 774,373.60 | 20.00 | 703,976.00 | | 0032 | 302-02-12030 | Class II Base Course (12" Thick) (Asphalt Concrete Base on Embankment Layer) | 6,390.5 | SQYD | 65.00 | 415,382.50 | 42.00 | 268,401.00 | | 0033 | 304-01-00100 | Lime | 709.41 | TON | 30.00 | 21,282.30 | 250.00 | 177,352.50 | | 0034 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 50,136 | SQYD | 0.10 | 5,013.60 | 1.50 | 75,204.00 | | 0035 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 1,048 | SQYD | 40.00 | 41,920.00 | 45.00 | 47,160.00 | | 0036 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 812.3 | CUYD | 1.00 | 812.30 | 100.00 | 81,230.00 | | 0037 | 502-01-00100 | Asphalt Concrete | 13,397.3 | TON | 110.00 | 1,473,703.00 | 98.00 | 1,312,935.40 | | 0038 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 145.2 | TON | 230.00 | 33,396.00 | 98.00 | 14,229.60 | | 0039 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 23,935 | GAL | 3.00 | 71,805.00 | 2.80 | 67,018.00 | | 0040 | 507-02-00200 | Aggregate (S2) | 35,199 | SQYD | 2.25 | 79,197.75 | 2.05 | 72,157.95 | | 0041 | 507-02-00300 | Aggregate (S3) | 35,199 | SQYD | 2.20 | 77,437.80 | 1.80 | 63,358.20 | | 0042 | 509-01-00100 | Milling Asphalt Pavement | 3,124.8 | SQYD | 4.50 | 14,061.60 | 6.00 | 18,748.80 | | 0043 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -130.5 | CUYD | 1.00 | -130.50 | 1.00 | -130.50 | | 0044 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 3,512 | LNFT | 65.00 | 228,280.00 | 52.00 | 182,624.00 | | 0045 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,653 | LNFT | 75.00 | 198,975.00 | 63.00 | 167,139.00 | | 0046 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,588 | LNFT | 100.00 | 258,800.00 | 88.00 | 227,744.00 | | 0047 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 2,515 | LNFT | 160.00 | 402,400.00 | 107.00 | 269,105.00 | | 0048 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,762 | LNFT | 200.00 | 352,400.00 | 126.00 | 222,012.00 | | 0049 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 1,184 | LNFT | 250.00 | 296,000.00 | 154.00 | 182,336.00 | | 0050 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 388 | LNFT | 270.00 | 104,760.00 | 187.00 | 72,556.00 | | 0051 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 236 | LNFT | 160.00 | 37,760.00 | 146.00 | 34,456.00 | | 0052 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 215 | LNFT | 200.00 | 43,000.00 | 174.00 | 37,410.00 | | 0053 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 101 | LNFT | 420.00 | 42,420.00 | 281.00 | 28,381.00 | | 0054 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,162 | LNFT | 0.01 | 91.62 | 5.00 | 45,810.00 | | 0055 | 702-02-00100 | Manholes (MH-06) | 19 | EACH | 9,000.00 | 171,000.00 | 5,500.00 | 104,500.00 | | 0056 | 702-02-00100 | Manholes (MH-06) (Conflict Box) | 5 | EACH | 10,000.00 | 50,000.00 | 6,700.00 | 33,500.00 | | 0057 | 702-02-00100 | Manholes (MH-06) (Sewer) | 9 | EACH | 9,000.00 | 81,000.00 | 4,500.00 | 40,500.00 | | 0058 | 702-03-00100 | Catch Basins (CB-01) | 55 | EACH | 5,000.00 | 275,000.00 | 4,800.00 | 264,000.00 | | 0059 | 702-03-00200 | Catch Basins (CB-02) | 7 | EACH | 8,000.00 | 56,000.00 | 7,200.00 | 50,400.00 | | 0060 | 702-03-00500 | Catch Basins (CB-06) | 22 | EACH | 9,500.00 | 209,000.00 | 8,000.00 | 176,000.00 | | 0061 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 18,500.00 | 185,000.00 | 13,300.00 | 133,000.00 | | 0062 | 702-03-00800 | Catch Basins (CB-09) | 6 | EACH | 11,000.00 | 66,000.00 | 8,300.00 | 49,800.00 | | 0063 | 702-03-01000 | Catch Basins (CB-2TOP02) | 12 | EACH | 9,500.00 | 114,000.00 | 12,900.00 | 154,800.00 | | 0064 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 3,000.00 | 