Proposal:H.013518.6
Parish:Ouachita
Description:OTIS STREET REHABILITATION
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, PEDESTRIAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,460,926.25
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $1,393,777.92 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $1,475,565.00 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,734,843.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 418 | SQYD | 30.00 | 12,540.00 | 18.00 | 7,524.00 | 12.00 | 5,016.00 | | 0002 | 203-01-00100 | General Excavation | 15,586 | CUYD | 4.00 | 62,344.00 | 6.00 | 93,516.00 | 20.00 | 311,720.00 | | 0003 | 203-03-00100 | Embankment | 15,336 | CUYD | 4.00 | 61,344.00 | 7.00 | 107,352.00 | 10.00 | 153,360.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 450 | CUYD | 25.00 | 11,250.00 | 35.00 | 15,750.00 | 18.00 | 8,100.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 5.00 | 3,750.00 | 6.00 | 4,500.00 | 1.00 | 750.00 | | 0006 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 673.5 | SQYD | 38.00 | 25,593.00 | 35.00 | 23,572.50 | 55.00 | 37,042.50 | | 0007 | 304-01-00100 | Lime | 23.5 | TON | 325.00 | 7,637.50 | 300.00 | 7,050.00 | 265.00 | 6,227.50 | | 0008 | 304-05-00100 | Lime Treatment (Type E) | 325 | SQYD | 52.00 | 16,900.00 | 25.00 | 8,125.00 | 50.00 | 16,250.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 105 | CUYD | 110.00 | 11,550.00 | 100.00 | 10,500.00 | 72.00 | 7,560.00 | | 0010 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 102.00 | 25,500.00 | 110.00 | 27,500.00 | 45.00 | 11,250.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,054.2 | TON | 185.00 | 195,027.00 | 155.00 | 163,401.00 | 125.00 | 131,775.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 42.5 | TON | 225.00 | 9,562.50 | 375.00 | 15,937.50 | 400.00 | 17,000.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 8,009 | SQYD | 7.00 | 56,063.00 | 5.00 | 40,045.00 | 2.00 | 16,018.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -418 | CUYD | 0.01 | -4.18 | 1.00 | -418.00 | 1.00 | -418.00 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 112.00 | 28,000.00 | 165.00 | 41,250.00 | 154.00 | 38,500.00 | | 0016 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 366 | LNFT | 92.00 | 33,672.00 | 120.00 | 43,920.00 | 100.00 | 36,600.00 | | 0017 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 186 | LNFT | 109.00 | 20,274.00 | 145.00 | 26,970.00 | 120.00 | 22,320.00 | | 0018 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 6,000.00 | 6,000.00 | 4,000.00 | 4,000.00 | 2,200.00 | 2,200.00 | | 0019 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 9,500.00 | 38,000.00 | 6,000.00 | 24,000.00 | 6,500.00 | 26,000.00 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 3,497.8 | SQYD | 72.00 | 251,841.60 | 85.00 | 297,313.00 | 88.00 | 307,806.40 | | 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 687 | LNFT | 50.00 | 34,350.00 | 45.00 | 30,915.00 | 45.00 | 30,915.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 145,000.00 | 145,000.00 | 79,000.00 | 79,000.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 14 | LNFT | 4.00 | 56.00 | 3.00 | 42.00 | 3.00 | 42.00 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1 | MILE | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 4,000.00 | 4,000.00 | | 0025 | 726-01-00100 | Bedding Material | 121.7 | CUYD | 115.00 | 13,995.50 | 100.00 | 12,170.00 | 198.00 | 24,096.60 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 135,000.00 | 135,000.00 | 145,000.00 | 145,000.00 | 170,000.00 | 170,000.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 166 | EACH | 22.00 | 3,652.00 | 10.00 | 1,660.00 | 17.00 | 2,822.00 | | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 14 | LNFT | 40.00 | 560.00 | 45.00 | 630.00 | 35.00 | 490.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.26 | MILE | 10,000.00 | 12,600.00 | 7,500.00 | 9,450.00 | 10,000.00 | 12,600.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.63 | MILE | 4,000.00 | 2,520.00 | 3,000.00 | 1,890.00 | 3,500.00 | 2,205.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 5,000.00 | 10,000.00 | 3,000.00 | 6,000.00 | 2,750.00 | 5,500.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | | 0033 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 2,200.00 | 2,200.00 | 1,000.00 | 1,000.00 | 195.00 | 195.00 | | 0034 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 13 | EACH | 1,000.00 | 13,000.00 | 3,000.00 | 39,000.00 | 2,700.00 | 35,100.00 | | 0035 | NS-201-00021 | Stump Removal (Under 36" Diameter) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,400.00 | 2,800.00 | | 0036 | TS-800-00100 | Pedestrian Bridge | 1 | LUMP | 92,000.00 | 92,000.00 | 100,000.00 | 100,000.00 | 185,000.00 | 185,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,393,777.92 | | 1,475,565.00 | | 1,734,843.00 |
|