Proposal:H.014501.6
Parish:Livingston
Routes:LA 441
Description:LA 441: US 190 - LA 442
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,732,397.27
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $4,470,231.70 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,643,160.23 |
| 3 | 12031 | R.J. Daigle & Sons Contractors, Inc | $5,638,641.13 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $6,366,842.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - R.J. Daigle & Sons Contractors, Inc | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) approximately 3 trees by cross drain at approximately 38+96 | 0.069 | LUMP | 7,500.00 | 7,500.00 | 7,500.00 | 7,500.00 | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 337.5 | LNFT | 16.00 | 5,400.00 | 8.75 | 2,953.13 | 9.13 | 3,081.38 | 10.00 | 3,375.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMPA | 401 | LNFT | 30.00 | 12,030.00 | 20.00 | 8,020.00 | 13.20 | 5,293.20 | 30.00 | 12,030.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" RCPA | 157 | LNFT | 32.00 | 5,024.00 | 30.00 | 4,710.00 | 13.20 | 2,072.40 | 35.00 | 5,495.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMPA | 206 | LNFT | 32.00 | 6,592.00 | 40.00 | 8,240.00 | 13.20 | 2,719.20 | 40.00 | 8,240.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 54" RCPA | 42 | LNFT | 32.00 | 1,344.00 | 50.00 | 2,100.00 | 26.40 | 1,108.80 | 45.00 | 1,890.00 | | 0007 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 155.00 | 620.00 | 150.00 | 600.00 | 165.00 | 660.00 | 200.00 | 800.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 11,185 | CUYD | 1.00 | 11,185.00 | 12.00 | 134,220.00 | 6.50 | 72,702.50 | 30.00 | 335,550.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 1,700 | LNFT | 4.00 | 6,800.00 | 9.00 | 15,300.00 | 8.93 | 15,181.00 | 8.00 | 13,600.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 68 | EACH | 165.00 | 11,220.00 | 100.00 | 6,800.00 | 165.00 | 11,220.00 | 135.00 | 9,180.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 48,000 | LNFT | 1.95 | 93,600.00 | 1.00 | 48,000.00 | 2.15 | 103,200.00 | 1.65 | 79,200.00 | | 0012 | 303-02-00100 | Removal of Existing Patches | 1,334 | SQYD | 1.00 | 1,334.00 | 17.00 | 22,678.00 | 12.95 | 17,275.30 | 25.00 | 33,350.00 | | 0013 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 74,688 | SQYD | 9.00 | 672,192.00 | 10.00 | 746,880.00 | 10.89 | 813,352.32 | 10.00 | 746,880.00 | | 0014 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 80.00 | 8,000.00 | 75.00 | 7,500.00 | 115.50 | 11,550.00 | 100.00 | 10,000.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 24,436.5 | TON | 87.00 | 2,125,975.50 | 86.00 | 2,101,539.00 | 104.00 | 2,541,396.00 | 125.00 | 3,054,562.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,663.1 | TON | 129.00 | 214,539.90 | 140.00 | 232,834.00 | 1.00 | 1,663.10 | 175.00 | 291,042.50 | | 0017 | 509-01-00100 | Milling Asphalt Pavement 2" | 56,048 | SQYD | 1.50 | 84,072.00 | 2.50 | 140,120.00 | 4.00 | 224,192.00 | 3.00 | 168,144.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement 5"AVG. | 152 | SQYD | 9.50 | 1,444.00 | 6.00 | 912.00 | 10.74 | 1,632.48 | 25.00 | 3,800.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement 6" | 6,767 | SQYD | 4.25 | 28,759.75 | 6.00 | 40,602.00 | 11.21 | 75,858.07 | 6.00 | 40,602.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,265 | CUYD | 0.01 | -42.65 | 0.10 | -426.50 | 0.01 | -42.65 | 0.30 | -1,279.50 | | 0021 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 12 | SQYD | 300.00 | 3,600.00 | 200.00 | 2,400.00 | 404.80 | 4,857.60 | 500.00 | 6,000.00 | | 0022 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 320 | LNFT | 250.00 | 80,000.00 | 120.00 | 38,400.00 | 178.74 | 57,196.80 | 215.00 | 68,800.00 | | 0023 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 160 | LNFT | 250.00 | 40,000.00 | 175.00 | 28,000.00 | 192.29 | 30,766.40 | 245.00 | 39,200.00 | | 0024 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 216 | LNFT | 250.00 | 54,000.00 | 220.00 | 47,520.00 | 208.04 | 44,936.64 | 270.00 | 58,320.00 | | 0025 | 701-02-02120 | Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) | 40 | LNFT | 425.00 | 17,000.00 | 335.00 | 13,400.00 | 285.68 | 11,427.20 | 300.00 | 12,000.00 | | 0026 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 88 | LNFT | 425.00 | 37,400.00 | 350.00 | 30,800.00 | 312.86 | 27,531.68 | 325.00 | 28,600.00 | | 0027 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 52 | LNFT | 550.00 | 28,600.00 | 420.00 | 21,840.00 | 467.16 | 24,292.32 | 435.00 | 22,620.