Proposal:H.010100.6
Parish:Iberia
Description:PESSON ELEMENTARY SIDEWALKS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$270,407.95
| Rank | License | Bidder | Construction Bid |
| 1 | 71746 | Diversity Construction and Engineering, LLC | $274,134.70 |
| 2 | 46747 | Triumph Construction, LLC | $333,000.00 |
| 3 | 65305 | McCoy Group, LLC | $433,623.91 |
| 4 | 30774 | Progressive Construction Co., LLC | $448,788.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diversity Construction and Engineering, LLC | - 2 - Triumph Construction, LLC | - 3 - McCoy Group, LLC | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.84 | LUMP | 15,000.00 | 15,000.00 | 2,300.00 | 2,300.00 | 16,338.50 | 16,338.50 | 14,000.00 | 14,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 4,045.00 | 4,045.00 | 8,538.54 | 8,538.54 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 340 | SQYD | 50.00 | 17,000.00 | 17.50 | 5,950.00 | 45.28 | 15,395.20 | 47.00 | 15,980.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 54 | LNFT | 42.00 | 2,268.00 | 5.75 | 310.50 | 14.25 | 769.50 | 21.00 | 1,134.00 | | 0005 | 202-02-12020 | Removal of Fence (Chain Link) | 967 | LNFT | 1.60 | 1,547.20 | 7.75 | 7,494.25 | 15.92 | 15,394.64 | 8.00 | 7,736.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,000.00 | 5,000.00 | 16,650.00 | 16,650.00 | 16,646.45 | 16,646.45 | 44,000.00 | 44,000.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 76 | EACH | 50.00 | 3,800.00 | 24.00 | 1,824.00 | 45.52 | 3,459.52 | 35.00 | 2,660.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 2,434 | LNFT | 5.00 | 12,170.00 | 1.75 | 4,259.50 | 2.42 | 5,890.28 | 3.00 | 7,302.00 | | 0009 | 701-07-00300 | Yard Drain Pipe (8") | 20 | LNFT | 15.00 | 300.00 | 83.00 | 1,660.00 | 120.43 | 2,408.60 | 62.00 | 1,240.00 | | 0010 | 702-04-00200 | Adjusting Catch Basins | 15 | EACH | 750.00 | 11,250.00 | 1,930.00 | 28,950.00 | 2,060.92 | 30,913.80 | 3,300.00 | 49,500.00 | | 0011 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 26 | LNFT | 46.00 | 1,196.00 | 42.50 | 1,105.00 | 80.16 | 2,084.16 | 30.00 | 780.00 | | 0012 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 925 | LNFT | 46.00 | 42,550.00 | 37.75 | 34,918.75 | 50.91 | 47,091.75 | 40.00 | 37,000.00 | | 0013 | 705-07-04060 | 6-Foot Single Gates for Chain Link Fence (7-Foot Height) | 1 | EACH | 1,000.00 | 1,000.00 | 1,665.00 | 1,665.00 | 1,954.43 | 1,954.43 | 950.00 | 950.00 | | 0014 | 705-07-06060 | 8-Foot Single Gates for Chain Link Fence (7-Foot Height) | 1 | EACH | 1,000.00 | 1,000.00 | 2,010.00 | 2,010.00 | 2,759.76 | 2,759.76 | 1,000.00 | 1,000.00 | | 0015 | 705-08-07060 | 16-Foot Double Gates for Chain Link Fence (7-Foot Height) | 1 | DBGT | 1,500.00 | 1,500.00 | 3,670.00 | 3,670.00 | 4,522.27 | 4,522.27 | 2,000.00 | 2,000.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 1,619.8 | SQYD | 45.00 | 72,891.00 | 30.25 | 48,998.95 | 59.94 | 97,090.81 | 84.00 | 136,063.20 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 133.6 | SQYD | 50.00 | 6,680.00 | 52.00 | 6,947.20 | 131.64 | 17,587.10 | 95.00 | 12,692.00 | | 0018 | 706-04-00100 | Handicapped Curb Ramps (Type 2) | 1 | EACH | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | 2,957.54 | 2,957.54 | 2,500.00 | 2,500.00 | | 0019 | 706-04-00100 | Handicapped Curb Ramps (Type 5) | 1 | EACH | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | 3,175.63 | 3,175.63 | 2,500.00 | 2,500.00 | | 0020 | 706-04-00100 | Handicapped Curb Ramps (Type 7) | 9 | EACH | 1,000.00 | 9,000.00 | 1,655.00 | 14,895.00 | 3,186.32 | 28,676.88 | 2,500.00 | 22,500.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,500.00 | 27,500.00 | 56,500.00 | 56,500.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | 0022 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,210 | SQYD | 2.50 | 3,025.00 | 21.00 | 25,410.00 | 15.03 | 18,186.30 | 9.00 | 10,890.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 41,555.90 | 41,555.90 | 40,000.00 | 40,000.00 | 44,000.00 | 44,000.00 | | 0024 | 729-01-00103 | Sign (Type A)(Relocate) | 62.3 | SQFT | 25.00 | 1,557.50 | 11.50 | 716.45 | 12.32 | 767.54 | 13.50 | 841.05 | | 0025 | 729-21-00100 | U-Channel Post | 9 | EACH | 200.00 | 1,800.00 | 259.00 | 2,331.00 | 277.32 | 2,495.88 | 160.00 | 1,440.00 | | 0026 | 735-01-00100 | Mailboxes | 6 | EACH | 200.00 | 1,200.00 | 1.25 | 7.50 | 1.23 | 7.38 | 10.00 | 60.00 | | 0027 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 150.00 | 900.00 | 390.00 | 2,340.00 | 419.05 | 2,514.30 | 520.00 | 3,120.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 11,500.00 | 11,500.00 | 24,650.45 | 24,650.45 | 6,000.00 | 6,000.00 | | 0029 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 1,000.00 | 1,000.00 | 446.00 | 446.00 | 269.34 | 269.34 | 350.00 | 350.00 | | 0030 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 1 | EACH | 1,000.00 | 1,000.00 | 940.00 | 940.00 | 1,077.36 | 1,077.36 | 550.00 | 550.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 274,134.70 | | 333,000.00 | | 433,623.91 | | 448,788.25 |
|