15,000.00 | 3,100.00 | 15,500.00 | | 0065 | 702-04-00100 | Adjusting Manholes (Sanitary Sewer Wetwell) | 1 | EACH | 20,000.00 | 20,000.00 | 3,500.00 | 3,500.00 | | 0066 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 2,500.00 | 2,500.00 | 3,900.00 | 3,900.00 | | 0067 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 195 | LNFT | 37.00 | 7,215.00 | 35.50 | 6,922.50 | | 0068 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 120.00 | 12,000.00 | 115.00 | 11,500.00 | | 0069 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,000.00 | 8,000.00 | 3,600.00 | 7,200.00 | | 0070 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 2 | EACH | 13,000.00 | 26,000.00 | 12,000.00 | 24,000.00 | | 0071 | 705-01-00100 | Barbed Wire Fence (4' Cattle) | 904 | LNFT | 15.00 | 13,560.00 | 12.00 | 10,848.00 | | 0072 | 705-05-00100 | Double Swinging Driveway Gates | 2 | DBGT | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | | 0073 | 705-06-00500 | Chain Link Fence (8 Foot Height) | 34 | LNFT | 50.00 | 1,700.00 | 50.00 | 1,700.00 | | 0074 | 705-08-05080 | 12-Foot Double Gates for Chain Link Fence (8-Foot Height) | 1 | DBGT | 1,900.00 | 1,900.00 | 1,850.00 | 1,850.00 | | 0075 | 706-01-00100 | Concrete Walk (4" Thick) | 9,786.4 | SQYD | 60.00 | 587,184.00 | 40.00 | 391,456.00 | | 0076 | 706-01-00300 | Concrete Walk (6" Thick) | 39.6 | SQYD | 80.00 | 3,168.00 | 140.00 | 5,544.00 | | 0077 | 706-02-00200 | Concrete Drive (6" Thick) | 3,118.4 | SQYD | 100.00 | 311,840.00 | 80.00 | 249,472.00 | | 0078 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 10.4 | SQYD | 100.00 | 1,040.00 | 300.00 | 3,120.00 | | 0079 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Red) (11" Thick) | 652 | SQYD | 200.00 | 130,400.00 | 130.00 | 84,760.00 | | 0080 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (Red) (9" Thick) | 1,356.2 | SQYD | 160.00 | 216,992.00 | 100.00 | 135,620.00 | | 0081 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 3,000.00 | 12,000.00 | 3,000.00 | 12,000.00 | | 0082 | 707-01-00100 | Concrete Curb | 3,157 | LNFT | 33.50 | 105,759.50 | 20.00 | 63,140.00 | | 0083 | 707-03-00100 | Combination Concrete Curb and Gutter | 28,214.2 | LNFT | 33.50 | 945,175.70 | 27.00 | 761,783.40 | | 0084 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 3,872 | SQYD | 85.00 | 329,120.00 | 80.00 | 309,760.00 | | 0085 | 711-04-00100 | Geotextile Fabric | 3,872 | SQYD | 2.25 | 8,712.00 | 2.00 | 7,744.00 | | 0086 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 640,000.00 | 640,000.00 | 400,000.00 | 400,000.00 | | 0087 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 600 | LNFT | 0.50 | 300.00 | 1.50 | 900.00 | | 0088 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.18 | MILE | 600.00 | 2,508.00 | 2,500.00 | 10,450.00 | | 0089 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 20 | EACH | 50.00 | 1,000.00 | 100.00 | 2,000.00 | | 0090 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 20 | EACH | 50.00 | 1,000.00 | 100.00 | 2,000.00 | | 0091 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 20 | EACH | 50.00 | 1,000.00 | 100.00 | 2,000.00 | | 0092 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 10,000.00 | 40,000.00 | 15,000.00 | 60,000.00 | | 0093 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | | 0094 | 726-01-00100 | Bedding Material | 2,820 | CUYD | 80.00 | 225,600.00 | 70.00 | 197,400.00 | | 0095 | 727-01-00100 | Mobilization | 1 | LUMP | 1,800,000.00 | 1,800,000.00 | 2,000,000.00 | 2,000,000.00 | | 0096 | 728-01-00400 | Jacked or Bored Pipe (8") (6" I.D.) (Sewer Service Line) | 120 | LNFT | 350.00 | 42,000.00 | 100.00 | 12,000.00 | | 0097 | 728-01-00650 | Jacked or Bored Pipe (14") (12" I.D.) | 113 | LNFT | 380.00 | 42,940.00 | 180.00 | 20,340.00 | | 0098 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 152.2 | SQFT | 45.00 | 6,849.00 | 40.00 | 6,088.00 | | 0099 | 729-01-00103 | Sign (Type A)(Relocate) | 29.3 | SQFT | 45.00 | 1,318.50 | 43.00 | 1,259.90 | | 0100 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 184.1 | SQFT | 60.00 | 11,046.00 | 56.00 | 10,309.60 | | 0101 | 729-02-00103 | Sign (Type B)(Relocate) | 8.5 | SQFT | 50.00 | 425.00 | 45.00 | 382.50 | | 0102 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 95.00 | 380.00 | | 0103 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 45 | EACH | 200.00 | 9,000.00 | 195.00 | 8,775.00 | | 0104 | 731-02-00100 | Reflectorized Raised Pavement Markers | 698 | EACH | 15.00 | 10,470.00 | 10.00 | 6,980.00 | | 0105 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 168 | LNFT | 26.00 | 4,368.00 | 25.00 | 4,200.00 | | 0106 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.419 | MILE | 6,000.00 | 38,514.00 | 7,500.00 | 48,142.50 | | 0107 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.461 | MILE | 1,800.00 | 829.80 | 25,000.00 | 11,525.00 | | 0108 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.82 | MILE | 13,000.00 | 36,660.00 | 2,500.00 | 7,050.00 | | 0109 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.209 | MILE | 6,400.00 | 1,337.60 | 15,000.00 | 3,135.00 | | 0110 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.035 | MILE | 52,000.00 | 1,820.00 | 86,000.00 | 3,010.00 | | 0111 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 525.00 | 1,575.00 | 1,000.00 | 3,000.00 | | 0112 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 450.00 | 2,250.00 | 1,000.00 | 5,000.00 | | 0113 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 450.00 | 2,250.00 | 1,000.00 | 5,000.00 | | 0114 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 4 | EACH | 1,050.00 | 4,200.00 | 2,500.00 | 10,000.00 | | 0115 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 1 | EACH | 1,050.00 | 1,050.00 | 2,500.00 | 2,500.00 | | 0116 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 425.00 | 850.00 | 1,500.00 | 3,000.00 | | 0117 | 732-05-00100 | Removal of Existing Markings | 0.162 | MILE | 52,000.00 | 8,424.00 | 32,000.00 | 5,184.00 | | 0118 | 735-01-00100 | Mailboxes | 15 | EACH | 1.00 | 15.00 | 20.00 | 300.00 | | 0119 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 275.00 | 3,025.00 | 250.00 | 2,750.00 | | 0120 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 525.00 | 1,050.00 | 350.00 | 700.00 | | 0121 | 739-01-00100 | Hydro-Seeding | 12.53 | ACRE | 3,000.00 | 37,590.00 | 2,500.00 | 31,325.00 | | 0122 | 740-01-00100 | Construction Layout | 1 | LUMP | 110,000.00 | 110,000.00 | 250,000.00 | 250,000.00 | | 0123 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | | 0124 | 741-01-01100 | Water Main (8" PVC) | 3,100 | LNFT | 80.00 | 248,000.00 | 70.00 | 217,000.00 | | 0125 | 741-01-01140 | Water Main (12" PVC) | 643 | LNFT | 160.00 | 102,880.00 | 140.00 | 90,020.00 | | 0126 | 741-02-00400 | Gate Valve (8") | 9 | EACH | 3,000.00 | 27,000.00 | 1,600.00 | 14,400.00 | | 0127 | 741-03-00600 | Tapping Sleeve and Valve Assembly (12") (Water Line Hot Tap) | 2 | EACH | 15,000.00 | 30,000.00 | 8,500.00 | 17,000.00 | | 0128 | 741-04-00100 | Fire Hydrant (Fire Hydrant Assembly) | 4 | EACH | 10,000.00 | 40,000.00 | 6,000.00 | 24,000.00 | | 0129 | 741-05-01040 | Water Service Line (1" PVC) | 1,321 | LNFT | 50.00 | 66,050.00 | 12.00 | 15,852.00 | | 0130 | 741-08-00100 | Relocating Water Meter | 24 | EACH | 415.00 | 9,960.00 | 525.00 | 12,600.00 | | 0131 | 741-09-00100 | Adjusting Water House Connections | 24 | EACH | 400.00 | 9,600.00 | 100.00 | 2,400.00 | | 0132 | 