Proposal:H.014011.6
Parish:St. Tammany
Description:N CARNATION ST PAVEMENT REHAB
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$1,510,412.70
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,056,465.05 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,078,391.40 |
| 3 | 62139 | Huey P. Stockstill, LLC | $1,496,847.40 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $1,830,643.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Huey P. Stockstill, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 83 | SQYD | 20.00 | 1,660.00 | 20.00 | 1,660.00 | 11.00 | 913.00 | 55.00 | 4,565.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 35 | SQYD | 45.00 | 1,575.00 | 20.00 | 700.00 | 13.00 | 455.00 | 150.00 | 5,250.00 | | 0003 | 202-02-03020 | Removal of Base – (Base Type) CLAYEY SAND WITH SHELL AND GRAVEL | 9,986 | SQYD | 1.50 | 14,979.00 | 2.00 | 19,972.00 | 2.00 | 19,972.00 | 3.75 | 37,447.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 79 | SQYD | 60.00 | 4,740.00 | 20.00 | 1,580.00 | 15.00 | 1,185.00 | 35.00 | 2,765.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 106 | LNFT | 31.00 | 3,286.00 | 20.00 | 2,120.00 | 20.00 | 2,120.00 | 20.00 | 2,120.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" CMPA | 32 | LNFT | 50.00 | 1,600.00 | 150.00 | 4,800.00 | 45.00 | 1,440.00 | 28.00 | 896.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 30" RCP | 207 | LNFT | 33.00 | 6,831.00 | 30.00 | 6,210.00 | 15.00 | 3,105.00 | 20.00 | 4,140.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 30 | EACH | 27.00 | 810.00 | 20.00 | 600.00 | 25.00 | 750.00 | 28.00 | 840.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 200.00 | 400.00 | 180.00 | 360.00 | 225.00 | 450.00 | 220.00 | 440.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 7,300 | LNFT | 1.75 | 12,775.00 | 1.60 | 11,680.00 | 2.00 | 14,600.00 | 1.50 | 10,950.00 | | 0011 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 10,482 | SQYD | 12.50 | 131,025.00 | 12.00 | 125,784.00 | 20.00 | 209,640.00 | 19.50 | 204,399.00 | | 0012 | 304-01-00100 | Lime | 165.1 | TON | 245.00 | 40,449.50 | 220.00 | 36,322.00 | 280.00 | 46,228.00 | 315.00 | 52,006.50 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 10,482 | SQYD | 2.75 | 28,825.50 | 1.25 | 13,102.50 | 6.00 | 62,892.00 | 4.25 | 44,548.50 | | 0014 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,215 | CUYD | 10.00 | 12,150.00 | 50.00 | 60,750.00 | 80.00 | 97,200.00 | 90.00 | 109,350.00 | | 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 49 | SQYD | 100.00 | 4,900.00 | 65.00 | 3,185.00 | 200.00 | 9,800.00 | 175.00 | 8,575.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 2,479.9 | TON | 103.00 | 255,429.70 | 110.00 | 272,789.00 | 100.00 | 247,990.00 | 175.00 | 433,982.50 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 109.1 | TON | 250.00 | 27,275.00 | 150.00 | 16,365.00 | 250.00 | 27,275.00 | 300.00 | 32,730.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 9,986 | SQYD | 2.75 | 27,461.50 | 3.25 | 32,454.50 | 3.00 | 29,958.00 | 5.00 | 49,930.00 | | 0019 | 701-14-00100 | Cleaning Existing Pipes | 2,968 | LNFT | 10.75 | 31,906.00 | 5.00 | 14,840.00 | 20.00 | 59,360.00 | 10.00 | 29,680.00 | | 0020 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 | 1,400.00 | 1,400.00 | 3,500.00 | 3,500.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 176 | LNFT | 20.00 | 3,520.00 | 5.00 | 880.00 | 5.00 | 880.00 | 55.00 | 9,680.00 | | 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 1,200.00 | 1,200.00 | 1,250.00 | 1,250.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 130.5 | LNFT | 75.00 | 9,787.50 | 60.00 | 7,830.00 | 65.00 | 8,482.50 | 75.00 | 9,787.50 | | 0024 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,500.00 | 3,500.00 | 3,700.00 | 3,700.00 | 4,000.00 | 4,000.00 | 4,500.00 | 4,500.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,000.00 | 9,000.00 | 3,700.00 | 11,100.00 | 4,000.00 | 12,000.00 | 4,500.00 | 13,500.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 229.7 | SQYD | 85.00 | 19,524.50 | 110.00 | 25,267.00 | 100.00 | 22,970.00 | 120.00 | 27,564.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 60,000.00 | 60,000.00 | 149,000.00 | 149,000.00 | 125,000.00 | 125,000.00 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.32 | MILE | 3,500.00 | 1,120.00 | 2,500.00 | 800.00 | 2,600.00 | 832.00 | 3,500.00 | 1,120.00 | | 0029 | 726-01-00100 | Bedding Material | 113.8 | CUYD | 1.25 | 142.25 | 115.00 | 13,087.00 | 90.00 | 10,242.00 | 125.00 | 14,225.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 95,000.00 | 95,000.00 | 149,000.00 | 149,000.00 | 135,000.00 | 135,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 93.00 | 372.00 | 105.00 | 420.00 | 110.00 | 440.00 | 125.00 | 500.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 103 | EACH | 20.00 | 2,060.00 | 11.00 | 1,133.00 | 12.00 | 1,236.00 | 12.50 | 1,287.50 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 15 | LNFT | 25.00 | 375.00 | 26.00 | 390.00 | 25.00 | 375.00 | 35.00 | 525.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.648 | MILE | 7,500.00 | 12,360.00 | 5,700.00 | 9,393.60 | 6,000.00 | 9,888.00 | 6,700.00 | 11,041.60 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.328 | MILE | 3,450.00 | 1,131.60 | 2,600.00 | 852.80 | 2,500.00 | 820.00 | 3,000.00 | 984.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 37,700.00 | 37,700.00 | 40,000.00 | 40,000.00 | | 0037 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 575.00 | 1,150.00 | 500.00 | 1,000.00 | 240.00 | 480.00 | 650.00 | 1,300.00 | | 0038 | 805-15-00200 | Reinforced Concrete Box Culverts (Precast) (5' x 4') | 200 | LNFT | 875.00 | 175,000.00 | 745.00 | 149,000.00 | 900.00 | 180,000.00 | 1,600.00 | 320,000.00 | | 0039 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (5' X 4' RCB, 10.9 CUYD & 345.92 LBS PER HEADWALL) | 2 | EACH | 20,000.00 | 40,000.00 | 20,000.00 | 40,000.00 | 25,000.00 | 50,000.00 | 30,000.00 | 60,000.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 264 | INLF | 2.25 | 594.00 | 1.00 | 264.00 | 10.00 | 2,640.00 | 1.00 | 264.00 | | 0041 | NS-702-00001 | Cleaning Existing Catch Basin | 30 | EACH | 425.00 | 12,750.00 | 400.00 | 12,000.00 | 597.63 | 17,928.90 | 500.00 | 15,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,056,465.05 | | 1,078,391.40 | | 1,496,847.40 | | 1,830,643.60 |
|