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 224 | LNFT | 1.00 | 224.00 | 5.00 | 1,120.00 | 26.40 | 5,913.60 | 30.00 | 6,720.00 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 30.00 | 2,625.00 | 37.00 | 3,237.50 | 38.50 | 3,368.75 | 38.00 | 3,325.00 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 130.00 | 13,000.00 | 121.00 | 12,100.00 | 126.50 | 12,650.00 | 125.00 | 12,500.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,200.00 | 12,800.00 | 3,260.00 | 13,040.00 | 3,410.00 | 13,640.00 | 3,400.00 | 13,600.00 | | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 3.6 | SQYD | 220.00 | 792.00 | 670.00 | 2,412.00 | 132.00 | 475.20 | 1,000.00 | 3,600.00 | | 0033 | 707-01-00100 | Concrete Curb | 54 | LNFT | 107.00 | 5,778.00 | 102.00 | 5,508.00 | 39.60 | 2,138.40 | 100.00 | 5,400.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 335,000.00 | 335,000.00 | 265,000.00 | 265,000.00 | 400,000.00 | 400,000.00 | 300,000.00 | 300,000.00 | | 0035 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 228 | LNFT | 2.00 | 456.00 | 1.00 | 228.00 | 1.10 | 250.80 | 5.00 | 1,140.00 | | 0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.785 | MILE | 100.00 | 1,378.50 | 300.00 | 4,135.50 | 302.39 | 4,168.45 | 400.00 | 5,514.00 | | 0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.764 | MILE | 700.00 | 5,434.80 | 850.00 | 6,599.40 | 934.52 | 7,255.61 | 900.00 | 6,987.60 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.175 | MILE | 20.00 | 943.50 | 1,500.00 | 70,762.50 | 1,649.83 | 77,830.73 | 1,600.00 | 75,480.00 | | 0039 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 85.00 | 510.00 | 80.00 | 480.00 | 88.00 | 528.00 | 100.00 | 600.00 | | 0040 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 3,100.00 | 12,400.00 | 5,000.00 | 20,000.00 | 6,270.00 | 25,080.00 | 20,000.00 | 80,000.00 | | 0041 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 930.00 | 1,860.00 | 1,700.00 | 3,400.00 | 935.00 | 1,870.00 | 1,750.00 | 3,500.00 | | 0042 | 717-01-00100 | Seeding | 34.8 | LB | 16.00 | 556.80 | 29.00 | 1,009.20 | 16.50 | 574.20 | 30.00 | 1,044.00 | | 0043 | 718-01-00100 | Fertilizer | 1,160 | LB | 0.60 | 696.00 | 1.00 | 1,160.00 | 0.55 | 638.00 | 1.25 | 1,450.00 | | 0044 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,000.00 | 12,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 25,000.00 | 25,000.00 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.771 | MILE | 1,500.00 | 11,656.50 | 300.00 | 2,331.30 | 274.96 | 2,136.71 | 400.00 | 3,108.40 | | 0046 | 726-01-00100 | Bedding Material | 156 | CUYD | 1.00 | 156.00 | 85.00 | 13,260.00 | 99.00 | 15,444.00 | 125.00 | 19,500.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 320,000.00 | 320,000.00 | 350,000.00 | 350,000.00 | 700,000.00 | 700,000.00 | 600,000.00 | 600,000.00 | | 0048 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 100.00 | 1,200.00 | 100.00 | 1,200.00 | 110.00 | 1,320.00 | 110.00 | 1,320.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 150.00 | 600.00 | 110.00 | 440.00 | 110.00 | 440.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,374 | EACH | 8.00 | 18,992.00 | 8.00 | 18,992.00 | 8.25 | 19,585.50 | 8.00 | 18,992.00 | | 0051 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 76 | LNFT | 14.00 | 1,064.00 | 16.00 | 1,216.00 | 16.50 | 1,254.00 | 16.00 | 1,216.00 | | 0052 | 732-01-03040 | Plastic Pavement Striping (8" Width) (Preformed Tape) (DOTD Intersection Grade) | 22 | LNFT | 30.00 | 660.00 | 21.00 | 462.00 | 22.00 | 484.00 | 25.00 | 550.00 | | 0053 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.725 | MILE | 4,600.00 | 72,335.00 | 4,735.00 | 74,457.88 | 4,951.57 | 77,863.44 | 4,700.00 | 73,907.50 | | 0054 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.588 | MILE | 2,700.00 | 6,987.60 | 1,580.00 | 4,089.04 | 1,644.90 | 4,257.00 | 1,600.00 | 4,140.80 | | 0055 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.028 | MILE | 5,750.00 | 161.00 | 3,760.00 | 105.28 | 5,500.00 | 154.00 | 20,000.00 | 560.00 | | 0056 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,000.00 | 2,000.00 | 525.00 | 1,050.00 | 550.00 | 1,100.00 | 550.00 | 1,100.00 | | 0057 | 732-05-00100 | Removal of Existing Markings | 0.061 | MILE | 25,500.00 | 1,555.50 | 25,000.00 | 1,525.00 | 27,049.18 | 1,650.00 | 30,000.00 | 1,830.00 | | 0058 | 735-01-00100 | Mailboxes | 78 | EACH | 150.00 | 11,700.00 | 21.00 | 1,638.00 | 22.00 | 1,716.00 | 22.00 | 1,716.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 78 | EACH | 150.00 | 11,700.00 | 200.00 | 15,600.00 | 214.50 | 16,731.00 | 200.00 | 15,600.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,470,231.70 | | 4,643,160.23 | | 5,638,641.13 | | 6,366,842.80 |
|