Proposal:H.014212.6-R1
Parish:Iberville, St. Martin
Routes:I-10
Description:I-10: ATCHAFALAYA BRS NAVIG LIGHT REPL
Type Construction:ELECTRICAL BRIDGE REPAIRS AND RELATED WORK.
Estimated Construction Cost:$1,317,492.25
Maximum Number of Days Allowed for Construction:370
Calculated Daily User Cost:$3,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 51092 | Energy Solutions Technology, LLC | $1,729,781.40 | 125.00 | $2,104,781.40 |
| 2 | 00448 | WALTER J. BARNES ELECTRIC CO., INC. | $2,403,460.00 | 210.00 | $3,033,460.00 |
| 3 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $3,223,985.00 | 50.00 | $3,373,985.00 |
| 4 | 62810 | Ernest P. Breaux Electrical, L.L.C. | $2,496,907.50 | 330.00 | $3,486,907.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Energy Solutions Technology, LLC | - 2 - WALTER J. BARNES ELECTRIC CO., INC. | - 3 - SOUTHERN ROAD & BRIDGE, LLC | - 4 - Ernest P. Breaux Electrical, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of EXISTING ACCESS LADDERS ON BRIDGES A & B | 1 | LUMP | 11,500.00 | 11,500.00 | 13,000.00 | 13,000.00 | 68,500.00 | 68,500.00 | 11,500.00 | 11,500.00 | | 0002 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 39 | LNFT | 437.00 | 17,043.00 | 470.00 | 18,330.00 | 250.00 | 9,750.00 | 425.00 | 16,575.00 | | 0003 | 705-07-02060 | 4-Foot Single Gates for Chain Link Fence (7-Foot Height) | 2 | EACH | 2,990.00 | 5,980.00 | 3,300.00 | 6,600.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 109,861.80 | 109,861.80 | 285,000.00 | 285,000.00 | 300,000.00 | 300,000.00 | 239,000.00 | 239,000.00 | | 0005 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 1,897.50 | 7,590.00 | 25,000.00 | 100,000.00 | 15,000.00 | 60,000.00 | 16,250.00 | 65,000.00 | | 0006 | 727-01-00100 | Mobilization | 1 | LUMP | 116,494.69 | 116,494.69 | 315,000.00 | 315,000.00 | 350,000.00 | 350,000.00 | 318,950.00 | 318,950.00 | | 0007 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,176.00 | 7,176.00 | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | 24,000.00 | 24,000.00 | | 0008 | 807-01-00200 | Structural Metalwork (Grade 50) (Bridge A & B) | 14,400 | LUMP | 310,500.00 | 310,500.00 | 335,000.00 | 335,000.00 | 350,000.00 | 350,000.00 | 432,500.00 | 432,500.00 | | 0009 | 807-01-00200 | Structural Metalwork (Grade 50) (Bridge C) | 11,810 | LUMP | 178,500.00 | 178,500.00 | 225,000.00 | 225,000.00 | 300,000.00 | 300,000.00 | 258,650.00 | 258,650.00 | | 0010 | 807-01-00200 | Structural Metalwork (Grade 50) (Bridge D) | 12,710 | LUMP | 178,500.00 | 178,500.00 | 225,000.00 | 225,000.00 | 300,000.00 | 300,000.00 | 244,860.00 | 244,860.00 | | 0011 | 807-02-00100 | Structural Metalwork (Anchor Bolts) (Bridge A & B) | 40 | LUMP | 18,975.00 | 18,975.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 18,727.00 | 18,727.00 | | 0012 | 807-02-00100 | Structural Metalwork (Anchor Bolts) (Bridge C) | 50 | LUMP | 24,150.00 | 24,150.00 | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 | 23,835.00 | 23,835.00 | | 0013 | 807-02-00100 | Structural Metalwork (Anchor Bolts) (Bridge D) | 50 | LUMP | 24,150.00 | 24,150.00 | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 | 23,835.00 | 23,835.00 | | 0014 | 807-03-00100 | Structural Metalwork (Access System) (Bridge A & B) | 600 | LUMP | 5,750.00 | 5,750.00 | 6,200.00 | 6,200.00 | 100,000.00 | 100,000.00 | 30,730.00 | 30,730.00 | | 0015 | 807-03-00100 | Structural Metalwork (Access System) (Bridge C) | 300 | LUMP | 3,450.00 | 3,450.00 | 3,700.00 | 3,700.00 | 50,000.00 | 50,000.00 | 11,925.00 | 11,925.00 | | 0016 | 807-03-00100 | Structural Metalwork (Access System) (Bridge D) | 300 | LUMP | 3,450.00 | 3,450.00 | 3,700.00 | 3,700.00 | 50,000.00 | 50,000.00 | 11,925.00 | 11,925.00 | | 0017 | 822-01-00100 | Trenching and Backfilling | 545 | LNFT | 5.94 | 3,237.30 | 20.20 | 11,009.00 | 12.00 | 6,540.00 | 14.00 | 7,630.00 | | 0018 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (1#2 BARE STRANDED GROUND) | 30 | LNFT | 16.23 | 486.90 | 17.90 | 537.00 | 40.00 | 1,200.00 | 10.00 | 300.00 | | 0019 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (2#10, 1#10, BARE STRANDED GROUND) | 345 | LNFT | 10.16 | 3,505.20 | 11.20 | 3,864.00 | 24.00 | 8,280.00 | 8.00 | 2,760.00 | | 0020 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (3#10, 1#10 BARE STRANDED GROUND) | 290 | LNFT | 16.92 | 4,906.80 | 12.80 | 3,712.00 | 24.00 | 6,960.00 | 8.50 | 2,465.00 | | 0021 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (2#10, 1#10 INSULATED STRANDED GROUND) | 4,020 | LNFT | 10.59 | 42,571.80 | 59.55 | 239,391.00 | 26.00 | 104,520.00 | 25.00 | 100,500.00 | | 0022 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (3#10, 1#10 INSULATED STRANDED GROUND) | 2,420 | LNFT | 36.70 | 88,814.00 | 27.40 | 66,308.00 | 28.00 | 67,760.00 | 26.60 | 64,372.00 | | 0023 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (4#10, 1#10 INSULATED STRANDED GROUND) | 1,105 | LNFT | 49.39 | 54,575.95 | 26.20 | 28,951.00 | 28.00 | 30,940.00 | 27.40 | 30,277.00 | | 0024 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (5#10, 1#10 INSULATED STRANDED GROUND) | 1,520 | LNFT | 47.08 | 71,561.60 | 28.75 | 43,700.00 | 30.00 | 45,600.00 | 31.15 | 47,348.00 | | 0025 | 822-02-03100 | Conduit w Conductors (Liq Tight Flexible Metal) (3/4") (2#10, 1#10 INSULATED STRANDED GROUND) | 40 | LNFT | 46.96 | 1,878.40 | 15.25 | 610.00 | 50.00 | 2,000.00 | 48.00 | 1,920.00 | | 0026 | 822-02-03100 | Conduit w Conductors (Liq Tight Flexible Metal) (3/4") (3#10, 1#10 INSULATED STRANDED GROUND) | 40 | LNFT | 46.96 | 1,878.40 | 16.80 | 672.00 | 50.00 | 2,000.00 | 52.00 | 2,080.00 | | 0027 | 822-02-03100 | Conduit w Conductors (Liq Tight Flexible Metal) (3/4") (4#10, 1#10 INSULATED STRANDED GROUND) | 80 | LNFT | 19.74 | 1,579.20 | 16.35 | 1,308.00 | 50.00 | 4,000.00 | 56.00 | 4,480.00 | | 0028 | 822-02-03200 | Conduit w Conductors (Liq Tight Flexible Metal) (1") (5#10, 1#10 INSULATED STRANDED GROUND) | 80 | LNFT | 21.93 | 1,754.40 | 22.50 | 1,800.00 | 57.00 | 4,560.00 | 73.00 | 5,840.00 | | 0029 | 822-02-04200 | Conduit w Conductors (Fiberglass) (1") (2#10, 1#10 BARE STRANDED GROUND) | 10 | LNFT | 21.03 | 210.30 | 40.70 | 407.00 | 225.00 | 2,250.00 | 79.00 | 790.00 | | 0030 | 822-02-04200 | Conduit w Conductors (Fiberglass) (1") (3#10, 1#10 BARE STRANDED GROUND) | 20 | LNFT | 100.00 | 2,000.00 | 40.75 | 815.00 | 225.00 | 4,500.00 | 82.00 | 1,640.00 | | 0031 | 822-02-04200 | Conduit w Conductors (Fiberglass) (1") (4#10, 2#10 BARE STRANDED GROUND) | 10 | LNFT | 106.40 | 1,064.00 | 48.90 | 489.00 | 225.00 | 2,250.00 | 85.00 | 850.00 | | 0032 | 822-03-00100 | Conductors (NAV LIGHT SOOW CABLE) | 240 | LNFT | 8.04 | 1,929.60 | 23.00 | 5,520.00 | 55.00 | 13,200.00 | 24.00 | 5,760.00 | | 0033 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 90 | LNFT | 60.31 | 5,427.90 | 190.90 | 17,181.00 | 250.00 | 22,500.00 | 78.00 | 7,020.00 | | 0034 | 822-07-02800 | Luminaire (CHANNEL LIGHT) | 8 | EACH | 3,674.16 | 29,393.28 | 4,800.00 | 38,400.00 | 8,500.00 | 68,000.00 | 3,488.00 | 27,904.00 | | 0035 | 822-07-02800 | Luminaire (CHANNEL MARGIN LIGHT) | 16 | EACH | 3,551.88 | 56,830.08 | 4,600.00 | 73,600.00 | 12,500.00 | 200,000.00 | 3,245.00 | 51,920.00 | | 0036 | 822-07-02800 | Luminaire (LAMP OUT INDICATOR) | 24 | EACH | 478.89 | 11,493.36 | 630.00 | 15,120.00 | 900.00 | 21,600.00 | 1,526.00 | 36,624.00 | | 0037 | 822-09-00100 | Electrical System (Bridge A & B) | 1 | LUMP | 4,494.17 | 4,494.17 | 5,500.00 | 5,500.00 | 35,000.00 | 35,000.00 | 37,110.00 | 37,110.00 | | 0038 | 822-09-00100 | Electrical System (Bridge C) | 1 | LUMP | 4,526.54 | 4,526.54 | 5,500.00 | 5,500.00 | 35,000.00 | 35,000.00 | 24,218.00 | 24,218.00 | | 0039 | 822-09-00100 | Electrical System (Bridge D) | 1 | LUMP | 4,526.54 | 4,526.54 | 5,500.00 | 5,500.00 | 35,000.00 | 35,000.00 | 23,680.00 | 23,680.00 | | 0040 | 822-09-00100 | Electrical System (MAINTAIN EXISTING NAVIGATION LIGHTING SYSTEM) (Bridge A & B) | 1 | LUMP | 7,726.33 | 7,726.33 | 8,500.00 | 8,500.00 | 30,000.00 | 30,000.00 | 9,000.00 | 9,000.00 | | 0041 | 822-09-00100 | Electrical System (MAINTAIN EXISTING NAVIGATION LIGHTING SYSTEM) (Bridge C) | 1 | LUMP | 3,863.16 | 3,863.16 | 5,500.00 | 5,500.00 | 30,000.00 | 30,000.00 | 4,000.00 | 4,000.00 | | 0042 | 822-09-00100 | Electrical System (MAINTAIN EXISTING NAVIGATION LIGHTING SYSTEM) (Bridge D) | 1 | LUMP | 3,863.16 | 3,863.16 | 5,500.00 | 5,500.00 | 30,000.00 | 30,000.00 | 4,000.00 | 4,000.00 | | 0043 | 822-11-00100 | Removal and Disposal of Electrical Equipment (NAVIGATION LIGHTING) (Bridge A & B) | 1 | LUMP | 17,011.67 | 17,011.67 | 14,000.00 | 14,000.00 | 65,000.00 | 65,000.00 | 44,340.00 | 44,340.00 | | 0044 | 822-11-00100 | Removal and Disposal of Electrical Equipment (NAVIGATION LIGHTING) (Bridge C) | 1 | LUMP | 10,411.38 | 10,411.38 | 7,500.00 | 7,500.00 | 65,000.00 | 65,000.00 | 15,450.00 | 15,450.00 | | 0045 | 822-11-00100 | Removal and Disposal of Electrical Equipment (NAVIGATION LIGHTING) (Bridge D) | 1 | LUMP | 10,411.38 | 10,411.38 | 7,500.00 | 7,500.00 | 65,000.00 | 65,000.00 | 15,450.00 | 15,450.00 | | 0046 | 822-16-00300 | Underground Junction Box (13" x 24") | 3 | EACH | 4,476.08 | 13,428.24 | 2,100.00 | 6,300.00 | 1,500.00 | 4,500.00 | 1,350.00 | 4,050.00 | | 0047 | 822-17-00500 | Structure Junction Box (STAINLESS STEEL)(10"X8"X4") | 92 | EACH | 2,544.34 | 234,079.28 | 1,675.00 | 154,100.00 | 1,550.00 | 142,600.00 | 1,845.00 | 169,740.00 | | 0048 | 822-18-00100 | Service Pole | 3 | EACH | 1,576.61 | 4,729.83 | 2,300.00 | 6,900.00 | 6,850.00 | 20,550.00 | 1,200.00 | 3,600.00 | | 0049 | 822-21-00100 | Duct Marker (Concrete) | 2 | EACH | 1,145.03 | 2,290.06 | 400.00 | 800.00 | 1,850.00 | 3,700.00 | 480.00 | 960.00 | | 0050 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 545 | LNFT | 0.46 | 250.70 | 0.80 | 436.00 | 5.00 | 2,725.00 | 1.50 | 817.50 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,729,781.40 | | 2,403,460.00 | | 3,223,985.00 | | 2,496,907.50 |
|