Proposal:H.012589.6
Parish:Calcasieu
Routes:LA 108 & LA 27
Description:LA 108: LA 1256 - I-10
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,666,627.58
| Rank | License | Bidder | Construction Bid |
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $4,935,743.38 |
| 2 | 34356 | Prairie Contractors LLC | $5,701,136.38 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R. E. Heidt Construction Co., LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 555.7 | LNFT | 10.10 | 5,612.57 | 30.00 | 16,671.00 | | 0002 | 202-02-06102 | Removal of Incidental Concrete Paving | 303 | SQYD | 11.11 | 3,366.33 | 35.00 | 10,605.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 2,997 | LNFT | 14.14 | 42,377.58 | 16.00 | 47,952.00 | | 0004 | 202-02-26300 | Removal of Median / Island | 25 | SQYD | 40.40 | 1,010.00 | 45.00 | 1,125.00 | | 0005 | 203-01-00100 | General Excavation | 255 | CUYD | 45.45 | 11,589.75 | 50.00 | 12,750.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,500.00 | 50,500.00 | 50,000.00 | 50,000.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 40 | CUYD | 35.35 | 1,414.00 | 45.00 | 1,800.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 24 | EACH | 151.50 | 3,636.00 | 175.00 | 4,200.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,974 | LNFT | 2.13 | 4,204.62 | 2.20 | 4,342.80 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 68 | CUYD | 155.00 | 10,540.00 | 200.00 | 13,600.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 33,491 | TON | 86.50 | 2,896,971.50 | 100.00 | 3,349,100.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,788 | TON | 90.00 | 250,920.00 | 67.00 | 186,796.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 176,043 | SQYD | 2.60 | 457,711.80 | 2.57 | 452,430.51 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,946 | CUYD | 0.01 | -69.46 | 0.01 | -69.46 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,580 | SQYD | 68.00 | 107,440.00 | 152.50 | 240,950.00 | | 0016 | 510-02-00100 | Pavement Widening 14" THICK | 15 | SQYD | 240.00 | 3,600.00 | 1,000.00 | 15,000.00 | | 0017 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 11 | EACH | 2,222.00 | 24,442.00 | 3,500.00 | 38,500.00 | | 0018 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 10 | EACH | 3,232.00 | 32,320.00 | 2,300.00 | 23,000.00 | | 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 712.80 | 712.80 | 1,000.00 | 1,000.00 | | 0020 | 702-04-00200 | Adjusting Catch Basins | 9 | EACH | 3,838.00 | 34,542.00 | 4,500.00 | 40,500.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,404 | LNFT | 78.78 | 110,607.12 | 85.00 | 119,340.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,044 | LNFT | 29.29 | 30,578.76 | 34.00 | 35,496.00 | | 0023 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 218.8 | LNFT | 40.40 | 8,839.52 | 45.00 | 9,846.00 | | 0024 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 108 | LNFT | 126.25 | 13,635.00 | 135.00 | 14,580.00 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 125 | LNFT | 95.95 | 11,993.75 | 105.00 | 13,125.00 | | 0026 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,545.00 | 4,545.00 | 5,000.00 | 5,000.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,989.50 | 15,958.00 | 4,500.00 | 18,000.00 | | 0028 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,636.00 | 29,088.00 | 4,000.00 | 32,000.00 | | 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,905 | SQYD | 69.69 | 132,759.45 | 75.00 | 142,875.00 | | 0030 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 86 | SQYD | 89.89 | 7,730.54 | 110.00 | 9,460.00 | | 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 520.7 | LNFT | 41.92 | 21,827.74 | 85.00 | 44,259.50 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 70,000.00 | 70,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 9,030 | LNFT | 0.26 | 2,347.80 | 0.01 | 90.30 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,473 | LNFT | 1.01 | 1,487.73 | 0.01 | 14.73 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 30.096 | MILE | 550.00 | 16,552.80 | 600.00 | 18,057.60 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 30.096 | MILE | 606.00 | 18,238.18 | 1.00 | 30.10 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.904 | MILE | 1,111.00 | 70,997.34 | 1,300.00 | 83,075.20 | | 0038 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 6 | EACH | 25.25 | 151.50 | 1.00 | 6.00 | | 0039 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 138 | EACH | 25.25 | 3,484.50 | 1.00 | 138.00 | | 0040 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 15 | EACH | 25.25 | 378.75 | 1.00 | 15.00 | | 0041 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 36 | EACH | 252.50 | 9,090.00 | 1.00 | 36.00 | | 0042 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.989 | MILE | 1,767.50 | 12,353.06 | 1,800.00 | 12,580.20 | | 0043 | 724-03-00100 | Rumble Strips (Intersection) | 4 | EACH | 1,515.00 | 6,060.00 | 1,500.00 | 6,000.00 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 320,000.00 | 320,000.00 | | 0045 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 101.00 | 1,010.00 | 65.00 | 650.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 13 | EACH | 111.10 | 1,444.30 | 120.00 | 1,560.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,951 | EACH | 6.57 | 19,388.07 | 7.00 | 20,657.00 | | 0048 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,010 | LNFT | 3.29 | 9,902.90 | 3.50 | 10,535.00 | | 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 491 | LNFT | 15.15 | 7,438.65 | 18.00 | 8,838.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.302 | MILE | 4,343.00 | 92,514.59 | 4,500.00 | 95,859.00 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.032 | MILE | 1,767.50 | 17,731.56 | 1,850.00 | 18,559.20 | | 0052 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.205 | MILE | 2,020.00 | 414.10 | 2,500.00 | 512.50 | | 0053 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.372 | MILE | 13,130.00 | 4,884.36 | 15,000.00 | 5,580.00 | | 0054 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) I-10 | 1 | EACH | 2,222.00 | 2,222.00 | 2,400.00 | 2,400.00 | | 0055 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 277.75 | 555.50 | 300.00 | 600.00 | | 0056 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 46 | EACH | 328.25 | 15,099.50 | 350.00 | 16,100.00 | | 0057 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 328.25 | 1,641.25 | 350.00 | 1,750.00 | | 0058 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 1 | EACH | 1,212.00 | 1,212.00 | 1,400.00 | 1,400.00 | | 0059 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 12 | EACH | 1,212.00 | 14,544.00 | 1,400.00 | 16,800.00 | | 0060 | 732-05-00100 | Removal of Existing Markings | 0.3 | MILE | 8,585.00 | 2,575.50 | 10,000.00 | 3,000.00 | | 0061 | 735-01-00100 | Mailboxes | 17 | EACH | 1.01 | 17.17 | 10.00 | 170.00 | | 0062 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 292.90 | 3,807.70 | 325.00 | 4,225.00 | | 0063 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 292.90 | 585.80 | 325.00 | 650.00 | | 0064 | 739-01-00100 | Hydro-Seeding | 0.03 | ACRE | 101,000.00 | 3,030.00 | 125,000.00 | 3,750.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 18,000.00 | 18,000.00 | | 0066 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,339.2 | INLF | 2.00 | 4,678.40 | 2.25 | 5,263.20 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,935,743.38 | | 5,701,136.38 |
|