Proposal:H.012966.6
Parish:Sabine
Routes:US 171
Description:US 171: CONVERSE TO DESOTO P/L
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,008,274.39
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $2,931,845.97 |
| 2 | 67822 | Earnest Contracting LLC | $3,590,152.25 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,955,692.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Earnest Contracting LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,398.4 | SQYD | 1.00 | 2,398.40 | 15.00 | 35,976.00 | 10.00 | 23,984.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 86 | SQYD | 25.00 | 2,150.00 | 20.00 | 1,720.00 | 60.00 | 5,160.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 2,795.5 | LNFT | 13.00 | 36,341.50 | 8.00 | 22,364.00 | 10.00 | 27,955.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,109 | SQYD | 1.00 | 1,109.00 | 15.00 | 16,635.00 | 13.00 | 14,417.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,399 | CUYD | 27.50 | 65,972.50 | 120.00 | 287,880.00 | 50.00 | 119,950.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 15,640.7 | TON | 110.00 | 1,720,477.00 | 120.50 | 1,884,704.35 | 135.00 | 2,111,494.50 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,204.4 | TON | 70.00 | 154,308.00 | 114.15 | 251,632.26 | 135.00 | 297,594.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 151,270 | SQYD | 1.30 | 196,651.00 | 3.00 | 453,810.00 | 2.00 | 302,540.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,262 | CUYD | 0.01 | -32.62 | 0.10 | -326.20 | 1.00 | -3,262.00 | | 0010 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 78 | SQYD | 43.50 | 3,393.00 | 81.55 | 6,360.90 | 184.00 | 14,352.00 | | 0011 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 918 | SQYD | 175.00 | 160,650.00 | 181.00 | 166,158.00 | 205.00 | 188,190.00 | | 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 600 | LNFT | 80.00 | 48,000.00 | 52.00 | 31,200.00 | 60.00 | 36,000.00 | | 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,562.5 | LNFT | 28.00 | 43,750.00 | 38.00 | 59,375.00 | 40.00 | 62,500.00 | | 0014 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 19.8 | LNFT | 130.00 | 2,574.00 | 200.00 | 3,960.00 | 215.00 | 4,257.00 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 95.00 | 19,000.00 | 110.00 | 22,000.00 | 120.00 | 24,000.00 | | 0016 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,650.00 | 36,500.00 | 3,800.00 | 38,000.00 | 3,200.00 | 32,000.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 119,250.00 | 119,250.00 | 35,000.00 | 35,000.00 | 125,000.00 | 125,000.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.424 | MILE | 425.00 | 6,555.20 | 500.00 | 7,712.00 | 200.00 | 3,084.80 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 15.424 | MILE | 600.00 | 9,254.40 | 600.00 | 9,254.40 | 650.00 | 10,025.60 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 30.848 | MILE | 900.00 | 27,763.20 | 900.00 | 27,763.20 | 1,000.00 | 30,848.00 | | 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.424 | MILE | 1,177.00 | 18,154.05 | 1,500.00 | 23,136.00 | 1,200.00 | 18,508.80 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 119,250.00 | 119,250.00 | 50,000.00 | 50,000.00 | 355,000.00 | 355,000.00 | | 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 105.00 | 1,260.00 | 110.00 | 1,320.00 | 125.00 | 1,500.00 | | 0024 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 2,067 | EACH | 11.00 | 22,737.00 | 11.00 | 22,737.00 | 12.00 | 24,804.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,018 | EACH | 6.50 | 6,617.00 | 6.50 | 6,617.00 | 7.00 | 7,126.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 455 | LNFT | 3.50 | 1,592.50 | 3.50 | 1,592.50 | 4.00 | 1,820.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.424 | MILE | 4,400.00 | 67,865.60 | 4,400.00 | 67,865.60 | 5,000.00 | 77,120.00 | | 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.712 | MILE | 1,895.00 | 14,614.24 | 1,895.00 | 14,614.24 | 2,000.00 | 15,424.00 | | 0029 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 325.00 | 975.00 | 325.00 | 975.00 | 350.00 | 1,050.00 | | 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 325.00 | 975.00 | 325.00 | 975.00 | 350.00 | 1,050.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 6,500.00 | 741.00 | 6,500.00 | 741.00 | 10,000.00 | 1,140.00 | | 0032 | 735-01-00100 | Mailboxes | 4 | EACH | 5.00 | 20.00 | 100.00 | 400.00 | 40.00 | 160.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 245.00 | 980.00 | 750.00 | 3,000.00 | 225.00 | 900.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,931,845.97 | | 3,590,152.25 | | 3,955,692.70 |
|