742-01-00400 | Sanitary Sewer Pipe (8") | 1,119 | LNFT | 70.00 | 78,330.00 | 88.00 | 98,472.00 | | 0133 | 742-01-00500 | Sanitary Sewer Pipe (10") | 331 | LNFT | 90.00 | 29,790.00 | 125.00 | 41,375.00 | | 0134 | 742-01-00600 | Sanitary Sewer Pipe (12") | 940 | LNFT | 130.00 | 122,200.00 | 158.00 | 148,520.00 | | 0135 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 17 | EACH | 1,500.00 | 25,500.00 | 225.00 | 3,825.00 | | 0136 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 1,022 | LNFT | 70.00 | 71,540.00 | 60.00 | 61,320.00 | | 0137 | 804-01-00300 | Precast Concrete Piles (16") | 8,000 | LNFT | 90.00 | 720,000.00 | 90.00 | 720,000.00 | | 0138 | 804-10-00300 | Precast Concrete Indicator Piles (16") | 2 | EACH | 24,000.00 | 48,000.00 | 50,000.00 | 100,000.00 | | 0139 | 804-14-00100 | Dynamic Monitoring Assistance | 14 | EACH | 4,500.00 | 63,000.00 | 1,500.00 | 21,000.00 | | 0140 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | 0141 | 804-18-00100 | Vibration Monitoring | 40 | DAY | 850.00 | 34,000.00 | 800.00 | 32,000.00 | | 0142 | 805-12-00900 | Bridge Superstructure and Substructure (26' Clear Roadway, 7' Sidewalk, 45 Degree Crossing) | 9,360 | SQFT | 140.00 | 1,310,400.00 | 150.00 | 1,404,000.00 | | 0143 | 805-15-01800 | Reinforced Concrete Box Culverts (Precast) (8' x 7') | 744 | LNFT | 1,300.00 | 967,200.00 | 900.00 | 669,600.00 | | 0144 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Headwall for 8' x 7' Precast Box Culvert) | 2 | EACH | 45,000.00 | 90,000.00 | 35,000.00 | 70,000.00 | | 0145 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,178 | SQFT | 2.00 | 8,356.00 | 1.00 | 4,178.00 | | 0146 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,178 | SQFT | 2.00 | 8,356.00 | 5.00 | 20,890.00 | | 0147 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 180.00 | 64,800.00 | 100.00 | 36,000.00 | | 0148 | 810-03-00100 | Concrete and Metal Bridge Railing | 360 | LNFT | 300.00 | 108,000.00 | 250.00 | 90,000.00 | | 0149 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (26' Clear Roadway, 45 degree crossing, without Asphalt) | 4,320 | SQFT | 110.00 | 475,200.00 | 80.00 | 345,600.00 | | 0150 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) (For Future Lighting) | 8,052 | LNFT | 20.00 | 161,040.00 | 30.00 | 241,560.00 | | 0151 | NS-300-00060 | Geogrid (Box Culvert) | 1,736 | SQYD | 3.00 | 5,208.00 | 5.73 | 9,947.28 | | 0152 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 7,161 | INLF | 1.00 | 7,161.00 | 0.75 | 5,370.75 | | 0153 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,810 | INLF | 1.00 | 1,810.00 | 0.85 | 1,538.50 | | 0154 | NS-702-00100 | Paved Gutter Drain (Double) | 14 | EACH | 5,000.00 | 70,000.00 | 8,000.00 | 112,000.00 | | 0155 | NS-702-00100 | Paved Gutter Drain (Single) | 33 | EACH | 3,500.00 | 115,500.00 | 5,000.00 | 165,000.00 | | 0156 | TS-821-00310 | Sewer Lift Station Adjustments (Relocate Electrical Controls) | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0157 | TS-MSC-00400 | Gas Line (4") | 1,488 | LF | 30.00 | 44,640.00 | 30.00 | 44,640.00 | | 0158 | TS-MSC-00410 | Gas Line tapping sleeve and valve (4") | 2 | EACH | 6,000.00 | 12,000.00 | 4,000.00 | 8,000.00 | | 0159 | TS-MSC-00420 | Gas Pipeline Steel Casing (10") | 113 | LF | 150.00 | 16,950.00 | 200.00 | 22,600.00 | | 0160 | TS-MSC-00430 | Gas Service Line (3/4" Diameter) | 6 | LF | 12.00 | 72.00 | 100.00 | 600.00 | | 0161 | TS-MSC-00440 | Gas Service Line Tap, Riser and Valve Tee | 1 | EACH | 700.00 | 700.00 | 500.00 | 500.00 | | 0162 | TS-MSC-00450 | Gas Pipeline Marker | 2 | EACH | 300.00 | 600.00 | 50.00 | 100.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 19,461,578.17 | | 20,340,110.33 |
|